Welcome! Benvenuti ! Dobrodošli ! Willkommen! أهلاً و سهلاً ! Добро пожаловать ! ברוכים־הבאים !. History. Delta inženjering founded in 1990. Founders of the company are also the shareholders.

vine
Download Presentation

Welcome! Benvenuti ! Dobrodošli ! Willkommen! أهلاً و سهلاً ! Добро пожаловать ! ברוכים־הבאים !

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Welcome! Benvenuti! Dobrodošli! Willkommen! أهلاً و سهلاً ! Добро пожаловать! ברוכים־הבאים!

  2. History • Delta inženjering founded in 1990. • Founders of the company are also the shareholders. • Since the beginning Delta inženjering has been constantly growing, with an increased number of realized projects and capacities.

  3. Certifications • ISO 9001:2008 – Quality Management System • ISO 14001:2004 - Environmental Management System • OHSAS18001:2001 - Assessment Specification for occupational health and safety management systems

  4. Organizational Chart Managing Director Bojan Tomic Reports Assistant Managing Director Vesna Trbovic Director of Research and Development Dragan Zeljkovic Director of Sales and Finance Uros Glisovic Department for Water Treatment and Ecology QC Department Design Department Construction Department Finance and Accounting Administration Construction Bureau Mechanical/Technological Office Bureau for Water Treatment and Ecology IT Department Sales Support Construction Site Civil/Architectural Office Purchasing Marketing Bureau for Safety at Work Electrical Office Logistics Human Resources

  5. Delta Inzenjering Services Main fields of activities of Delta Inzenjering are industry related design and construction. We can provide our Clients with the following Scope of services in accordance with our organizational structure: • Design • Construction • Environmental • Control activities for pressure equipment

  6. Present • We currently have over 120 Dipl. engineers in various fields • The majority of our Dipl. engineers are licensed on a government level, enabling us to partake in any scope of project • Current major projects – USS, DUOCHEM, Oil Refinery Pancevo (GASPROM), HOLCIM, MESSER

  7. Technical Documentation Licenses Delta Inženjering holds the license for development of technicaldocumentation and building of projects for which approval for construction is issued by Ministry of Construction, such as: PO30E4 – projects of control of drive units - automatics, regulators and controls, for the facilities producing and processing gas and oil, international and primary gas and oil transportation pipelines, for the gas pipelines of nominal working overpressure above 16 bar if crossing over the territories of at least two municipalities, for the storage of oil, gas and oil derivatives capacity over 500 t and the primary and regional heating lines. PO32M1 – projects of heat engineering, thermal power, processing and gas installations for international and primary gas and oil transportation pipelines, for gas pipelines of nominal working overpressure above 16 bar if crossing over the territories of a least two municipalities, for the storage of oil, gas and oil derivatives capacity over 500 tons PO40E4 – projects of control of drive units – automatics, regulators and controls, for the facilities of basic and processing chemical industry, facilities for ferrous and nonferrous metallurgy, facilities for leather and fur processing, facilities for caoutchouc processing, facilities for cellulose and paper processing and facilities for non-metal minerals PO40M3 – projects of transportation means, storages and mechanical structures and technologies for the facilities of basic and processing chemical industry, facilities for ferrous and nonferrous metallurgy, facilities for leather and fur processing, facilities for caoutchouc processing, facilities for cellulose and paper processing and the facilities for non-metal minerals

  8. Technical Documentation Licenses Delta Inženjering holds the license for development of technicaldocumentation and building of projects for which approval for construction is issued by Ministry of Construction, such as: PO71M2 – projects of mechanical installations for water supply and industrial water facilities, hydraulic installations and power plants for interregional and regional structures of water supply and sewerage as well as for the systems of water supply and waste water channeling in the cities and urban areas exceeding 100,000 population P111E4 – projects of control of drive units – automatics, regulators and controls, for buildings at airport complex (passenger terminals, cargo terminals, air bases – hangars, infrastructure and radio-navigation equipment) P101M1 – projects of heat engineering, thermal power, process and gas installations for plants and facilities removing waste by chemical procedure, as well as for structures built for production, storage and destruction of detrimental substances and waste with a property of hazardous matter

  9. Construction Licenses Delta Inženjering holds the license for building the structures for which approval for construction is issued by the Ministry of Construction, such as: IO31M1 – heat engineering, thermal power, processing and gas installations on international and primary gas and oil transportation pipelines, the gas pipelines of nominal working overpressure above 16 bar if crossing over the territories of at least two municipalities, the storages of oil, gas and oil derivatives capacity over 500 tons‘ IO71M2 – mechanical installations on water supply and industrial water facilities, hydraulic and water power plants on inter-regional and regional structures of water supply and sewerage as well as the systems of water supply and waste water channeling in the cities and urban areas over 100,000 population IO72M2 – mechanical installations on water supply and industrial water facilities, hydraulic and water power plants for drinking water treatment capacity exceeding 40 l/s IO73M2 – mechanical installations on water supply and industrial water facilities, hydraulic and water power plants for waste water treatment plants in the settlements over 15,000 population or capacity exceeding 40 l/s IO40M3 – works on transport means, storages and mechanical structures on facilities of basic and processing chemical industry, facilities of ferrous and nonferrous metallurgy, facilities for leather and fur processing, facilities for caoutchouc processing, facilities for cellulose and paper processing and facilities for non-metal minerals I102M1 – heat engineering, thermal power, process and gas installations on structures for production, storage and destruction of detrimental substances and waste with a property of hazardous matter

  10. Delta Inženjering Group In 2005, Delta inženjering Group was founded to better serve our clients needs In the past 4 years Delta Inzenjering Group has acquired and formed 10 companies that can provide a more competitive position for the benefit of our clients

  11. Deltainženjering Group Employees

  12. Members of the Delta Inženjering Group Alfa mont – construction company focused on steel structure raising and technological equipment mounting

  13. Members of the Delta Inženjering Group ČelikŽitorađa– a steel structure factory with 160 employees, 8000 square meters of production space, with advanced mechanical and welding equipment. Capable of yearly production of 3500 t of steel structure. Factory is located in Žitorađa, 300 km south of Belgrade.

  14. Members of the Delta Inženjering Group Welding Institute – one of the most prominent institutions of its kind in South Eastern Europe, a member of the International Welding Institute • - investigation and experimental development in technical-technological sciences- technical testing and analysis;- engineering;- education of adults and other kinds of education,- quality assurance.

  15. Members of the Delta Inženjering Group Delta inženjeringBeton– concrete factory, capable of production of 30m3 of quality controlled concrete per hour. Factory is located in StaraPazova, 40 km north of Belgrade.

  16. Members of the Delta Inženjering Group Nikal – factory for aluminum and PVC products for building construction, operating under Rehau license

  17. References Designed and supervised the construction of the secondary de-dusting plant, with a total capacity of 1,100,000 cubic meters per hour. In addition to hoods, channels, steel structure supports, spark arrestor, bag filter, three ventilators of 900 kW each, stack and auxiliary equipment.

  18. References

  19. References

  20. References

  21. References Delta at work at USS.

  22. References Complete turn key project (from design, construction, finishing with usage permit) for the Henkel adhesive factory.

  23. References

  24. References Designed and erected the flash dryer, clinker silo, belt conveyers, bag filter for the cement kiln. Developing main designs and environmental impact studies for the legalization of the entire plant.

  25. References General contractor for the Monbat used car battery recycling center.

  26. References Complete turn key project (from design, construction, finishing with usage permit) for the Volvo regional truck service center.

  27. References Complete turn key project (from design, construction, finishing with usage permit) for the Husqvarna regional truck service center.

  28. References Complete turn key project (from design, construction, finishing with usage permit) for the Alumil extruded aluminum profile factory.

  29. References Complete turn key project (from design, construction, finishing with usage permit) for the Knauf Insulation mineral wool factory.

  30. References Power house, with a steam boiler (capacity 17 t steam per hour)

  31. References ASU Rybnyk, Poland – Basic design and construction management service for plant with production of 10000 Nm3/h of oxygen. ASU Ukraine – Basic design, main design, project management service, construction management service, equipment also for plant with production of 10000 Nm3/h of oxygen. ASU Romania – Construction management service

  32. References Complete turn key project (from design, construction, finishing with usage permit) for the Solgroup filling station and warehouse for technical gases.

  33. References – Sirmium Steel Serbia We completed the study on environmental impact. Currently negotiating the position of general contractor for all current activities.

  34. Thank you for your Time!For more information please visit:http://www.deltainzenjering.rs/en/index.aspx