1 / 44

CMAQ and the New Air Quality Standards

CMAQ and the New Air Quality Standards. Air Quality Team, FHWA Summer, 2004. Topics. Background on CMAQ CMAQ and the New NAAQS CMAQ and Reauthorization New Areas and CMAQ Eligibility CMAQ Tracking System. Background on the CMAQ Program. CMAQ Background.

vjonathan
Download Presentation

CMAQ and the New Air Quality Standards

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. CMAQ and the New Air Quality Standards Air Quality Team, FHWA Summer, 2004

  2. Topics • Background on CMAQ • CMAQ and the New NAAQS • CMAQ and Reauthorization • New Areas and CMAQ Eligibility • CMAQ Tracking System

  3. Background on the CMAQ Program

  4. CMAQ Background • Created by ISTEA of ’91, reauthorized by TEA-21, expected to continue • Funds transportation projects and programs to help achieve and maintain NAAQS for Ozone, CO, and PM-10 • Jointly administered by FHWA and FTA in consultation with EPA

  5. CMAQ Overview • $14.1 billion program under ISTEA and TEA-21 • Apportioned to States based on: • Population in ozone and CO areas • Severity of the air quality problem • All States guaranteed a 0.5% minimum apportionment • More than $13 Billion invested in 15,000 AQ projects since 1992

  6. CMAQ Funding by Project Type (FY 1992-2000)

  7. Flexible Funds for Transit (FY 1992 – FY 2002) Cumulative Transfers • CMAQ $5,051M • STP $3,464M • Other $699M • Total $9,214M

  8. CMAQ and the New NAAQS

  9. CMAQ and the New NAAQS • Underlying Principle of CMAQ $$: • Funding should be proportional to AQ problem • The CMAQ formula is statutory (see 23 USC 104) • New areas designated, but not covered by current statute (Title 23) • SAFETEA addresses 8-hr ozone, PM2.5

  10. Air Quality: New Ozone Nonattainment Areas

  11. Air Quality: Potential PM2.5 Nonattainment Areas EPA: 244 counties. Designations expected by end of 2004.

  12. CMAQ and Reauthorization

  13. Reauthorization of Surface Transportation Funding: SAFETEA • The last funding Act, TEA-21, covered FY ’98 – ‘03 and sunset 9/30/03. • Administration proposed SAFETEA in May 2003… • But Congress has yet to pass a new law • Current: short-term reauthorizations and continuing resolutions

  14. CMAQ Authorization Levels * Administration proposal

  15. Funding under 3 bills • SAFETEA: $8.9 billion for CMAQ ($256 billion total) • Senate: $13.4 billion ($341 billion) • House: $9.4 billion ($285 billion)

  16. More Areas, More Funding?? • More than 120 new counties will be nonattainment for 8-hour ozone • More than 240 counties projected to be nonattainment for fine PM

  17. Reauthorization: CMAQ and SAFETEA CMAQ Apportionment formula • Administration proposed formula changes to adopt new NAAQS • Senate (S.1072) adopted our changes • House (HR 3550) has not • Changes to reflect the new NAAQS are expected, but when?

  18. TEA-21 Weighting Factors

  19. SAFETEA Weighting Factors

  20. TEA-21, SAFETEA Differences

  21. SAFETEA & New Pollutants • New 8-hr ozone areas weight = 1.0 • New PM2.5 areas weight = 1.2 • Multiple pollutants earn extra weight • 1-hr ozone factors (marginal to extreme) will take precedence in FY05

  22. Reauthorization Scenarios • SAFETEA passes in FY04 • SAFETEA passes in FY05 • Wild card– New NAAQS provisions not adopted??

  23. If SAFETEA (new NAAQS provisions) passes in FY04 • FY05 apportionments would reflect new law • 8-hr areas would be included • Where 1-hr and 8-hr overlap, 1-hr would take precedence • No 1-hr areas removed from CMAQ apportionment formula • PM2.5 areas will not be included

  24. If SAFETEA Passes in FY04 FY2006-2009 • 1-hr ozone std. revoked (expected June 2005) • 1-hr areas will be removed from formula • 8-hr areas will remain in the formula • PM2.5 areas designated (expected December 2004) • Include in FY06 apportionments

  25. If SAFETEA passes in FY05 • Initial FY05 apportionments will be made according to TEA-21 formula • Leave out 8-hr; PM2.5 • Final FY05 apportionments will be redone once SAFETEA is signed to include 8-hr areas

  26. Wild card?? • Congress could pass something different • Impossible to guess OR • Congress could fail to adopt new NAAQS provisions • FY05: 8-hr not included (formula based on 1-hr and CO areas) • FY06: 8-hr, PM2.5 not included (formula based on CO only!)

  27. Even if No Bill is Passed… • New areas can spend CMAQ funds once they have been designated • However, States will not be apportioned funds for 8-hr / PM2.5 areas without new legislation

  28. Early Action Compacts • No statutory basis for including EACs in apportionments—nonattainment is deferred • No draft bill brings EACs into the formula • Exception is EACs that are 1-hour ozone maintenance—they remain in the formula

  29. Former CMAQ Areas • Areas no longer identified as NA or maintenance are out of the formula and ineligible for CMAQ investment • Existing CMAQ guidance features some flexibility and transition for these areas • Updated guidance is under discussion

  30. New Areas and CMAQ Eligibility

  31. CMAQ Projects Must • …be a Transportation Project • …in a NA/Mtce area • …that reduces emissions

  32. Station Cars/ Car Sharing Boston, Seattle HD Diesel Retrofits CA Truck Stop Electrification NYC Intermodal Freight Ohio, Maine, NYC New Fuels - Fuel Cell Buses Chicago, Houston, Atlanta, LA ITS – Transit and Road Everywhere Public-Pvt. Partnerships Jersey City, Chicago, Atlanta Parking Cash Out Glendale I/M & Remote Sensing WI, NY, DC, IN, IL, NJ Transit-Oriented Dev. Portland, Minneapolis CMAQ and Creativity: Examples

  33. Areas New to CMAQ? MPOs need to develop a CMAQ project selection process • Involve partners and stakeholders • Transparent, codified • Annual CMAQ reports

  34. Basic CMAQ Eligibility… Eligible projects include: • transit improvements • shared ride services • traffic flow improvements • demand management • bicycle and pedestrian projects • alternative fuels • inspection and maintenance programs • freight services • experimental pilots • public / private partnerships

  35. CMAQ Eligibility • Idle Reduction projects • Freight projects (intermodal) • Rail / truck / barge • Diesel Retrofit projects • On-road: Freight and buses • Off-road: construction equipment • Conformity credit issue

  36. Truck and Rail Flows Traffic Congestion

  37. Alternative Fuels • Biodiesel Projects • Yes, but probably not in NOx-limited areas • Hybrids

  38. Other Issues • Operating costs-3 year limit • Vehicle lease as capital cost • Increased emphasis on meeting ADA requirements

  39. CMAQ Reporting Requirements

  40. CMAQ Tracking System

  41. CMAQ Tracking System • Benefits of using the system • Standardize data • Create reports for your State • Upload vs. entering individual projects

  42. Expected Emissions Benefits (VOC, FY2000)

  43. http://www.fhwa.dot.gov/environment/cmaqpgs/index.htm Michael.Koontz@fhwa.dot.gov (CMAQ Coordinator) Diane.Turchetta@fhwa.dot.gov Victoria.Martinez@fhwa.dot.gov Robert.Kafalenos@fhwa.dot.gov Michael.Savonis@fhwa.dot.gov (AQ Team Leader)

  44. Questions??

More Related