P11228 Week 9: Detailed Design Review. Japh Learn Joseph Corea Tim Monahan Bryan Reinheimer Ed Gliss. Agenda. Project Introduction Updated Workload Distribution Updated Engineering Specifications Finalized Designs System Packaging Steering Wheel Manual Back-up System

Download Presentation

P11228 Week 9: Detailed Design Review

An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -

Presentation Transcript


P11228Week 9: Detailed Design Review

Japh Learn

Joseph Corea

Tim Monahan

Bryan Reinheimer

Ed Gliss


Agenda

  • Project Introduction

  • Updated Workload Distribution

  • Updated Engineering Specifications

  • Finalized Designs

    • System Packaging

    • Steering Wheel

    • Manual Back-up System

    • Electronics and Control System

  • Feasibility Studies

  • Project Testing Plan

  • Updated System Risks


Workload Distribution

See Progress Tracking Excel File for in-depth workload distribution and tracking


Engineering Specifications


System Integration Design


System Integration Design


Steering Wheel Design


Steering Wheel Design


Manual Back-up Design


Electronics System Design


Control System Design


Feasibility Studies - Simulink


Feasibility Studies - Simulink


Feasibility Studies - Simulink


Feasibility StudyTire Test Consortium Data


Feasibility Study Ideal Acceleration


Feasibility StudyDesired Throttle Position


Feasibility StudyDesired Engine Speed


Clutch Testing Plan


MSD II Timeline


System Risks & BOM

  • https://edge.rit.edu/content/P11228/public/Risk%20Assessment

  • See Excel document for BOM