Toolik field station long range facilities plan science support vision workshop august 2012
This presentation is the property of its rightful owner.
Sponsored Links
1 / 13

Toolik Field Station Long Range Facilities Plan Science Support Vision Workshop August 2012 PowerPoint PPT Presentation


  • 99 Views
  • Uploaded on
  • Presentation posted in: General

Toolik Field Station Long Range Facilities Plan Science Support Vision Workshop August 2012. TFS Long Range Facilities Plan. Org Chart. CPS. ARSLS Management (Mike Mc). Alaska Ops (Marin). Facilities Management (Jud). TFS Ops Manager (Mike A). Alaska Science (Naomi).

Download Presentation

Toolik Field Station Long Range Facilities Plan Science Support Vision Workshop August 2012

An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -

Presentation Transcript


Toolik field station long range facilities plan science support vision workshop august 2012

Toolik Field StationLong Range Facilities PlanScience Support Vision WorkshopAugust 2012


Tfs long range facilities plan

TFS Long Range Facilities Plan

Org Chart

CPS

ARSLS Management (Mike Mc)

Alaska Ops

(Marin)

Facilities Management (Jud)

TFS Ops Manager

(Mike A)

Alaska Science

(Naomi)

Construction Management (Jay B)

Engineering (Jeff S)

Toolik Construction (Jason N)

Maintenance Lead

(Thom M)

TFS Maintenance

(Jeb / Faye)

Renewables

(Tracy D)

IT/Comms

(SRI)


Tfs long range facilities plan1

TFS Long Range Facilities Plan

  • LRFP Timeline and Status

    • In development since 2009

    • Draft Final document distributed 2011

    • Feedback received from stakeholders

    • Final review/approval underway

    • A “Living Document”, revised as necessary in the future


Tfs long range facilities plan2

TFS Long Range Facilities Plan

  • Why “Finalize” the LRFP?

    • Environmental Assessment (EA)required for new construction

      • EA must reference a comprehensive document for site development (eg – LRFP)

    • Planning and funding for large capital projects requires long lead times

    • Demonstrates a strategic vision and plan in the event new funding comes available


Tfs long range facilities plan3

TFS Long Range Facilities Plan

  • Capital Project Categories

    • Residential

      • Dorm

      • Bungalow

    • Science

      • Laboratories

      • Lecture Hall

      • Workshop

    • Site/Support Infrastructure

      • Garage

      • Generator Waste Heat Recovery

      • Road Lift/Realignment


Tfs long range facilities plan4

TFS Long Range Facilities Plan

  • Capital Project Approach

    • Residential

      • Dorm New Construction

      • Bungalow New Construction

    • Science

      • Laboratories New Construction

      • Lecture Hall

      • Workshop

    • Site/Support Infrastructure

      • Garage New Construction

      • Generator Waste Heat Recovery New Construction

      • Road Lift/RealignmentNew Construction


Tfs long range facilities plan5

TFS Long Range Facilities Plan

  • Capital Project Approach

    • Residential

      • Dorm New Construction

      • Bungalow New Construction

    • Science

      • Laboratories New Construction

      • Lecture Hall Repurposed Facilities

      • Workshop Repurposed Facilities

    • Site/Support Infrastructure

      • Garage New Construction

      • Generator Waste Heat Recovery New Construction

      • Road Lift/RealignmentNew Construction


Tfs long range facilities plan6

TFS Long Range Facilities Plan

New

Repurposed

Science Wrkshp


Tfs long range facilities plan7

TFS Long Range Facilities Plan

Initial Capital Projects

  • Dorm A

    • Two-story. Two wings. 24 rooms per wing. Total of 48 rooms. Two bed spaces per room = 96 potential bed spaces. Year-round capable

    • Central common areas (core) on both floors

  • Garage

    • 3-bay. 2300 ft2. Year-round.

  • Lab

    • Requirements still to be defined

  • Waste Heat Recovery

    • Generator waste heat used for Garage heating


Tfs long range facilities plan8

TFS Long Range Facilities Plan

Dorm


Tfs long range facilities plan9

TFS Long Range Facilities Plan

Garage


Tfs long range facilities plan10

TFS Long Range Facilities Plan

Bungalow


Tfs long range facilities plan11

TFS Long Range Facilities Plan

Initial Capital Project Timeline

Design

Site Prep

Bungalow

Construction

Design

Construction

Design

Site Prep

Lab 8

Construction

Design Complete

Construction