alabama tier ii update n.
Download
Skip this Video
Loading SlideShow in 5 Seconds..
Alabama Tier II Update PowerPoint Presentation
Download Presentation
Alabama Tier II Update

Loading in 2 Seconds...

play fullscreen
1 / 25

Alabama Tier II Update - PowerPoint PPT Presentation


  • 163 Views
  • Uploaded on

Alabama Tier II Update. Jimbo Carlson Chief, Facilities Engineering Section Governmental Hazardous Waste Branch Land Division. Key Topics. My Perspective on Partnering Partnering in Alabama The Redstone Challenge Other Hot Topics in Alabama. Alabama Tier II Perspective. Partnering Roles

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about 'Alabama Tier II Update' - violet-yang


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
alabama tier ii update

Alabama Tier IIUpdate

Jimbo Carlson

Chief, Facilities Engineering Section

Governmental Hazardous Waste Branch

Land Division

adem.alabama.gov

key topics
Key Topics
  • My Perspective on Partnering
  • Partnering in Alabama
  • The Redstone Challenge
  • Other Hot Topics in Alabama
alabama tier ii perspective
Alabama Tier II Perspective
  • Partnering Roles
    • Partner vs Regulator
    • Partner vs Mission
  • Trust
partnering in alabama
Partnering in Alabama
  • Alabama Teams
    • Fort Rucker
    • Anniston Army Depot
    • Fort McClellan
    • Maxwell Air Force Base
    • Marshall Space Flight Center
    • Redstone Arsenal
partnering in alabama cont
Partnering in Alabama cont..
  • State Challenges
    • Lack of Experienced Personnel
    • 7 of 12 Tier I Members < 2.5 Years Experience
    • Training Ground
    • No Risk Assessors
the redstone challenge
The Redstone Challenge
  • Site Complexity
  • New Faces/Members
  • Lack of Trust
  • Solutions
site complexity
Site Complexity
  • 356 Total Sites (RCRA & Restoration)
  • 13 Commingled Groundwater Plumes
  • RODs Proposed for the coming years
new faces members
New Faces/Members
  • ADEM has four RPMs
    • Plus 2 Hydrogeologist
    • ADEM also has Contract Support
      • Risk Assessors and UXO Expertise
  • EPA has 2 RPMs along with 1 additional FTEs
    • Also has Contract Support
lack of trust
Lack of Trust
  • No Actual Partnering Taking Place
    • Technical Oversight
    • Significant Arguing at the Table
    • Tier II Not Welcome
solutions
Solutions
  • Personnel Changes
    • EPA and ADEM
  • Back to Basics
    • Tier I tasked by Tier II to determine type of training/facilitation needed
    • Redstone Tier II representative procured training funds
    • Tier I Chose Facilitator
federal facility agreement
Federal Facility Agreement
  • FFA Background
  • Current Status
groundwater irod
RSA – 99 (Abandoned Plating Shop)

Two Party ROD signed in 2004

ADEM Position

Tier II tasked Tier I to develop a Groundwater Interim Record of Decision

Groundwater IROD
other hot topics
Other Hot Topics

Anniston Chemical Demilitarization Facility

ancdf
ANCDF
  • Finished GB Campaign in March 06
  • VX Campaign started in July 06
    • All VX M55 Rockets destroyed as of March 07
      • Eliminated 97% of Risk to Community
    • Recently began destroying 155mm Projectiles
      • 140,000 155mm & 44,000 Mines Left
  • Mustard Campaign scheduled to begin in September 2010, finishing in August 2013
    • 106 Ton Containers & 430,000 4.2” Mortars
camp sibert
Camp Sibert
  • Site 8 – Former Toxic Munitions Impact Area
    • 6870 Anomalies Dug
      • 23% Hot Soil
      • 27% Cultural Debris
      • 40% Munitions Debris
      • 0.3% UXO
        • 18 4.2” Mortars with a Liquid Fill
  • Sites 17 &18 Former Japanese Pill Boxes
    • To date: 1 Conventional 4.2” Mortar and 3 Liquid Filled 4.2” Mortars
  • Site 19 Conventional Impact Mortar Range Area
    • 1 Livens Projectile (Liquid Filled)