30 likes | 119 Views
Installation of two Hydrogen Refuelling Stations (HRS) by Centre of Excellence for Low-Carbon Technologies. Objectives include setting up HRS for mobility applications, started in 2011 and open for regular use by 2013. The project involves technical equipment supply, hydrogen and nitrogen storage, drivetrain plant equipment, and hydrogen validation processes. Features capacity to fill up to 3 personal vehicles and 1 minibus daily with high hydrogen purity. Station dimensions: 2300 x 3500 x 2200 mm.
E N D
Slovenia: InstallationoftwoRefuellingStations(HRS) Investor: Centre ofExcellenceforlow-Carbon Technologies. Project objective: Setting up oftwo HRS – mobilityapplication Launched in November 2011: public tender for HRS, production process by Air-Liquide, designing the location implementation, placement into final locations, opening and regular use in 2013
HydrogenRefuellingStation (HRS)– technicalequipment Supplywarehouse storageequipmentandconnectionofsuppliedhydrogenincludingpumping (explanatory) sitesforhydrogen – thegascylinders in bundles storageequipmentandconnectionofnitrogensupplied in bundlesofcylinders Drivetrainplantandequipmentforfillinghydrogen at 350 bar, open framecontainerdimensions 20‘‘ compression set forairandhydrogen highintermediatestorageofhydrogen at 400 bar, fast-loading controller installationofchargingvehicleswithdisplay Processlevelequipment to validatethehydrogenconsumption Supervisoryleveldatastorage
HydrogenRefuellingStation (HRS)– characteristics • Capacity • filling up to 3 personalvehiclesdaily • filling up to 1 minibus (8m) daily • Vehiclefillingtimeframe • personalvehicle up to 10 min (betweentwofillings 20 min-buffer) • minibus (8m) up to 30 min • Thehydrogenpuritydegree • 99,98 % - processrequirementsofvehiclefuelcellstack • HRS dimensions • 2300 x 3500 x 2200 (w x l x h), standard frame