Silicon Vertex Tracker Prototype Development for CBM Design with Advanced Tracking Technology

This project aims to design and build a Silicon Vertex Tracker (SVT) prototype for the CBM experiment using MAPS technology. The SVT will feature a compact geometry with two planes placed 5 cm and 10 cm from the target, finely tuned for high track densities and efficient particle identification. Key objectives include achieving a momentum resolution of O(1%), a single track vertex resolution better than 30 μm, and optimizing material budget while ensuring adequate radiation tolerance. The proposal outlines a comprehensive development plan with an operational device expected within two years.

zenia
Download Presentation

Silicon Vertex Tracker Prototype Development for CBM Design with Advanced Tracking Technology

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. A Silicon vertex tracker prototypefor CBM Material for the FP6 Design application

  2. Compact tracking with Si-Sensors in CBM • Geometry of the SVT section • 2 planes at 5 and 10 cm from the target • inner diameter 11 mm only • 109 beam particles per second • Single event track densities up to 50 cm-2 CBM-STS CBM-SVT  100 cm2 SVT in vacuum

  3. Tasks of the tracking system • Momentum measurement for charged tracks with momentum resolution of O(1%) • Material budget • Track matching in high track density environment • Single track vertex resolution better 30 mm • High resolution tracking stations close to the target • Efficient recognition of electron pairs from p0 decays (Conversion, Dalitz) • reconstruction of incomplete tracks • highly efficient matching with PID detectors

  4. Technical challenge • High track density close to the target and at small angles • Mainly affects the pixel sensors • Fast readout • Event pile-up in case of MAPS • Radiation tolerance • Possibly high level of slow neutrons • Low mass design and mechanics • efficient cooling of sensors • detectors need to be moved during the runs

  5. Objective of the Design Proposal • Design and build a Silicon Vertex Tracker of geometry anticipated for the CBM with MAPS technology achievable in 2 years from now. • Study all aspects of such compact high resolution tracking devices with a full size prototype. • Aim at a fully operational device with a self triggered readout. • Relax conditions on radiation hardness and read-out speed. • Work out a detailed design for the complete tracking station of the CBM detector. • Optimize design with respect to: • vertex resolution • track finding efficiency • momentum resolution • material budget

  6. Taken from Mark Winteri, IReS"DESY PRC proposal" Substantial R&D already done

  7. Taken from Woijech Dulinski, LEPSI"Frontier Detectors for Frontier Physics" MAPS for Upgrades & Future Projects

  8. Project structure

  9. Project planning

  10. Cost