1 / 13

SES 405 Power Subsystem Technical Review

SES 405 Power Subsystem Technical Review. By: Josh Lincoln Nick Knaus Rushi Patel. Power Requirements. Power Requirements Continued. Mission Constraints and Assumptions . Budget Discovery Class Mission - $425 million Mass Launch Vehicle - Atlas V ($90 million)

zareh
Download Presentation

SES 405 Power Subsystem Technical Review

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. SES 405Power Subsystem Technical Review By: Josh Lincoln Nick Knaus Rushi Patel

  2. Power Requirements

  3. Power Requirements Continued

  4. Mission Constraints and Assumptions • Budget • Discovery Class Mission - $425 million • Mass • Launch Vehicle - Atlas V ($90 million) • Payload mass to GEO ~ 4,750 kg • Environment • Temperature: 70 – 390 Kelvin • Gravity: 1.622 m/s^2 • Radiation • Vacuum • Time • 12 Lunar days (~ 12 Earth Months) • Assumptions • ASRG is technologically ready and will perform under lunar conditions • The ASRG’s radiation will not harm any other subsystems • The energy required for the rover to complete its mission is 280Wh for 12 lunar days • Operational day and night

  5. Power system comparisonsRTG vs. Solar • Note: • GPHS RTG outputs 4400 Wt compared to 500 Wt from the ASRG • RTG allows operations at night, and thermal power • Mass for solar includes the mass of batteries, assuming 100Wh/kg for Li-ion batteries, with a power budget of 560W (half in use, half charging batteries).

  6. Choosing a Power System Goal: Provide “enough” power to lunar rover for 12 lunar days A RTG based power subsystem was chosen to be the best based of the AHP trade study method

  7. Concept of Operations

  8. Power System – Allocation of system power(time and subsystem)

  9. Power system Pros and Cons • RTG • Pros: Continuous power, not reliant on sun, thermal power, small volume • Cons: Requires Nuclear Material, Cost, Weight, radiation • Solar • Pros: Cost, weight, solar shielding, no radiation • Cons: Discontinuous power, volume, reliant on the sun, variable power generation

  10. Previous Systems • Lunokhod 1 • Mass: 756 kg (rover) • Power/System: Solar cell fueled batteries • Lunokhod 2 • Mass: 840 kg (rover) • Power/System: Solar panels / batteries • Spirit • Mass: 185 kg (rover) • Power/System: Solar panels (Photovoltaic) / Rechargeable litium ion batteries • Opportunity • Mass: 185 kg (rover) • Power/System: Solar panels (Photovoltaic) / Rechargeable litium ion batteries • Curiosity • Mass: 900 kg (rover) • Power/ System: RTG

  11. Power System Summary • System: RTG • 2 ASRGs • Power: 280Weh / 500 Wt • Voltage: 22-34 VDC (Nominal Range) • Mass: 40 kg, with 1.6kg of Pu-238 • Cost: $54 million combined • Dimensions: 0.3m in diameter, 0.75m in height each • Thermally manage rover temperature • Located on either side of rover, to balance mass • Thermal dissipation, possibly need to isolate due to emitted radiation • Powers all subsystems • Different power modes (Cruise, Roam, Focused Investigation)

  12. Power Systems Summary cont. • Maximum power: 280W • Batteries for energy storage and discharge (high voltage instruments) • Self regulating computer system (separate from SMARTS) • Communicate with SMARTS • Integrated with SMARTS

  13. Detailed ASRG specifications

More Related