TE EPC. Booster and PS LIU workunits. EPC Project Meeting 06-09-2011 Serge Pittet. The LIU Project. TE EPC.

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about 'Booster and PS LIU workunits' - zada


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
booster and ps liu workunits

TE

EPC

Booster and PS LIU workunits

EPC Project Meeting 06-09-2011

Serge Pittet

the liu project
The LIU Project

TE

EPC

“The LHC Injectors Upgrade should plan for delivering reliably to the LHC the beams required for reaching the goals of the HL-LHC. This includes LINAC4, the PS booster, the PS, the SPS, as well as the heavy ion chain.”

D. Nisbet

D. Nisbet (inj.)

S. Pittet

S.Pittet

TE-EPC - Serge Pittet

liu project status
LIU Project status

TE

EPC

  • RCS option studied and rejected.
  • LIU project approved in the 24th of august LMC.
  • Official date for project start on 1st of September 2011.
  • TDR to be completed by the end of 2011.
  • Startup of upgraded machines at the end of LS2 (2017?).
  • Some budget codes already funded.
  • WBS and WUs will soon be transferred in APT.

TE-EPC - Serge Pittet

provisional planning
Provisional planning

TE

EPC

TE-EPC - Serge Pittet

manpower request overview
Manpower request overview

TE

EPC

TE-EPC - Serge Pittet

liu psb 5 2 booster mps
LIU-PSB 5.2 - Booster MPS

TE

EPC

  • Civil engineering included. To be done in LS1 as far as possible.

TE-EPC - Serge Pittet

pops based baseline
POPS based Baseline

TE

EPC

64 BHZ

Rings 1&4

GND

Benefits

  • Overall voltage available increases and would allow a reduction of the RMS current using a faster ramping.
  • The capacitor bank totally absorbs the peak power on the 18kV network. Meyrin SVC would then become optional.
  • Spare sharing between MPS A and B and eventually with POPS.
  • Only a few new cables needed between the reference magnet (BCER) and the MPS.
  • New B-field regulation to minimize eddy currents and saturation effects impact at higher current and acceleration rate.

Drawbacks

  • Cost estimation 14MCHF using POPS module.

128 QFO

Rings

1,2,3&4

MPS A

2500V

5500A

QFO

600V

450A

Reference

magnet

Ring 1&4

Ring 1 B-filed

measurement

Reference

magnet

Ring 2&3

Ring 2 B-filed

measurement

64 QDE

Rings

1,2,3&4

MPS B

2500V

5500A

QDE

600V

450A

64 BHZ

Rings 2&3

GND

TE-EPC - Serge Pittet

layout of mps new building
Layout of MPS new building

TE

EPC

  • 420m2 required, only 190m2 available in bdg. 271 ground floor.
  • Only 200kg/m2 allowed in bdg. 271 first floor.
  • No space left in bdg. 361.

With this new building:

  • We can install and commission during Booster operation.
  • We have a backup power supply during the first years.
  • Easy connection to existing cables and cooling services.

New MPSB

(2 GeV)

(26m x 16m)

TT6

TE-EPC - Serge Pittet

liu psb 5 2 alg1 2
LIU-PSB 5.2 – ALG1&2

TE

EPC

  • The linear stage can handle the new rated current.
  • The capacitor bank size needs to be increased.

TE-EPC - Serge Pittet

liu psb 5 2 mididiscaps
LIU-PSB 5.2 - Mididiscaps

TE

EPC

  • Design and production from Linac 4 project.

TE-EPC - Serge Pittet

liu psb 5 2 beam transfer
LIU-PSB 5.2 – Beam Transfer

TE

EPC

  • Optimization still need to be done: pulsing converters and keep existing magnets, BT.BHZ10 magnet design, 2GeV quadrupoles optic, reuse of some converters or spares

TE-EPC - Serge Pittet

liu ps 5 cbe
LIU-PS 5 – CBE

TE

EPC

  • Specification under study with OP.
  • ACAPULCO power design with FGC3 and RegFGC3.

TE-EPC - Serge Pittet

liu ps 5 pi smh42
LIU-PS 5 – PI.SMH42

TE

EPC

  • 2 aimants en série
  • R bobinage:

2·0.08mOhms

≈ 0.2 mOhms

  • L aimant:

2·0.9uH ≈ 2uH

  • Inom: 31kA
  • Forme: Demi sinus+ 3ème harmonique + filtre actif
  • Largeur pulse demi sinus: 3ms

TE-EPC - Serge Pittet

liu ps 5 pi bsm42
LIU-PS 5 – PI.BSM42

TE

EPC

  • R bobinage: 0.5 mOhms
  • L aimant: 1uH
  • Inom: 28kA
  • Forme: Demi sinus

+ 3ème harmonique

+ filtre actif

  • Largeur pulse demi sinus:

0.8ms

  • Temps de descente du courant: 0.4ms
  • Pas de faisceau sur la portion de montée en courant.
  • La descente en courant des 4 bumpers doit être aussi proche que possible.

TE-EPC - Serge Pittet

liu ps 5 pi bsm40 43 44
LIU-PS 5 – PI.BSM40, 43 & 44

TE

EPC

  • R bobinage:

0.41 mOhms (20 tours)

  • L aimant: 0.5mH
  • Inom: 1.1kA
  • Largeur pulse demi sinus:

0.8ms

  • Temps de descente

du courant: 0.4ms

  • Le nombre de tour peut encore être modifié (Dominique.Bodart@cern.ch)
  • Pas de faisceau sur la portion de montée en courant.
  • La descente en courant des 4 bumpers doit être aussi proche que possible.

TE-EPC - Serge Pittet

related consolidation
Related consolidation

TE

EPC

  • Some consolidation items which are essential for the LIU project have been pushed/advanced.
  • They have not been transferred and stay in S.Baird project.

TE-EPC - Serge Pittet

organization
Organization

TE

EPC

  • Bi-weekly LIU PSB project meetings followed by linkman.
  • Bi-weekly LIU PS project meetings followed by linkman.
  • EPC LIU project meetings in January, May and September with a shot presentation by each WU holder.
  • WU specific meetings when needed.

TE-EPC - Serge Pittet

documentation
Documentation

TE

EPC

  • Detailed information still available on TE-EPC-LPC website:

http://te-epc-lpc.web.cern.ch/te-epc-lpc/general.stm

TE-EPC - Serge Pittet

liu psb work units
LIU-PSB Work Units

TE

EPC

TE-EPC - Serge Pittet

liu ps work units
LIU-PS Work Units

TE

EPC

TE-EPC - Serge Pittet