1 / 19

Definition of hazard (political, not scientific) Where and when will earthquakes occur?

Earthquake hazard isn’t a physical thing we measure. It's something mapmakers define and then use computer programs to predict. To decide how much to believe a hazard map, we need to know what the mapmakers assumed, and what the effects of those choices were.

vito
Download Presentation

Definition of hazard (political, not scientific) Where and when will earthquakes occur?

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Earthquake hazard isn’t a physical thing we measure. It's something mapmakers define and then use computer programs to predict. To decide how much to believe a hazard map, we need to know what the mapmakers assumed, and what the effects of those choices were. • Definition of hazard (political, not scientific) • Where and when will earthquakes occur? • If they occur, then • how large? • How large will ground motion be?

  2. Assume that an earthquake of a certain size will strike in a certain time and cause shaking within a certain area. Strongly shaken areas MMI > VII for M 6 • Include earthquakes of different magnitudes, assume some areas more likely to have earthquakes, and have stronger shaking close to the epicenter. Hazard at a given location is described by the maximum shaking due to earthquakes that is predicted to happen in a given period of time.

  3. Two methods of predicting hazard DHSA - deterministic seismic hazard assessment - chose the biggest earthquake to worry about, decide where & how big it will be, and how much shaking it will cause. PSHA - probabilistic seismic hazard assessment - estimate combined hazard from many different earthquakes. Use the probabilities and uncertainties of factors like the location and times of earthquakes and how much shaking will result from an earthquake of a given magnitude. DSHA makes society spend lots of money preparing for an event that is very unlikely to happen during a structure's life. PSHA defines hazard via a mathematical event rather than real one, so results depend in complex ways on the probabilities and uncertainties assumed. ”Simplicity is deeply veiled by user-hostile notation, antonymous jargon, and proprietary software"(Hanks and Cornell, 1994. As probabilistic models cover longer time windows they become about the same as deterministic ones, but emphasize extreme cases even more

  4. “Estimates of some specific PSHA studies are very surprising, particularly at small exceedance rates. High standard deviations in ground motion prediction equations are a leading candidate to explain the surprising hazard predictions.” Anderson, 2010

  5. SHORT RECORD OF SEISMICITY & HAZARD ESTIMATE Africa-Eurasia convergence rate varies smoothly NUVEL-1 Argus et al., 1989 Predicted hazard from historic seismicity is highly variable Likely overestimated near recent earthquakes, underestimated elsewhere More uniform hazard seems more plausible - or opposite if time dependence considered Map changes after major earthquakes GSHAP

  6. SHORT RECORD OF SEISMICITY & HAZARD ESTIMATE Africa-Eurasia convergence rate varies smoothly NUVEL-1 Argus et al., 1989 Predicted hazard from historic seismicity is highly variable Likely overestimated near recent earthquakes, underestimated elsewhere More uniform hazard seems more plausible - or opposite if time dependence considered Map changes after major earthquakes 2003 2004 GSHAP

  7. Long record needed to see real hazard Swafford & Stein, 2007

  8. “Our glacial loading model suggests that earthquakes may occur anywhere along the rifted margin which has been glaciated.” Stein et al., 1979 1985 2005

  9. HIGH MODELED NMSZ HAZARD RESULTS FROM HIGH-END ASSUMPTIONS Systematic • Future earthquakes will be like past ones in location & timing • Redefined from maximum acceleration predicted at • 10% probability in 50 yr • to 2% in 50 yr (1/ 500 yr to 1/2500 yr) Doesn’t consider space-time variability Arbitrary choice on policy grounds; no cost/benefit analysis Measurement • -Large magnitude of 1811-12 and thus future large earthquakes • High ground motion in large events Uncertainty in interpreting intensity data Lack of data; chose high model

  10. Algermissen et al., 1982 Hazard redefined from maximum acceleration predicted at 10% probability in 50 yr (1/ 500 yr ) to much higher 2% in 50 yr (1/2500 yr) Frankel et al., 1996

  11. New Madrid hazard higher than California results largely from redefining hazard as largest shaking expected every 2500 yr: Not so for 500 yr 500 yr 2500 yr Searer & Freeman, 2002 500 yr 2500 yr

  12. PREDICTED HAZARD DEPENDS ON ASSUMED MAXIMUM MAGNITUDE OF LARGEST EVENTS AND ASSUMED GROUND MOTION MODEL Frankel/Toro: St Louis 1.8 Memphis 1.3 Newman et al., 2001

  13. EFFECTS OF ASSUMED GROUND MOTION MODEL Effect as large as one magnitude unit Frankel model, developed for maps, predicts significantly greater shaking for M >7 Frankel M 7 similar to other models’ M 8 Frankel & Toro models averaged in 1996 maps; Atkinson & Boore not used Newman et al., 2001

  14. ASSUMED HAZARD DEPENDS ON EARTHQUAKE PROBABILITY ASSUMPTION Constant since last event: time independent Small after last event, then grows: time dependent Time dependent lower until ~2/3 mean recurrence Results depend on model & parameters Hebden & Stein, 2008

  15. RELATIVE PREDICTED HAZARD DEPENDS ON POSITION IN EARTHQUAKE CYCLE Time dependent lower until ~2/3 mean recurrence Charleston & New Madrid early in their cycles so time dependent predicts lower hazard Hebden & Stein, 2008

  16. NEW MADRID 2% in 50 yr (1/2500 yr) Memphis: TD at present is 64% of TI

  17. Time dependent model for eastern US predicts lower New Madrid & Charleston hazard Effect larger than lowering Mmax and thus ground motion model Including GPS makes effect much greater Mw 7.7 (NMSZ) Mw 7.3 (Charleston) Hebden & Stein, 2008

  18. Assume from GPS data no M7 on the way Some hazard remains from earthquakes up to M ~ 6.7 Hazard ~ 1/10 that of USGS prediction USGS, 2500 yr, assumes M 7 coming GPS, 500 yr, assumes no M 7 coming Hard to assess possible hazard of M7 on other faults No evidence, but can’t exclude until we understand mechanics

  19. CHARLESTON 2% in 50 yr (1/2500 yr) Hebden & Stein, 2008

More Related