1 / 5

Radar Operations during AMMA SOP Alain Protat

Radar Operations during AMMA SOP Alain Protat. Benin mesosite : Scanning Polarimetric Doppler X-band radar ( X-Port ) + Scanning Polarimetric Doppler C-band radar ( Ronsard ) + Bistatic Receiver + Vertical UHF / VHF radar + Vertical Micro Rain Radar.

yaholo
Download Presentation

Radar Operations during AMMA SOP Alain Protat

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Radar Operations during AMMA SOP Alain Protat • Benin mesosite : Scanning Polarimetric Doppler X-band radar (X-Port) + Scanning Polarimetric Doppler C-band radar (Ronsard) + Bistatic Receiver + Vertical UHF / VHF radar + Vertical Micro Rain Radar. • Niamey mesosite : Scanning Doppler C-band radar (MIT) + AMF vertically-pointing 95 GHz Doppler Cloud Radar • UHF network : Bamako, Ouaga, Djougou Science Objectives : precipitation estimates, water budgets, MCS dynamics and microphysics, interactions between AEW and MCSs, MCSs feedbacks on monsoon onset and dynamics Additional interest : provide guidance to aircraft operations and decision-making

  2. Benin Mesosite

  3. Ronsard C-band radar strategy at the Benin mesosite “Surveillance” mode (200 km range, 200 m range resolution) : 1 PPI with2 elevations (1°, 4°) as long as there is no precip 1 PPI with 2 elevations (1°, 4°) + 2 RHIs (from 0 to 12° elevation every 0.45°) in relevant direction when precip in range 100-200 km Real-time products :1 QL PPI 1° + 1 QL RHI every 15 minutes, MCS propagation speed Optional (for now) : mean wind profiles every 15 minutes (precip) “Survival” mode : Vertically-pointing, power on, around 15 minutes Gust front (around 15 minutes before the passage of convective line at the radar) “Precipitation” mode (Ronsard 100 km range, 100 m range resolution): Total duration of sequence : 13 minbut repetition of the low elevation angle every 6,5 min minutes for precip estimates at nearly the same time as X-Port. Inside a sequence : VAD1 (11 elevs) (5,5 min) + vertical (spectrum) (0,5 min) + RHI 1 (0,5 min) VAD2 (11 elevs, interleaved) (5’30”) + vertical (spectrum) (0,5 min) + RHI 2 (0,5 min) Real-time products :1 QL PPI 1° + 1 QL RHI every 15 minutes, MCS propagation speed Optional (for now) : near real-time winds from Ronsard + bistatic receiver.

  4. X-Port radar strategy at the Benin mesosite “Precipitation” mode(60 km range) Total duration of sequence : 7 min Inside a sequence : VAD (10 elevs) (6 min) + vertical (spectrum) (50 s) + RHIWest (10 s) Real-time products :? Bistatic Receiver strategy at the Benin mesosite Determined by Ronsard sampling Real-time products : Can provide horizontal wind vectors in near real-time Interesting for flight guidance ? Could be sent to Ronsard and then to Niamey AOC. Recommendation from TT8 ?

  5. Coordinated radar observations at the Benin mesosite Surveillance mode using Ronsard 200 km range Precipitation mode (Ronsard 100 km range + X-Port 60 km range): Start sequences at 00, 15, 30, and 45 minutes of an hour (15 minutes cycle) Coordinate each start of a VAD mode (times 00 min and 07 min of a cycle) We could also : Adapt RHI directions according to flight tracks if needed as operators will be on site, communicating with Niamey (hopefully) What remains to be done (action AP + Benin AOC) : Test correlation method for propagation speed estimate from Ronsard PPIs Compute near real-time horizontal winds ? Install communication devices (Djougou, Kopargo, Kolokonde, Nangatchori) Finalize rotations of personnel (almost done) Set up a coordination of the Benin mesosite for SOP to report to Niamey (scientific coordinator + scientific secretary ?)

More Related