1 / 28

11-6-14(B) Day 27 of 45

11-6-14(B) Day 27 of 45. Introduction to Manufacturing Processes.ppt Material Testing.ppt Take notes in engineering notebooks FINISH Activity 1.3.3-Thermodynamics Complete in engineering notebook Show all work: formula, substitutions, answer w/ units

walker-clay
Download Presentation

11-6-14(B) Day 27 of 45

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. 11-6-14(B) Day 27 of 45 • Introduction to Manufacturing Processes.ppt • Material Testing.ppt • Take notes in engineering notebooks • FINISH Activity 1.3.3-Thermodynamics • Complete in engineering notebook • Show all work: formula, substitutions, answer w/ units • Activity 2.3.1- Stress/Strain Calculations • Complete in your engineering notebooks • Show all work: formula, substitutions, answer with units • Answer conclusion questions: copy question/short answer OR write complete sentence that re-states the questions

  2. 10-30-14(B) Day 26 of 45 • Finish Introduction to Thermodynamics.ppt • Don’t worry about taking notes, as your notes for this topic will be complete when you finish Activity 1.3.3 • Introduction to Materials.ppt • Take brief notes in engineering notebooks • FINISH Activity 1.3.3-Thermodynamics • Complete in engineering notebook • Show all work: formula, substitutions, answer w/ units • Leave engineering notebooks @ end of class so I can check/grade Activities 3.2.4 & 4.2.4

  3. 10-28-14(B) Day 25 of 45 • Introduction to Thermodynamics.ppt • Take notes in engineering notebooks which begins Activity 1.3.3-Thermodynamics thru #17 • Begin work on Activity 1.3.3-Thermodynamics • Take notes from activity along with my powerpoint – thru #17 • You do not have to finish this today; will finish next class • Unit 4.2: • Ballistic Device Project • FINISH the excel spreadsheet • Record in your engineering notebooks • Fill into the excel file I have created for you (must be in decimal feet for units) • Save it and upload to the unit 4 page of your Weebly (as both a document and a file) along with a picture of your device and a description of the project • Fill out partner rating rubric (for Self & A(partner), leave “B” blank-except for the group of 3 people) • Save it & upload to the unit 4 page of your Weebly as both a document and a file • Publish your Weebly • FINAL TESTING - “draw” your distance. • You have 5 minutes after that to set-up and practice shooting the bucket • The bucket should be centered on your distance • After 5 minutes you must shoot into the bucket for your grade • HOMEWORK: If you do not have Activities 3.2.4 & 4.2.4 complete and in your engineering notebook finish for homework, you will leave notebooks next class so I can check these!

  4. 10-24-14(B) Day 24 of 45 • Unit 4.2: • Ballistic Device Project • FINISH fabrication of your device in the lab • Safety glasses on at all times in the lab today • Trial test the device, collect data for the excel spreadsheet • Fill out the excel spreadsheet • Record in your engineering notebooks • Fill into the excel file I have created for you (must be in decimal feet for units) • Save it and upload to the unit 4 page of your Weebly (as both a document and a file) along with a picture of your device and a description of the project • Fill out partner rating rubric (for Self & A(partner), leave “B” blank-except for the group of 3 people) • Save it & upload to the unit 4 page of your Weebly as both a document and a file • Publish your Weebly • Practice shooting into the bucket • If ready for final testing notify instructor and “draw” your distance. • You have 5 minutes after that to set-up and practice shooting the bucket • The bucket should be centered on your distance • After 5 minutes you must shoot into the bucket for your grade

  5. 10-22-14(B) Day 23 of 45 Someone left last class with one of my TI-83 Calculators; please return to me ASAP! • Unit 4.2: • Show “stock” designs of ballistic devices as examples • FINISH Activity 4.2.4-Ballistic Practice Problems • Complete in engineering notebooks • Show all work: Formula, substitutions, answer with units • Ballistic Device Project • Form teams of 2, 1 group of 3 needed • Brainstorm & sketch with your partner • Must created an annotated sketch in engineering notebook along with a description of how it will work • Get approval from Instructor • Once approved, begin fabrication of your device in the lab • Safety glasses on at all times in the lab today

  6. 10-20-14(B) Day 22 of 45 • Unit 4.2: • Projectile Motion.ppt • Take notes in engineering notebook • Look at Ballistic Device Project • Design Brief, Rubric, Team Evaluation, Range with Excel • Activity 4.2.4-Ballistic Practice Problems • Complete in engineering notebooks • Show all work: Formula, substitutions, answer with units • FINISH Activity 3.2.4-Fluid Power Practice Problems • Complete the activity in your engineering notebook; show all work: Formula, Substitutions, Answer with units • Create annotated sketches when prompted • Leave engineering notebooks @ end of class so I can grade Activities 1.2.4, 1.2.5, & 1.3.1

  7. 10-16-14(B) Day 21 of 45 • Unit 3.2: • Introduction to Fluid Power.ppt • You took notes on this last class, quickly run through this • Pneumatics.ppt • Take brief notes in engineering notebook • Hydraulics.ppt • Take brief notes in engineering notebook • Activity 3.2.4-Fluid Power Practice Problems • Complete the activity in your engineering notebook; show all work: Formula, Substitutions, Answer with units • Create annotated sketches when prompted

  8. 10-14-14(B) Day 20 of 45 • Charge the hydrogen Fuel Cell following instructions! • This can take as long as 45min-1hour • When fuel cell charged, put on the VEX Solar Fuel Cell Car • Finish Activity 1.3.1-Solar Hydrogen System-VEX • Complete the activity and answer all conclusion questions • Copy question/short answer OR write complete sentence that re-states the question • Every team member is responsible for having all questions/data recorded in their own engineering notebook! • Disassemble your car and put all pieces back in their CORRECT bins • Introduction to Fluid Power.ppt (Unit 3.2) • Take notes on your own in engineering notebooks • Leave engineering notebooks at the end of class so I can grade them for the 9wks

  9. 10-10-14(B) Day 19 of 45 • Unit 1.3: • Begin Building VEX Solar Fuel Cell Car • Build the vehicle following the build instructions found on my website (it’s a .ppt file) under Unit 1.3 • This is a group activity • Activity 1.3.1-Solar Hydrogen System-VEX • Complete the activity through step 9 • Next class we will charge the fuel cell to finish the activity • Work on Weebly and/or engineering notebook – I must grade these: • I will be grading your weeblies over the weekend-Make sure it is PUBLISHED, engineering notebooks next week

  10. 10-8-14(B) Day 18 of 45 Recruiting Video being filmed this morning; going to need a couple of you to “stage” work on projects! • Unit 1.3: • Hydrogen Fuel Cells.ppt • Take notes in engineering notebooks • Unit 1.2: • FINISH Activity 1.2.3-Electrical Circuits-Simulation • Draw schematics in engineering notebooks • Show all work when performing calculations • Formula, substitutions, answers with units • Answer conclusion questions • Copy question/short answer OR write a complete sentence that re-states question in your answer! • FINISH Activity 1.2.4-Circuit Calculations • Draw schematics in engineering notebooks • Show all work when performing calculations • Formula, substitutions, answers with units • Answer conclusion questions • Copy question/short answer OR write a complete sentence that re-states question in your answer! • Activity 1.2.5-Mechanical System Efficiency • Complete in engineering notebooks, show all work when performing calculations • Formula, substitutions, answers with units • Answer conclusion questions • Copy question/short answer OR write a complete sentence that re-states the question in your answer!

  11. 10-6-14(B) Day 17 of 45 • SMET Rubrics are on your :p drives • Unit 1.2: • Activity 1.2.3-Electrical Circuits-Simulation • Draw schematics in engineering notebooks • Show all work when performing calculations • Formula, substitutions, answers with units • Answer conclusion questions • Copy question/short answer OR write a complete sentence that re-states the question in your answer! • Activity 1.2.4-Circuit Calculations • Draw schematics in engineering notebooks • Show all work when performing calculations • Formula, substitutions, answers with units • Answer conclusion questions • Copy question/short answer OR write a complete sentence that re-states the question in your answer!

  12. Shop Clean-up Crew: Jamie Cochran Josh Moore Zachary Myers Krissy Matthews 10-2-14(B) Day 16 of 45 • Unit 1.1: • Sequence 2 needs to set-up & run SMET projects again since my video is missing from my camera…. • That is unless someone took a video I can have access to • All-show me the 6 simple machines contained on your SMET Device • Carefully disassemble your SMET device • Save “useful” materials, throw away all trash • Try to salvage your base plywood if at all possible • Unit 1.2 • Introduction to Electricity.ppt • Take notes in engineering notebook

  13. 9-30-14(B) Day 15 of 45 Shop Clean-up Crew: Caleb Boring Crystal Moon Johnathyn Long Darien Hicks • Unit 1.1: • SMET^2 Project – FINAL DAY • Resume & FINISH testing with your adjoining groups • The more times you trial test the more opportunities to “work out the bugs” • FINAL TESTING for a grade by 10:15AM • Safety Glasses on at all times when working in the lab! • MAKE SURE YOUR sketches/descriptions of the 6 simple machines contained on your SMET device are UPLOADED TO THE UNIT 1 PAGE OF YOUR WEEBLY • DON’T FORGET TO PUBLISH!!

  14. 9-25-14(B) Day 14 of 45 Shop Clean-up Crew: Dalton Barefoot Kross Knight Kelc Ferguson Michael Brumbaugh • Unit 1.1 & 1.2: • Work, Energy, & Power.ppt • Take notes in engineering notebooks • FINISHsketches/descriptions of the 6 simple machines contained on your SMET device • Must be electronic (MS Word or .ppt)-look @ my example • Create sketches electronically using paint, Google sketch-up, Inventor, etc. • UPLOAD TO THE UNIT 1 PAGE OF YOUR WEEBLY WHEN COMPLETE, DON’T FORGET TO PUBLISH!! • SMET^2 Project • Continue/FINISH construction of your SMET^2 device • You should be approaching completion of construction by the end of class today • You really need to start testing with your adjoining groups • The more times you trial test the more opportunities to “work out the bugs” • FINAL TESTING NEXT CLASS • Safety Glasses on at all times when working in the lab!

  15. 9-23-14(B) Day 13 of 45 Shop Clean-up Crew: Chase Ennen Ben Rust Asa Smith Bryce Beckish • Unit 1.1 & 1.2: • Receive student log-ins??? • Energy Sources.ppt • Take notes in engineering notebooks • Resume sketches/descriptions of the 6 simple machines contained on your SMET device • Must be electronic (MS Word or .ppt)-look @ my example • Create sketches electronically using paint, Google sketch-up, Inventor, etc. • SMET^2 Project • Continue construction of your SMET^2 device • You should be approaching 3/4 complete with your construction of device • Start testing with your adjoining groups?!? • Communicate with adjoining groups! • Safety Glasses on at all times when working in the lab! • Leave Engineering notebooks @ end of class so I can check/grade 1.1.5

  16. 9-19-14(B) Day 12 of 45 Shop Clean-up Crew: Kyle Coker Josh Moore Zachary Myers Ryan Morin • Unit 1.1: • Register for Student Log-ins • Go over Activity 1.1.5 • Ask questions if unclear about gears, pulley drives, & sprockets • Begin sketches/descriptions of the 6 simple machines contained on your SMET device • Must be electronic (MS Word or .ppt)-look @ my example • Create sketches electronically using paint, Google sketch-up, inventor, etc. • FINISH Setting up your Weebly – No more class time will be given for this! • Create all necessary pages • Create Table of contents with links to all pages • Create links back to ToC from every page • Add content to pages • Look at the “getting started with weebly” document located on my website!! • SMET^2 Project • Continue construction of your SMET^2 device • You should be approaching 2/3 complete with your construction of device • Communicate with adjoining groups! • Safety Glasses on at all times when working in the lab!

  17. Shop Clean-up Crew: Jamie Cochran Darien Hicks Krissy Matthews Keith Matthews 9-17-14(B) Day 11 of 45 PVHS leaving at 10:25 • Unit 1.1: • FINISH Activity 1.1.5-Gears, Pulley Drives, & Sprockets Practice Problems • Complete the activity in your engineering notebook; show all work: Formula, Substitutions, Answer with units • Create annotated sketches when prompted • Receive your Weebly Username/Password • Log-in and change your password • Create all necessary pages • Create Table of contents with links to all pages • Create links back to ToC from every page • Add content to pages • Look at the “getting started with weebly” document located on my website!! • SMET^2 Project • Continue construction of your SMET^2 device • You should be approaching halfway complete with your construction of device • Communicate with adjoining groups! • Safety Glasses on at all times when working in the lab!

  18. 9-15-14(B) Day 10 of 45 Shop Clean-up Crew: Caleb Boring Crystal Moon Johnathyn Long Michael Brumbaugh • Discuss ALICE • Unit 1.1: • Activity 1.1.5-Gears, Pulley Drives, & Sprockets Practice Problems • Complete the activity in your engineering notebook; show all work: Formula, Substitutions, Answer with units • Create annotated sketches when prompted • SMET^2 Project • Continue construction of your SMET^2 device • Communicate with adjoining groups! • Safety Glasses on at all times when working in the lab!

  19. 9-11-14(B) Day 9 of 45 Shop Clean-up Crew: Dalton Barefoot Kross Knight Kelc Ferguson Bryce Beckish • Unit 1.1: • Gears, Pulley Drives, & Sprockets.ppt • Take notes in engineering notebooks • SMET^2 Project • Continue construction of your SMET^2 device • Communicate with adjoining groups! • Safety Glasses on at all times when working in the lab! • Note: we will now have a rotating cleaning crew that will be responsible for lab cleanliness @ the end of the day.

  20. 9-9-14(B) Day 8 of 45 PVHS leaving at 10:25 • Unit 1.1: • SMET^2 Project • Meet again with group for detailed brainstorming • Create an annotated sketch in your engineering notebook (individually) • Write a description of how it should work: • Sequence of machines, how they transfer energy, what they will be built out of, how you will be triggered and trigger the next group • No work in the shop until I have signed off on group brainstorming! • Begin construction of your SMET^2 device • Safety Glasses on at all times when working in the lab! • Leave engineering notebooks @ end of class so I can grade Activities 1.1.1 & 1.1.2

  21. 9-5-14(B) Day 7 of 45 • Unit 1.1: • The Honda Cog • Incredible Machines • Introduce SMET2 project (1.1.7) • Design Brief • Rubric • Videos • Class layout(s) • Meet briefly with your team for preliminary brainstorming • Create a “shopping list” of items to bring with you to class next time • FINISHActivity 1.1.2-Simple Machines Practice Problems • Individual assignment – complete this in your engineering notebook • Show all your work: formula, substitutions, answer w/ units! • Homework if not complete by the end of class today!

  22. 9-3-14(B) Day 6 of 45 • Re-take shop safety quiz (if applicable) • Unit 1: • FINISH Activity 1.1.1-Simple Machines Investigation (VEX) • Complete this with your group from last class • Complete the activity in your engineering notebook-each person in the group must do this! • Create annotated sketches when prompted, show all work for calculations (formula, substitutions, answer w/ units). • When answering questions write complete sentence that re-states the question in your answer OR copy question/short answer • Activity 1.1.2-Simple Machines Practice Problems • Individual assignment – complete this in your engineering notebook • Show all your work: formula, substitutions, answer w/ units!

  23. 8-29-14(B) Day 5 of 45 WHS leaving @ 10:39 • Quiz-Procedures & Shop Safety • Unit 1: • Activity 1.1.1-Simple Machines Investigation (VEX) • Work with a partner (we will need 1 group of 3) • Complete the activity in your engineering notebook-each person in the group must do this! • Create annotated sketches when prompted, show all work for calculations (formula, substitutions, answer w/ units). • When answering questions write complete sentence that re-states the question in your answer OR copy question/short answer • Activity 1.1.2-Simple Machines Practice Problems

  24. 8-27-14(B) Day 4 of 45 Go to PLTW Advisor @ 9:30 to pay fees & turn-in paperwork Hollingsworth’s, Davis, & Lennon advisees go @ end of class! • Unit 1: • Finish: Careers in Engineering & Engineering Technology.ppt • Take brief notes as needed • Simple Machines-Lever, Wheel & Axle, & Pulley.ppt • Take notes in engineering notebook • Simple Machines-Inclined Plane, Wedge, & Screw.ppt • Take notes in engineering notebook • Quiz Next Class-Procedures & Shop Safety

  25. 8-25-14(B) Day 3 of 45 Go to PLTW Advisor @ 9:30 to pay fees & turn-in paperwork • Traditional 1st day of class stuff: • Welcome & Introductions • Course Syllabus-Weebly • ACTC Parent/Student Handbook • Show my class website – Weebly • Note the URL & Password! • Employability Rating System • Distribute Engineering Notebooks • Engineering Notebooks.ppt • Shop Safety.ppt – Quiz on the 29th • Procedures quiz on the same day too! • Unit 1: • Careers in Engineering & Engineering Technology.ppt • Take brief notes as needed

  26. 8-21-14(B) Day 2 of 45 Go to PLTW Advisor @ 9:30 to pay fees & turn-in paperwork • Cannot begin class – missing some ASD1 students…

  27. 8-19-14(B) Day 1 of 45 Go to PLTW Advisor @ 9:30 to pay fees & turn-in paperwork • Cannot begin class – missing some ASD1 students…

  28. Principles of EngineeringDaily Class Planner Fall 2014 Mr. McCullough

More Related