Russell Cave Elementary – Renovation

Russell Cave Elementary – Renovation. Architect: Pearson & Peters Architects General Contractor: Congleton-Hacker Construction Substantial Completion Date: August, 2010 Contract Sum: $5,001,150 Change Orders to Date: $0 Current Phase: 1 (On Schedule) Estimated Completion: 6%. June 2009.

abedi
Download Presentation

Russell Cave Elementary – Renovation

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Russell Cave Elementary – Renovation Architect: Pearson & Peters Architects General Contractor: Congleton-Hacker Construction Substantial Completion Date: August, 2010 Contract Sum: $5,001,150 Change Orders to Date: $0 Current Phase: 1 (On Schedule) Estimated Completion: 6% June 2009

  2. Russell Cave Elementary – Renovation Rendering of Final Façade June 2009

  3. Russell Cave Elementary – Renovation Work Completed in Last 30 Days: Footing and foundation walls continue: 40 feet of footings poured and 38 feet of foundation wall have been poured Interior wall footings: 200 feet have been poured. Footings at new mechanical enclosures have been poured. Pads for mech units at kitchen and new transformer and generator have been poured. Current Work Effort (June): Additional work on footings and foundation at the new addition will continue. New floor slab will be poured in two weeks, weather permitting. Installation of the new leach fields for the septic system will begin installation in the front lawn of the building. Kitchen/Cafeteria demolition and renovation will begin. Renovation of (4) classrooms on the south side will begin. Masonry restoration on the existing building will begin the week of June 8th. June 2009

  4. Russell Cave Elementary – Renovation Foundation Work 6.2.09 Foundation Work 6.2.09 Foundation Work 6.2.09 Foundation Work 6.2.09 June 2009