Rasional pengembangan kapasitas lembaga
This presentation is the property of its rightful owner.
Sponsored Links
1 / 6

RASIONAL PENGEMBANGAN KAPASITAS LEMBAGA PowerPoint PPT Presentation


  • 134 Views
  • Uploaded on
  • Presentation posted in: General

RASIONAL PENGEMBANGAN KAPASITAS LEMBAGA. TUJUAN. PERMENDIKNAS NO 7 DAN NO 49 TH 2008. SASARAN. PERMENDIKNAS 63/2009. TGAS POKOK. FUNGSI. PROGRAM DAN KEGIATAN. VISI. MISI. KAPASITAS LEMBAGA. PENJAMINAN MUTU PENDIDIKAN (QA DAN QI). SATUAN PENDIDIKAN. SPM, SNP, RSBI, SBI.

Download Presentation

RASIONAL PENGEMBANGAN KAPASITAS LEMBAGA

An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -

Presentation Transcript


Rasional pengembangan kapasitas lembaga

RASIONAL PENGEMBANGAN KAPASITAS LEMBAGA


Rasional pengembangan kapasitas lembaga

TUJUAN

PERMENDIKNAS NO 7 DAN NO 49 TH 2008

SASARAN

PERMENDIKNAS 63/2009

TGAS POKOK

FUNGSI

PROGRAM DAN KEGIATAN

VISI

MISI

KAPASITAS LEMBAGA

PENJAMINAN MUTU PENDIDIKAN

(QA DAN QI)

SATUAN PENDIDIKAN

SPM, SNP, RSBI, SBI


Pertemuan ke 2

Pertemuanke 2:

  • Bagaimanaorganisasimelakukanpenjaminanmutupendidikan: penyusunandanvalidasiinstrumen, analisis data yang terkumpul, rumusanrekomendasi, danlaporan) ?

  • Apakah SIMP (EMIS) danketersediaan SDM dalampelaksanaan SPMP sudahmemadai?


Rasional pengembangan kapasitas lembaga

KAPASITAS LEMBAGA

?

P E N D I D I K A N

ICB

INSTRUMEN

EDL


Kesepakatan clc 2 gorontalo 11 s d 13 juni 2010

KESEPAKATAN CLC 2 GORONTALO11 S.D. 13 JUNI 2010

Pelaksanaan CLC Putaran ke-3 di LPMP Sulawesi Tenggara

Tanggalpelaksanaan 6 s.d 8 Agustus 2010 atau 30-31 Juli, dan 1 Agustus 2010

Data lengkap Tim pengembang QA/QI di-upload [email protected]


Rasional pengembangan kapasitas lembaga

4. Mengujicobakaninstrumen EDL Hasil CLC Putaranke-dua.

5. MempresentasikanHasilUjicobatersebutke CLC Putaranke-tigadiKendari (LPMP Sultra)

6. Semuakegiatan SPMP menghadirkannarasumberpusat yang membidangi (mendalami) SPMP dankriteria yang ditentukanolehklaster

7. Hasilkerjaklaster (Instrumen) yang telahdiperbaikidiuploadke yahoo mailinglist paling lambat 20 Juni 2010


  • Login