1 / 7

2 nd Why / Requirements Cause & Effect (Fishbone)

The 2 nd Why can be formed once the Team has Completed the 1 st Why. 2 nd Why / Requirements Development. 2 nd Why / Requirements Cause & Effect (Fishbone). 2 nd Why / Requirements FMEA. 2 nd Why / Requirements Examples. 2 nd Why / Requirements Development.

zocha
Download Presentation

2 nd Why / Requirements Cause & Effect (Fishbone)

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. The2nd Why can be formed once the Team has Completed the 1st Why 2nd Why / Requirements Development 2nd Why / Requirements Cause & Effect (Fishbone) 2nd Why / Requirements FMEA 2nd Why / Requirements Examples

  2. 2nd Why / Requirements Development D4 - Developing the 2nd Why / Requirements …Options The2nd Why defines the Requirements of the 1stWhy/ Functions Option 1:Use the Process Sequence Example ‘VALVE MANUFACTURING’ Option 2: Use the Product (Assembly) Components, Example ‘VALVE LEAKS’ TEST/ ASSEMBLY WASHER VALVE BODY ADAPTOR FLUID & FITMENT Option 3: Use a Circumstantial approach, Example ‘TEAM DISAGREEMENT’ NERVES ASSOCIATED ORGANS POSTURE SPINAL COLUMN MUSCLES DESIGN/ APPLICATION ASSEMBLY/ TEST RAW MATERIAL MACHINING TAPPING Option 4: Use a Process Orientated (Process Flow ) approach, Example ‘COOKING’ INCONSIDERATION SERVE FOOD COMMUNICATION BUY INGREDIENTS PREPARE INGREDIENTS DEADLINES COOK/BAKE FOOD FRUSTRATION PERSONALITY EAT FOOD Option 5: Use any other logical method or sequence, Example ‘BACK ACHES’

  3. 2nd Why / Requirements Examples D4 - Developing the 2nd Why / Requirements …Options The2nd Why defines the Requirements of the 1stWhy / Functions Option 1:Use the Process Sequence Example ‘VALVE MANUFACTURING’ With additional pop-up aid RAW MATERIAL DESIGN/ APPLICATION MACHINING TAPPING ASSEMBLY/ TEST

  4. 2nd Why / Requirements FMEA D4 – 2nd Why = the Requirements Will automaticallybe updated 2nd Why / Requirements • Select which Requirement you would like toFurther Investigate RAW MATERIAL MACHINING TAPPING ASSEMBLY/ TEST DESIGN/ APPLICATION VALVE BODY ADAPTOR CUTTING FLUID SETTINGS 3rd Why 3rd Why 3rd Why 4th Why 4th Why 5th Why

  5. 2nd Why / Requirements C&E (Fishbone) D4 - The 2nd Why will be forwarded to the 2nd Arm/s of the Cause & Effect Diagram RAW MATERIAL DESIGN/ APPLICATION MACHINING TAPPING ASSEMBLY/ TEST

  6. Now start the D4 3rd Why This completes the D4 2nd Why

More Related