1 / 108

The Petroleum Registry of Alberta Energizing the flow of information

The Petroleum Registry of Alberta Energizing the flow of information. Registry Information Session. March 22, 2007. Agenda. EUB Topics Water Update Brine Source Wells Caverns Coal Bed Methane Wells EUB Directives and Bulletins Did You Know? GCA Update Strong Passwords

brody
Download Presentation

The Petroleum Registry of Alberta Energizing the flow of information

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. The Petroleum Registry of AlbertaEnergizing the flow of information Registry Information Session March 22, 2007

  2. Agenda • EUB Topics • Water Update • Brine Source Wells • Caverns • Coal Bed Methane Wells • EUB Directives and Bulletins • Did You Know? • GCA Update • Strong Passwords • Notification Suppression • CSV Upload Files • CSV for Upload for BA Users • Distribution Lists Questions/Break • Registry Pipeline Split Adjustment Project

  3. 1. EUB Topics

  4. WATER UPDATE

  5. Current State • EUB has always monitored water reporting. • A good source of your water reporting errors is the EUB noncompliance report, which is found in the Registry inbox. • The error codes are: • VME0015 – Metering difference is greater than 5% and less than 20%. • VME0020 – Metering difference is greater than 20%.

  6. Water Error Count

  7. Analysis • Asked the Oil and Gas Industry to voluntarily reduce water reporting errors. • No significant error reduction - Current Trend • Both VME0015 and VME0020 Water Reporting Error Counts Going up. • EUB is now actively investigating an enforcement path.

  8. Brine Source Wells

  9. Brine Source Wells Key Points • Brine Source wells are drilled into a saline aquifer for the purpose of producing Brine for non-oilfield related purposes. • Brine is used to make table salt or the kind of salt that is sprayed on highways as antifreeze and to enhance road traction.

  10. Reporting Requirement for Brine Water • EUB rules now allow a Brine well to be linked to a new battery subtype of 903 - Brine Production, in the Registry. • Effective January 2007 production month, companies are required to do volumetric reporting in the Registry for Brine Water Production and Disposition. • Prior to January 2007 production month Brine reporting was handled outside the Registry. Therefore, no retroactive adjustments are required via the Registry. • EUB has been contacting companies with existing wells that will have to change their reporting in the Registry.

  11. Definitions • Brackish Water (Saline water) • Water that has more than 4000 milligrams per liter [mg/L] of TDS (Total Dissolved Solids). • Fresh Water (Non-Saline Water) • All other groundwater and surface water that does not meet the definition of saline groundwater and has a TDS level less than 4000 mg/l. • Water • BS&W that is recovered in association with the production of oil and gas. • Brine • Is the well status “BRINE” in the Registry, used to represent wells that produce Brackish/Saline Water.

  12. Brine Reporting Step #1 Click Request Facility ID

  13. Brine Reporting Step #2 Input facility location No license # required Click Submit when complete Use Facility Sub-Type 903

  14. Brine Reporting Step #3 System will assign this Facility number

  15. Brine Reporting Step #4 Click Edit Well Status

  16. Brine Reporting Step #5 Highlight the current status and Click Delete

  17. Brine Reporting Step #6 Click Add

  18. Brine Reporting Step #7 From the Drop Down Menu, pick either Brine Flow of Brine Pump

  19. Brine Reporting Step #8 Attach the Brine well to the Brine facility, Input GCI, pool code and Click Submit.

  20. Brine Reporting Step #9 You will get this confirmation note when successfully completed

  21. Brine Reporting Step #10 Input data as “BRKWTR”

  22. CAVERNS

  23. Cavern Key Points • One of the common ways that caverns are created is by using a solution mining process. Fresh water is injected into a salt formation which results in Brine being produced. • Underground Caverns are used for: • Waste Disposal / Reclamation. • To store large volumes of hydrocarbons.

  24. Example Of An Underground Cavern Used For Storage

  25. Form S-25 • The S-25 is used to report waste disposed (injected into the cavern) as well as any volumes recovered including oil, solids and brine. • The S-25 statement is not part of the Petroleum Registry of Alberta and, therefore, is submitted to the EUB in paper format. • Generators of oilfield waste must independently enter disposition volumes into the Registry using the facility identifier code (AB WP) of the waste facility accepting the waste delivery. • For more information on Cavern reporting please refer to Directive 047, Ch.4.

  26. Sample S-25 Mark this box for Cavern Reporting

  27. COAL BED METHANE WELLS

  28. Coal Bed Methane Wells (CBM) Key points • Unlike conventional natural gas pools, CBM is found in deep porous rock formations. • CBM gas is found within coal seams sometimes at much shallower depths. • Rather than existing as free pools, the gas is bonded to the coal and is released through depressurization of the coal. • CBM is “sweet” gas, requiring little if any refining and is considered our cleanest burning fossil fuel.

  29. Coal Bed Methane Reporting • Infrastructure - under Well Status: • CBMCLS for wells completed in coal(s) only. • CBMOT for wells completed in coal(s) and another lithology such as sandstone etc. • Volumetric Reporting: • Similar to conventional Gas Production Reporting.

  30. CBM options

  31. Directives and Bulletins

  32. How To Find Directives And Bulletins • Found on EUB’s website www.eub.ca • Under Industry Zone – Rules, Regulations, Requirements.

  33. www.eub.ca From the Industry Zone Menu pick “Rules, Regulations, Requirements”

  34. BULLETINS

  35. DIRECTIVES

  36. Directives and Bulletins Used in This Presentation • Directive 007 (Production Accounting Handbook) • Directive 035 (CBM) • Directive 044 (Water Reporting) • Directive 047 (Caverns - S-25) • Bulletin 2006-11 (Water Definitions) Also, you can contact: • PA Helpdesk @ EUB 297-8952 • Wells Records Helpdesk@ EUB 297-8696

  37. 2. Did You Know?

  38. GCA Update • Overall the GCA subcommittee provided positive feedback on the 2006 GCA season, however there were some suggested changes. • All known and most suggested changes for GCA have been resolved in the Registry. • The Registry will be open several extra Sundays during the GCA season which are posted on the monthly Registry Operations and Service Desk hours calendars. • The expected AC2 reports are now being posted in the Registry Ministry Invoices and Statements.

  39. GCA Update cont’d • The expected AC5 reports will start to be posted in the Registry Ministry Invoices and Statements April 14, 2007. • There are two new summary reports being developed: • AC4 summary report is now available. • AC2 summary report which will be available for request in the Registry April 5, 2007. • Both reports will have a one line summary for each FCC id and will include whether the FCC submission is confirmed, unconfirmed or missing.

  40. Strong Passwords • Strong Password use in the Registry is now mandatory. • Designed to enhance Registry security. • Passwords must be at least six characters long and include 3 of these four elements: • Lower case letters. • Upper case letters. • Numbers. • Special characters.

  41. Notification Suppression • You may control the notifications that you receive, at any time, by deciding whether to accept or suppress them. • There are however three restrictions on your ability to suppress notifications. • BA Level Override - Any BA user with the Manage BA Notification Preferences task can override suppression choices for the BA. • One Recipient - Any BA user with the Manage BA Notification Preferences task can ensure that at least one applicable user receives a notification. For example, if you are the last user to choose to suppress a notification, you will not be able to make that suppression, and you must receive the notification.

  42. Notification Suppression cont’d • Registry Must Issue - Some notifications must be sent by the Registry to all applicable users. There is no ability to suppress these notifications. An example of a "Registry Must Issue" notification is the EUB Non Compliance Rpt - Auto Created Warning. • The Registry BA Inbox receives the original of every notification.

More Related