NATIONAL HIGHWAYS IN NORTH EASTERN REGION AT A GLANCE

PRESENTATION ON ACTION PLAN OF NORTH EASTERN STATES IN RESPECT OF MINISTRY OF ROAD TRANSPORT AND HIGHWAYS. NATIONAL HIGHWAYS IN NORTH EASTERN REGION AT A GLANCE. North Eastern States comprise Arunachal Pradesh, Assam, Manipur, Meghalaya, Mizoram, Nagaland, Sikkim and Tripura.

zarifa
Download Presentation

NATIONAL HIGHWAYS IN NORTH EASTERN REGION AT A GLANCE

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. PRESENTATIONONACTION PLAN OF NORTH EASTERN STATES IN RESPECT OF MINISTRY OF ROAD TRANSPORT AND HIGHWAYS

  2. NATIONAL HIGHWAYS IN NORTH EASTERN REGION AT A GLANCE • North Eastern States comprise Arunachal Pradesh, Assam, Manipur, Meghalaya, Mizoram, Nagaland, Sikkim and Tripura.

  3. State wise National Highways and length • Arunachal Pradesh : 52, 52A, 153, 229, 52B Ext, 37 Ext. & 315A. [2027 km] • Assam : 31, 31B, 31C, 36, 37, 37A, 38, 39, 44, 51, 52, 52A, 52B, 53, 54, 61, 62, 127B, 151,152, 153, 154 & 315A [2940 km] • Manipur : 39, 53, 102A, 102B, 137, 150 & 155 [1317 km] • Meghalaya : 40, 44, 51, 62 & 127B [1171 km] • Mizoram : 44A, 54, 54A, 54B, 150, 154& 502A [1027 km] • Nagaland : 36, 39, 61, 150 & 155 [494 km] • Sikkim : 31A & 310 [149 km] • Tripura : 44, 44A [400 km]

  4. Comparison with National Average •  TOTAL NH LENGTH - 76818 KM • IN NE STATES - 9525 KM (12.40%) ALL INDIA NE REGION • Length (km) / 1000 sq km 23.4 38.82 •  Length (km) / lakh population 7.5 60.54

  5. Major Road Development Programme in NE Region • NHDP-II (East-West Corridor) • NHDP-III • Special Accelerated Road Development Programme in North East (SARDP-NE) • Phase ‘A’ • Arunachal Pradesh Package of Roads and Highways • Phase ‘B’ (approved for DPR preparation only)

  6. 54B 152 229 150 150 229 54 151 38 155 155 52B 54 36 53 150 31B 52A 52A 37A 31C 52B 154 150 44E 54A 44A 61 61 37 44 37 44 54 39 51 62 39 54 31 40 54 37 31 62 36 37 52 52 52 52 44 37 36 40 39 40 53 52 52B 31A 153 153 Tura Jorging Bishing Major Road Development Programs in North East Region Pango Jido Anini ARUNACHAL PRADESH Singa Migging SarkamPoint CHINA Tato Yingkiong CHINA Bile Roing Taliha Hawai Pangin Along Pasighat Bame ITANAGAR Sadia Jonai Daporijo Mahadevpur Koloriang Dhola ` GANGTOK Pahumara Bogibeel bridge with NHAI Akajan SIKKIM Namchik Vijaynagar Ziro Makum Lumla Tawang Pangsu Pass Dibrugarh Bypass Mangan Nechipu Potin BHUTAN Seppa North Lakhimpur Tashigaon Changlang Hoj Bimlapur Khonsa Yupia Gyalshing NATHULA Kanubari Ranipul Menla GUWAHATI Singtam Jhanji Naya Bazar Panchao Namchi Balipara Rangpo Melli Mon Jaldhaka Merangkong Sivoke Udalguri Golaghat Tezpur Longleng Baska Numaligarh Silliguri Chalsa Rowta Kajiranga Bagdogra Mokokchung ASSAM Silghat Tuensang Wokha WEST BENGAL Baihata Charali Nagaon Morigaon Zunheboto Srirampur Kokrajhar Barpeta NAGALAND Daboka Goalpara Boxirhat Dimapur Jorabat Chaigaon Paikan Phek Dudhnai Boko Diphu Lumding Dhubri Peren Shillong Bypass Barapani KOHIMA MEGHALAYA Athibung ` Zhamai Mawshynrut Maram Jowai Bypass Khelema Nongstoin Tura Ukhrul Haflong Wakhaji Williamnagar MYANMAR Mawthabah Shankshak Tamenglong Baghmara Yaingpokpi Dalu MANIPUR Silchar Badarpur SHILLONG Jiribam Silchar Bypass Km 10 – 18 of NH 154 Palel BANGLADESH Kukital IMPHAL Tengnoupal Km 95 – 118 of NH 54 Kailasahar Moreh Chandel LEGEND :- Kumarghat 1. Arunachal Package 2. SARDP NE, Phase- A 3. SARDP NE, Phase- B 4. East West Corridor 5. NHDP III 5. NH/Roads (In-Progress under SARDP-NE ) 6. Completed stretches) NH Network with PWD with BRO NH yet to be Entrusted Manu Seling AIZAWL AGARTALA Champai MIZORAM TRIPURA AIZAWL Theriat Lunglei Sabroom Demagiri Saiha Road serving Kaladan Project Tuipang

  7. NHAI

  8. Projects Taken up by NHAI in NE States ProgrammeLength(km)Cost (Rs. Crore) NHDP (Phase-II) 670 6000 East West Corridor NHDP (Phase-III) 110 400 on BOT(Toll) Basis (SARDP-NE) 394 3945 On BOT (Annuity) basis Total 1182 Km 10345

  9. BRIEF ON EAST WEST CORRIDOR PROJECTS IN ASSAM • Total length in Assam = 670 km • Starts from Silchar (km 306.25 of NH-54) and ends at Assam/West Bengal Border (km 0 of NH-31C) Srirampur • Passes through Silchar, Maibong, Lumding, Daboka, Nagaon, Sonapur, Guwahati, Nalbari and Bijni • Four laning completed = 18 km (Guwahati Bypass) • To be awarded after completion of • 2 laning by State PWD (progress 70%) = 31 km • Under Implementation = 621 km

  10. Status of Four Laning Works on EW corridor

  11. Continued The stretch of 31 km from Balachera to Herangajo is being widened from single lane to two lanes by the State PWD. Clearance for Borail Wild Life and Borail Reserve forest is awaited. Four laning would be done after completion of two lane by PWD, Assam. Most of the contracts were awarded in November/December 2005. All the contractors had mobilized to site and works are in progress except in 5 contract packages in NC Hills district where the work has been stopped by the previous contractors since April’2008 due to non-handing over of encumbrance free site and law & order situation. All the five civil packages of NC Hills district had been foreclosed and re-awarded. Entire East West Corridor is targeted for completion by March, 2013 except the five packages of NC Hills district re-awarded for the balance work targeted for completion March, 2014.

  12. Status of NHDP (III) Projects in Meghalaya

  13. Status of SARDP – NE Projects on BOT (Annuity)

  14. SPECIAL ACCELERATED ROAD DEVELOPMENT PROGRAMME IN NORTH EAST (SARDP-NE)

  15. Objectives of SARDP-NE • Upgrade National Highways connecting State Capitals to 2/ 4 lane; • To provide connectivity of all 88 District Headquarter towns of NER by at least 2-lane road; • Provide road connectivity to backward and remote areas of NE region to boost socio - economic development; • Improve roads of strategic importance in border area; • Improve connectivity to neighboring countries

  16. SARDP-NE at a Glance

  17. State-wise road length distribution under SARDP-NE SR: State Road; GS: General Staff roads & Strtg: Strategic roads

  18. Progress of SARDP-NE * Out of 886 km NHAI is implementing 39 4 km on BOT(Annuity), MoRT&H 140 km on BOT(Annuity) & 347km on EPC

  19. Performance of SARDP-NE

  20. QuarterlyTargets for 2012-13 for SARDP-NE including Arunachal Pradesh Package.

  21. Statewise Targets for sanction during 2012-13 under SARDP-NE including Arunachal Pradesh Package.

  22. 229 52B 52B 153 52B 52 229 229 52 37 Ext Yingkiong Roads covered for improvement inArunachal Pradesh under SARDP-NE Aalong Aalong GORGING Anini Daporijo BISHING Roing JIDO PONGO SINGA Tezu Koloriang MIGGING SAKRAM POINT LUNGTE TATO BILE MARIYUNG Koronu BOMJIR Paya PANGIN PANGIN Seppa TAHILA Bomdila Ziro Hawai CHOWKHAM BAME PAKA SADIA Tawang JONAI DHOLA MAHADEVPUR RUPAI NH-52B TINSUKIA NH-52 NAMCHIK JAIRAMPUR LUMLA Lalpul DIBRUGARH PANGSU PASS AKAJAN ZORAM NORTH LAKHIMPUR Yupia Potin BIMLAPUR TASHIGAONG Hoj SIBSAGAR BANDER DEWA KANUBARI ITANAGAR Changlang NECHIPU Being improved to 2 lane by BRO under China Study Group(CSG) HOLONGI LEGEND :- Pasighat BALIPARA GOHPUR NH-37A • Roads under Arunachal Package • Road stretches proposed on Annuity basis • B. Roads under Phase ‘A’ • C. Roads under Phase ‘B’ • Work in going on in stretch • Other National Highways • East West Corridor • DISTRICT HEADQUARTER TOWN To Srirampur NUMALIGARH Khonsa NH-52 SILGHAT NH-37 Baihata Charali NAGAON TO SILCHAR ROUTE OF 4 LANE CONNECTIVITY OF ITANAGAR WITH EAST WEST CORRIDOR AT NAGAON GUWAHATI

  23. Details of sanctions in the North Eastern States entrusted to State PWDs under NH(O) in the last five years

  24. Allotment and expenditure in the North Eastern States entrusted to State PWDs under NH(O) in the last five years (in Rs. Crore)

  25. Targets for 2012-13 the North Eastern States entrusted to State PWDs under NH(O)

  26. ISSUES REQUIRING SUPPORT OF STATE GOVT. • Expedite completion of Land Acquisition and utility shifting prior to award of the project so that land is free from encumbrance and will in turn expedite completion of the project. • To expedite Environment and Forest clearance wherever necessary. • To enhance the capacity of the State PWDs at the Division level for effective implementation and monitoring of the projects.

  27. THANK YOU

  28. Length of roads included under Phase ‘A’ and Arunachal Package of SARDP-NE. * Out of 95km length of NH-31A, 80km is included under Phase A of SARDP-NE, 50km is in West Bengal and 30km is In Sikkim