1 / 1

Scenario 1 (baseline): 21 EMQs + 13 power converters

COST COMPARISON PMQs / EMQs for the CCDTL Linac4 – MV 25.8.2009 (compiling information from A. Lombardi, T. Zickler, D. Nisbet, J.C. Guillaume). Scenario 1 (baseline): 21 EMQs + 13 power converters Scenario 2 (alternative): 14 PMQs + 7 EMQs + 7 power converters.

alisa
Download Presentation

Scenario 1 (baseline): 21 EMQs + 13 power converters

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. COST COMPARISON PMQs / EMQs for the CCDTL Linac4 – MV 25.8.2009(compiling information from A. Lombardi, T. Zickler, D. Nisbet, J.C. Guillaume) Scenario 1 (baseline): 21 EMQs + 13 power converters Scenario 2 (alternative): 14 PMQs + 7 EMQs + 7 power converters Cost PMQ option: 87’800 CHF, ~100’000 CHF Cost EMQ option: 253’000 CHF, ~250’000 CHF

More Related