An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. SAR-003-TRE-001 FERC-Ordered Modification to ERCOT waiver CPS2 BAL-001-TRE-1 Report to RSC October 7, 2008

  2. SAR-003 Meetings • Since Last Report to RSC on July 29 • SAR-003 Team met on • August 14th • September 2nd • September 9-10th (Preview to PDCWG) • September 16th • October 3rd • We have made significant progress

  3. Overview of the Standard • Standard applicable to BA, GOP and GO • BA to identify Reportable Events and provide necessary data to Texas RE • BA has the responsibility to ensure that correct Interconnection Minimum Frequency Response (MW/0.1Hz) is used • BA to calculate 12 month rolling average frequency response of the frequency responsive Resources of the interconnection and report the same to Texas RE

  4. Overview of the Standard • GOP shall report to BA the operating range where it is capable of providing required governor response and any variations considered on the expected frequency response of each Resource. • GO/GOP will limit governor dead bands of turbine governors to a limit • GO/GOP shall sustain its governor response to all frequency deviations that exceed the dead band except for valid reasons

  5. Task ahead • So far, we have completed a draft version of • Requirements • Measurements • Compliance • Violation Severity Levels • Review and modify each of these if necessary • Next Meeting of the team is October 23 • Present the draft in next RSC meeting in November

  6. Thanks • Any Questions?