EVACUATION STRATEGIES FOR KARWAR ULTRA MEGA THERMAL POWER PROJECT. SOUTHERN REGIONAL LOAD DESPATCH CENTRE. ULTRA MEGA THERMAL POWER PROJECTS. GUJARAT MUNDRA PORT MADHYA PRADESH ASSAN CHATTISGARH AKALTARA KARNATAKA KARWAR MAHARASHTRA KONKAN COAST 4000 MW EACH

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about 'EVACUATION STRATEGIES FOR KARWAR ULTRA MEGA THERMAL POWER PROJECT' - zagiri


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
Evacuation strategies for karwar ultra mega thermal power project

EVACUATION STRATEGIES FOR KARWAR ULTRA MEGA THERMAL POWER PROJECT

SOUTHERN REGIONAL LOAD DESPATCH CENTRE


Ultra mega thermal power projects
ULTRA MEGA THERMAL POWER PROJECTS PROJECT

  • GUJARAT MUNDRA PORT

  • MADHYA PRADESH ASSAN

  • CHATTISGARH AKALTARA

  • KARNATAKA KARWAR

  • MAHARASHTRA KONKAN COAST

  • 4000 MW EACH

  • RS 15000 CRORES INVESTMENT FOR EACH PLANT


68 PROJECT

72

76

88

92

96

80

84

INDIA

GEO POLITICAL

J&K

POWER REGIONS

HP

PUNJAB

HARIANA

NER

N

BHUTAN

NEPAL

SKM

DELHI

NG

NE

ASSAM

RAJASTHAN

UP

ME

BIHAR

MNP

B’

DESH-

E

TRP

MIZ

MP

MYANMAR

JKND

WB

GUJARAT

W

L

CTGR

ORISSA

MAHARASHTRA

DIU

DAMAN

S

GOA

AP

PONDICHERY

KARNATAKA

A&N

TAMIL

NADU

LAKSHADWEEP

SRI

LANKA

PROPOSED 5 ULTRA MEGA POWER PROJECTS

SASA

MUDRAKOT

TADIRI


KARWAR ULTRA MEGA THERMAL POWER PROJECT PROJECT

EVACUATION CHALLENGES



ENVIRONMENTAL ISSUES PROJECT

KARWAR IS IN COASTAL SURROUNDED BY DENSE FORESTS

  • FOREST CLEARANCE APPROVALS – LONGER LEAD TIMES

  • NECESSITATES QUICK FINANCIAL TIE-UPS AND STATUTORY APPROVALS

  • MAY REQUIRE USE OF MULTI CIRCUIT TOWERS TO CONSERVE ROW


TECHNICAL ISSUES PROJECT

  • LOAD-LOAD GROWTH IN NORTH COASTAL KARNATAKA NOT COMMENSURATE WITH THE GENERATION ADDITION.

  • LOAD CENTRES ARE TOWARDS SOUTH – BANGALORE-MYSORE-MANGALORE-HASSAN.

  • BANGALORE LOADS GROWING AT A PHENOMENAL RATE (15%).


Evacuation strategies core issues
EVACUATION STRATEGIES PROJECTCORE ISSUES

  • EVACUATION FOR A 4000 MW STATION NEEDS TO BE ROBUST

  • LOAD CENTRES ARE FAR AWAY NECESSIATING A NEED FOR LONG LINES

  • HOLISTIC PLANNING:-SHOULD BLEND IN WITH THE EXISTING SCHEME FOR ECONOMY AND BETTER CORRIDOR UTILIZATION

  • VOLTAGE LEVELS:-

    • 765 KV LINES

    • 400 KV D/C QUAD MOOSE

    • 400 KV D/C


Suggested evacuation plan for karwar ultra mpp 4000mw option 1
Suggested Evacuation Plan for KARWAR ULTRA MPP (4000MW): OPTION 1

AC Link or HVDC B2B at RAICHUR or PARLE

TO PARLI (WR)

MAPUSA (GOA) HVDC [email protected] MAPUSA

NARENDRA

HYD

MUNIRABAD

RAICHUR

NSR

175 Kms

KAIGA

SSLM

KURNOOL

TORANGALLU

KARWAR ULTRA MPP (4000 MW)

GUTTUR

GOOTY

ANANTPUR (AP)

287 Kms

100 Kms

D/C QUAD LINES

HIRIYUR

Lines considered in CEA NEP 2012

TALAGUPPA

119 Kms

126 Kms

Lines in service by end Dec 06

DODBALLAPUR

Suggested KARWAR Evacuation and NAGARJUNA Mangalore Project Evaluation

HASSAN

NELAMANGALA

113 Kms

NAGARJUNA

1000 MW

HOODY

SMNHL

TO KOLAR

MYSORE

Fixed Series Compensation

BIDADI

TO KOHZIKODE (KERALA)


Suggested evacuation lines option 1
Suggested Evacuation Lines OPTION 1OPTION 1

  • KARWAR-MAPUSA ( HVDC B2B LINK)

  • KARWAR-TALAGUPPA (400 KV DOUBLE CKT.)

  • KARWAR-HIRIYUR (400 KV DOUBLE CKT.)

  • HIRIYUR-HASSAN (400 KV DOUBLE CKT.)

  • NELAMANGA-TALAGUPPA BOTH 400 KV CKTS. LILO AT HASSAN

  • HIRIYUR-DODDABALLAPUR 400 KV S/C

  • HIRIYUR-ANATHPUR-DODDABALLAPUR 400 KV S/C

  • NAGARJUNA – HASSAN (400 KV DOUBLE CKT.)

  • HASSAN-MYSORE (400 KV DOUBLE CKT.)

  • MYSORE-NELAMANGALA ONE CKT. LILO AT BIDADI.


Option 1 highlights
OPTION 1: HIGHLIGHTS OPTION 1

  • THE EXISTING CORRIDOR OF TALAGUPPA NELAMANGALA LINE IS USED FOR ENHANCING EVACUATION.

  • BY PROVIDING HVDC BACK-TO-BACK CONNECTION WITH GOA, FLEXIBLE AND GUARANTEED EXPORT TO GOA (WR) CAN BE ACHIEVED.

  • CREATION OF A NEW STATION (DODDABALLAPUR) NEAR BANGALORE HAS BEEN ENVISAGED FOR ADDED SECURITY AND RELIABILITY OF SUPPLY TO AND AROUND BANGALORE.

  • TOUCH POINT HAS BEEN PROVIDED AT ANANTHPUR IN AP – GROWING LOAD CENTRE.

  • MAY REQUIRE COMPENSATION OR STRENGTHENING OF TALGUPPA-HASSAN SECTIONS.

  • N-1 CRITERIA IS BARELY MET.


Suggested evacuation plan for karwar ultra mpp 4000mw option 2

Lines considered in CEA NEP 2012 OPTION 1

Lines in service by end Dec 06

Suggested KARWAR Evacuation and NAGARJUNA Mangalore Project Evaluation

Fixed Series Compensation

Suggested Evacuation Plan for KARWAR ULTRA MPP (4000MW): OPTION 2

AC Link or HVDC B2B at RAICHUR or PARLE

NARENDRA

TO PARLI (WR)

BB WADI

KOLHAPUR (WR) HVDC [email protected] NARENDRA

HYD

RAICHUR

NSR

175 Kms

280 Kms

KAIGA

SSLM

MUNIRABAD

KURNOOL

KARWAR ULTRA MPP (4000 MW)

TORANGALLU

GUTTUR

GOOTY

ANANTPUR (AP)

287 Kms

100 Kms

D/C QUAD LINES

HIRIYUR

TALAGUPPA

119 Kms

126 Kms

DODBALLAPUR

HASSAN

NELAMANGALA

NAGARJUNA

1000 MW

113 Kms

HOODY

MYSORE

BIDADI

SMNHL

TO KOLAR

TO KOHZIKODE (KERALA)


Option 2 highlights
OPTION -2 HIGHLIGHTS OPTION 1

  • NARENDRA-KOLHAPUR BACK-TO-BACK LINK INSTEAD OF KARWAR-MAPUSA.

  • ADDITIONAL D/C LINE TO BASAVANA BAGEWADI TO SERVE N.KARNATAKA AND ALSO CONNECTS TO TWO HVDC B2B EXPORT PATHS

    • NARENDRA- KOLHAPUR

    • RAICHUR-PARLE

  • ADEQUATE EVACUATION CAPACITY.


Suggested evacuation plan for karwar ultra mpp 4000mw option 3

Lines considered in CEA NEP 2012 OPTION 1

Lines in service by end Dec 06

Suggested KARWAR Evacuation and NAGARJUNA Mangalore Project Evaluation

Fixed Series Compensation

Suggested Evacuation Plan for KARWAR ULTRA MPP (4000MW): OPTION 3

AC Link or HVDC B2B at RAICHUR or PARLE

TO PARLI (WR)

NARENDRA

BB WADI

KOLHAPUR (WR) HVDC [email protected] NARENDRA

HYD

RAICHUR

NSR

175 Kms

280 Kms

KAIGA

MUNIRABAD

SSLM

KARWAR ULTRA MPP (4000 MW)

KURNOOL

TORANGALLU

GUTTUR

GOOTY

ANANTPUR (AP)

260 Kms

287 Kms

100 Kms

D/C QUAD LINES

HIRIYUR

TALAGUPPA

Lines considered in CEA NEP 2012

SERIES CAPACITOR

126 Kms

Lines in service by end Dec 06

160 Kms

175 Kms

MANGALORE POOLING POINT

DODBALLAPUR

Suggested KARWAR Evacuation and NAGARJUNA Mangalore Project Evaluation

HASSAN

NELAMANGALA

360 Kms

256 Kms

NAGARJUNA

1000 MW

113 Kms

HOODY

SMNHL

TO KOLAR

MYSORE

Fixed Series Compensation

BIDADI

TO KOHZIKODE (KERALA)


Option 3 highlights
OPTION -3 HIGHLIGHTS OPTION 1

  • ADDITIONAL LINE ALONG THE COAST TOWARDS MANGALORE POOLING POINT FOR NAGARJUNA AND KARWAR POWER

    • SERIES CAPACITOR ON THIS LINE MAY BE REQUIRED DUE TO ITS LARGER IMPEDANCE

    • TALGUPPA LINE CAN BE AVOIDED IF NEED BE

  • ADDITIONAL D/C LINE TO BASAVANA BAGEWADI TO SERVE N.KARNATAKA AND ALSO CONNECTS TO TWO HVDC B2B EXPORT PATHS

    • NARENDRA- KOLHAPUR

    • RAICHUR-PARLE

  • MANGALORE-POOLING POINT TO MYSORE ALSO CAN BE CONSIDERED

    • EVACUATION IS SAME AS THE COGENTRIX PROJECT WHICH WAS SHELVED

  • MAXIMUM RELIABILITY WITH MINIMUM FOREST CLEARANCE REQUIREMENT

  • ANOTHER STATION AT HAVERI CAN BE CONSIDERED FOR EVACUATION INSTEAD OF HIRIYUR

    • LILO OF NARENDRA GUTTUR AT HAVERI

    • KARWAR - HAVERI – HIRIYUR D/C QUAD

    • THIS WOULD REDUCE THE LINE LENGTHS

    • THIS WOULD FURTHER REDUCE FOREST CLEARANCE


ad