This project details the biomass transport system implemented at the Poříčí II Power Station. It features a belt width of 1600 mm and operates at a speed of 1 m/s. The system is powered by two drives, each with a capacity of 22 kW. This efficient transport solution enhances the overall biomass handling process, ensuring effective delivery to the energy generation unit. The project includes comprehensive technical specifications and operational guidelines, ensuring successful implementation and operation.

urania
Download Presentation

Transport System for Biomass at Poříčí II Power Station

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. PROJECT: POWER STATION POŘÍČÍ II

  2. TRANSPORT OF BIOMASS EPO • Beltwidth 1600 mm • Belt speed 1 ms-1 • Drive1 2 x 22kW • Drive2 1 x 22kW Strana2

  3. Strana3

  4. Strana4

  5. Strana5

  6. Strana6

  7. Strana7

  8. Thank you for attention… Strana8

More Related