80 likes | 227 Views
Mate Competition 2013. Task 1 steps 1-5. Step 1. 5 pts - Transfer the SIA (Scientific Interface Assembly) to the seafloor . Step 2. 20 pts – Installing the SIA (Scientific Interface Assembly) so it rests completely within the BIA (Backbone Interface Assembly). Step 3.
E N D
Mate Competition 2013 Task 1 steps 1-5
Step 1 5 pts - Transfer the SIA (Scientific Interface Assembly) to the seafloor
Step 2 20 pts – Installing the SIA (Scientific Interface Assembly) so it rests completely within the BIA (Backbone Interface Assembly)
Step 3 5 pts – Removing the CTA (Cable Termination Assembly) from the seafloor
Step 4 20 pts – Inserting the CTA from the bulkhead connector on the BIA Not this kind of CTA
Step 5 10 pts – Pulling the pin to release the OBS (Ocean Bottom Seismometer) from the elevator. Pull me!! Elevator OBS PIN!!!
Step 5 10 pts – Pulling the pin to release the OBS (Ocean Bottom Seismometer) from the elevator.
Step 5 10 pts – Pulling the pin to release the OBS (Ocean Bottom Seismometer) from the elevator.