MVD WATER CONTROL MEETING

Loading in 2 Seconds...

play fullscreen
1 / 12

MVD WATER CONTROL MEETING - PowerPoint PPT Presentation


  • 124 Views
  • Uploaded on

MVD WATER CONTROL MEETING. October 2007. MEL PRICE LOCK AND DAM. MEL PRICE LOCK AND DAM. Pier 10. Pier 9. Pier 8. Pier 6. Pier 5. Pier 7. Top of Sill. Top of Stone. Bottom Of Concrete. MEL PRICE LOCK AND DAM. LOCK AND DAM 25. Top of Sill. Top of Rock. Bottom of Concrete.

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about ' MVD WATER CONTROL MEETING' - bena


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
mel price lock and dam1

MEL PRICE LOCK AND DAM

Pier 10

Pier 9

Pier 8

Pier 6

Pier 5

Pier 7

Top of Sill

Top of Stone

Bottom Of Concrete

lock and dam 25

LOCK AND DAM 25

Top of Sill

Top of Rock

Bottom of Concrete

ms river scour team team taskings
How widespread are the instances of scour? Are they in similar locations/conditions?

What criteria were used to design the scour protection? Is design criteria consistent?

Were construction deficiencies involved in the failure?

What criteria or design guidance changes are needed to prevent continuing occurrences of this scour?

What lessons, beyond changes to design criteria, need to be communicated to the rest of the Corps

Develop surveying and plotting standards that MVD will use to ensure that adequate surveys are taken an analyzed properly.

MS RIVER SCOUR TEAMTeam Taskings
lock and dam 20

LOCK AND DAM 20

14

10

11

12

13

lock and dam 18

LOCK AND DAM 18

6

7

15

9

8

5

3

1

14

11

10

12

4

2

13

ms river scour team team taskings1
How widespread are the instances of scour? Are they in similar locations/conditions?

What criteria were used to design the scour protection? Is design criteria consistent?

Were construction deficiencies involved in the failure?

What criteria or design guidance changes are needed to prevent continuing occurrences of this scour?

What lessons, beyond changes to design criteria, need to be communicated to the rest of the Corps

Develop surveying and plotting standards that MVD will use to ensure that adequate surveys are taken an analyzed properly.

MS RIVER SCOUR TEAMTeam Taskings