This document summarizes the collection of data from various test beam periods spanning from June to October 2012. Notable periods include June's performance analysis of MM in a magnetic field, July's assessment of uTPC and VMM1, September's evaluation of uTPC, VMM1, and a large chamber L1, and October's examination of uTPC, VMM1, and the triggering scheme in L1. A systematic analysis of this data is essential for presentations at the Vienna conference in February 2013, the January review meeting, and the TDR in May 2013.
E N D
We’ve/’ll collected data from different testbeam periods • June’12 (Performace of MM in a B magnetic field) • July’12 (uTPC, VMM1) • Sept’12 (uTPC, VMM1, large chamber L1) • Oct’12 (uTPC, VMM1, Trigger scheme, L1) • Need to analyze the data in a systematic way for: • Vienna conference, Feb 2013 • January Review meeting • TDR, May 2013