Download
vista internationalization project group phase 1 end n.
Skip this Video
Loading SlideShow in 5 Seconds..
VistA Internationalization Project Group—Phase 1 End PowerPoint Presentation
Download Presentation
VistA Internationalization Project Group—Phase 1 End

VistA Internationalization Project Group—Phase 1 End

132 Views Download Presentation
Download Presentation

VistA Internationalization Project Group—Phase 1 End

- - - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript

  1. VistA Internationalization Project Group—Phase 1 End By Sam Habiel, PharmD Presenter Peter Li November 13th, 2018

  2. Happenings Last Week (1/2) • All code merged into plan-vi branches • https://github.com/OSEHRA-Sandbox/VistA/tree/plan-vi • https://github.com/OSEHRA-Sandbox/VistA-M/tree/plan-vi • VEHU repo now has a plan-vi branch • https://github.com/OSEHRA-Sandbox/VistA-VEHU-M/tree/plan-vi

  3. Happenings Last Week (2/2) • %DT routine now handles inexact dates in yyyy/mm format (thanks to G Timson) • New Docker Image: VEHU6 • VEHU with i18n code changes • https://hub.docker.com/r/osehra/vehu6/ • Compiled CPRS Code/Vitals dll • https://github.com/OSEHRA-Sandbox/VistA/releases/tag/cprs31a-utf8-c

  4. VEHU6 Screenshots

  5. VEHU6 Screenshots

  6. VEHU6 Screenshots

  7. VEHU6 Screenshots

  8. VEHU6 Screenshots

  9. Summary of Phase 1 • CPRS Read/Write to VistA Unicode Data • CPRS Localization Strategy and Framework • CPRS display of correct date format depending on Windows Locale

  10. Phase 2 Plan • Phase 2 is M infrastructure i18n • Will involve more proper changes to some of the M code changed in Phase 1

  11. Phase 2 Objectives • Move non-portable code in XWBRW to Kernel (use of $ZL, $ZE). • Fix XLFNAME code to allow non-US names • Localize Data in Fileman (e.g. Cover sheet headers) • Localize Menu System • Localize a simple workflow in Outpatient Pharmacy • Put in Korean Lexicon and test with CPRS

  12. Schedule

  13. Personal Schedule over next 2 weeks • Peter will present this week (Nov 13) • Off week after (Nov 20) • Sam back Nov 27