1 / 2

Preparation of WP5D Seoul meeting 25 th September, 2008

Preparation of WP5D Seoul meeting 25 th September, 2008. Juyeon Song. TTA Preparation of WP5D. Candidate contributions Spectrum WG 2.3GHz freq. arrangement of AWF (multi-country proposal) Modification of M.1036 update workplan Changing target date to the end of 2009 Technology WG

Download Presentation

Preparation of WP5D Seoul meeting 25 th September, 2008

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Preparation of WP5D Seoul meeting 25th September, 2008 Juyeon Song

  2. TTA Preparation of WP5D • Candidate contributions • Spectrum WG • 2.3GHz freq. arrangement of AWF (multi-country proposal) • Modification of M.1036 update workplan • Changing target date to the end of 2009 • Technology WG • Modification of TDT (technology Description Template) • Revision of Evaluation Report • Service WG • Revision of Long range WP5D work plan  TTA consider in-depth discussion technology WG items in this CJK meeting.

More Related