1 / 29

ILD Detector Optimization and Benchmarking

ILD Detector Optimization and Benchmarking. Akiya Miyamoto, KEK at Tsinghua University 12-January-2009. ILD Introduction. ILC Reference Design (RDR) in 2007 GLD Detector Outline Document (DOD) arXiv:physics /0607154 LDC DOC http://www.ilcldc.org/

una
Download Presentation

ILD Detector Optimization and Benchmarking

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. ILD Detector OptimizationandBenchmarking Akiya Miyamoto, KEK at Tsinghua University 12-January-2009

  2. ILD Introduction • ILC Reference Design (RDR) in 2007 • GLD Detector Outline Document (DOD) arXiv:physics/0607154 • LDC DOC http://www.ilcldc.org/ Common feature: Tracker(Pixel & Silicon & Gas) + PFA calorimeter + … LDC GLD • At LCWS2007, we agreed to work together for a joint LOI • GLD (B=3T, RECAL=2.1m) + LDC(B=4T, RECAL=1.6m )  ILD ILD origins in the European and Asian based Large Detector study. Seminar at Tsuingha Univ., 12-Jan-2009

  3. International Large Detector ( ILD ) • But in detail: • B=4 Tesla(LDC) vs 3 Tesla(GLD) • ECAL radius: 1.6m(LDC) vs 2.1m(GLD) • Sub Detector technologies • …. • Simulation studies of physics performances are used to reach agreement of detector parameters. • LDC and GLD had a common future; • Pixel vertex detector placed very close to the beam pipe. • Gaseous tracker, TPC, for highly efficient and precise track measurements,supplemented by silicon trackers. • EM and HD calorimeters are placed inside a solenoid field and read our by very small sensors to achieve a good energy measurement by Particle Flow Analysis (PFA). Seminar at Tsuingha Univ., 12-Jan-2009

  4. How we optimize • Performances have been studies as a function of major parameters. • Reached a consensus on the ILD reference detector for LOI benchmark studies at Cambridge (Sep. 2008). • Physics performance studies have been performed based on ILD model. • Optimization tools • GLD  Jupiter/Sattelites, LDC Mokka/MarlinReco • intermediate detector models were introduced for comparison • GLDPrim by Jupiter, and LDCPrim by Mokka, both having B=3.5T and RECAL=1.85m. Seminar at Tsuingha Univ., 12-Jan-2009

  5. Jupiter/Satellites forFull Simulation Studies : GLD For real data Tools for simulation Tools Satellites URANUS JUPITER METIS Input/Output module set IO JLC Unified Particle Interaction and Tracking EmulatoR Unified Reconstructionand ANalysis Utility Set Monte-Calro Exact hits To Intermediate Simulated output LEDA Library Extention forData Analysis Geant4 based Simulator JSF/ROOT based Framework MC truth generator Event Reconstruction JSF: the analysis flow controller based on ROOT The release includes event generators, Quick Simulator, and simple event display Seminar at Tsuingha Univ., 12-Jan-2009

  6. Mokka LDC • Mokka is a full simulation using Geant4 and a realistic description of a detector for the future linear collider. • Home page: http://polzope.in2p3.fr:8081/MOKKA Mokka is now a part of the ilcsoft, http://ilcsoft.desy.de/portal/software_packages/ • Detector Geometry: • managed by MySQL data base and CGA (Common Geometry Access) API. • LDC and other variants are prepared and used for ILD optimization. • Implementation of detailed detector model based on engineering studies is in progress. ex. ECAL structure  Seminar at Tsuingha Univ., 12-Jan-2009

  7. PandoraPFA LCFIVertex

  8. GLD + LDC Combined Framework Whizard Physsim • StdHep: Same generator data • LCIO: Common IO format • GLDPrim/LDCPrim: Similar detector model StdHep LDC GLD MOKKA Jupiter LCIO LCIO helps to collaborative works for detector optimization Marlin Sattelites LCIO After the LOI, two frameworks will be merged to a single framework. DST and Analysis Seminar at Tsuingha Univ., 12-Jan-2009

  9. Detector Parameters for Opt. studies GeometryiesinMokka and Jupiter are similar, but there are many small differences in geometry and assumed detector technologies • GLD/GLDPrim/J4LDC  prepared for Jupiter • LDC/LDCPrim/LDCGLD  prepared for Mokka  Physics performance was compared between different geometries Seminar at Tsuingha Univ., 12-Jan-2009

  10. Pt resolution Single muon, produced at cosq=0. by Jupiter+Satellites: TPC+IT+VTX fitting LDC : ~5% worse at high Pt  Shorter Lever arm GLD/GLD’: ~10%worse at low Pt  Lower B Seminar at Tsuingha Univ., 12-Jan-2009

  11. GLDPrim - LDCPrim LDCPrim(Mokka+Pandora) is better than GLDPrim(Jupiter+Sattelites) by 15~30%. Possible source: srf(IT) 4mm(LDCPrim)  10mm(GLDPrim) Silicon External Tracker in Mokka 4mm 3x10-5 Sub-detector technology is more important than geometry Seminar at Tsuingha Univ., 12-Jan-2009

  12. GLDPrimvsLDCPrim (srf(IP)) • GLDPrimis better than LDCPrim ; • 3 double layers vs 5 layers ? srf=sZ=2.8mm Fast sim. study by M.Berggren Seminar at Tsuingha Univ., 12-Jan-2009

  13. kaon_0L Energy Resolution Hadron Model: LCPhysics HCAL response is not smooth around 13 GeV - LE/HE behaviour ECAL resolution: same Seminar at Tsuingha Univ., 12-Jan-2009

  14. Jet measurement: Particle Flow Analysis PFA: Charged particles by Tracker Neutral particles  by Calorimeter, remove charged particle energies Performance studies depend on shower simulation; longitudinal, lateral, and tofdistribution, neutron response, etc. Seminar at Tsuingha Univ., 12-Jan-2009

  15. Jupiter data analyzed by PandoraPFA Pandora PFA: Sophisticated algorithm tuned to Geant4 shower shape has achieved the performance goal of ILC, DE/E ~ 30%/√E Z pole uds-pair events:GLDPrim Ejet(GeV) Seminar at Tsuingha Univ., 12-Jan-2009

  16. Jet Energy Resolution Same trend is seen by analysis of Jupiter models, though performance is slightly worse than Mokka model Seminar at Tsuingha Univ., 12-Jan-2009

  17. ECAL Seg. and HCAL thickness by M. THomson • Performance is strong function of ECAL seg. size. • 2x2cm2 too large, 1x1cm2 would be ok for jets with E < 100 GeV ILD: ECAL+HCAL= 6.8 Int. L.(48layers) 6.8 Int. L look OK, but worse resolution is seen for 90o jets. Seminar at Tsuingha Univ., 12-Jan-2009

  18. Physics Benchmark Studies • According to the request by ILC Research Director (RD) and International Detector Advisory Group(IDAG), simulation studies for LOI should • based on a realistic Monte Calro program • based on a realistic reconstruction program • include backgrounds by physics processes and those caused by accelerator. • Signal processes: the minimum set. • Recoil mass measurement by e+e- ZH  e+e-/m+m- + H • H c cbar decay in e+e-  ZH process • e+e-  t tbar  6 jets and t (tbar) charge ID for AFB meas. • e+e-  t+t- and t pol. measurement. • Separate WW and ZZ in Chargino/Neutrino pair production process ILC goal  precise studies of Tera scale physics. Seminar at Tsuingha Univ., 12-Jan-2009

  19. Higgs recoil mass meas. by ItohKazutoshi Compare 3 geometries GLDprim case, with backgound m+m-X e+e- Channel m+m-channel Differences are small. • e+e-  ZH  e+e-X / m+m-X , Ecm=250 GeV, 250 fb-1 • Analysis. • Select e+e- / m+m- consistent with Z and study recoil mass • Precise track meas. is a key for Seminar at Tsuingha Univ., 12-Jan-2009

  20. Benchmark study: Example by TaikanSuehara • Using several detector models, performance to separate W/Z in jet mode have been studied using SUSY processes Seminar at Tsuingha Univ., 12-Jan-2009

  21. e+e- t+t-,t rn by TaikanSuehara • t is polarized  probe New Phyaics SM+NP SM Seminar at Tsuingha Univ., 12-Jan-2009

  22. ILD reference detector model •  for the sake of simulation, some detector technologies are assumed in Mokka. But as ILD, many detector technologies are open and not selected at the time of LOI. •  By the time of LOI, we have no time to merge Jupiter/Sattelites and Mokka/Marlin framework. A work to merge two framework for “ILD Software” will come after LOI. • At 2nd ILD WS at Cambridge, we agreed to created the new model,ILD reference design model for LOI, in Mokka: • Model parameters, • B=3.5 Tesla • Rin ECAL=185cm, TPC: halfZ=230cm • VTX three double layers. • Silicon trackers: ( SIT, FTD, SET, SOT) • Calorimeters (ECAL 22X0, 0.5x0.5cm, HCAL ) • …. Seminar at Tsuingha Univ., 12-Jan-2009

  23. Mokka model CAD Model

  24. ILD_00 MC/DST production • Started since Dec. last year, using GRID • Goal: 250 fb-1 @ 250 GeV, 500 fb-1@500 GeV, Signal + SM background • StdHep (@SLAC) Sim(Mokka), reconstruction and DST maker. • DST contents: • lcio format • contains : Tracks, PFOs, [23456]-Jets,LCFIVertex, MCParticls,.. • Production profile: • Typical CPU time: ~0.5 min.(mm) to 4min.(6f) • Typical event size ( for uds-pair @ 500 GeV ) • Sim. ~950kb, Rec.~1800kb, DST ~ 23kb ILD performance are expected to be similar to GLDPrim/LDCPrim. But for consistent and complete study, new MC&DST production has been lunched with an improved software. Seminar at Tsuingha Univ., 12-Jan-2009

  25. ILD_00 MC/DST production @ last week Rough summary: ~ 23M events O(50) TB Sim/Rec. files ~ 0.5 TB DSTs so far Production continues Seminar at Tsuingha Univ., 12-Jan-2009

  26. Grid GRID for MC production more … IP2P3 DESY UK KEK • GRID provides • Huge CPU and storage resources • A way to communicate world wide • VO ILC is hosted by DESY, based on LHC Computing GRID • MC production and production are running on GRID • Simulated, Reconstructed, and DST are placed on GRID. DST: 20~50 MB x O(10k) files or more. • In Japan, • Replications of DST to KEK/Tohoku/Kobe U. sites are in progress in parallel to the production. • Resources in KEK will be increased in nearfeature. Seminar at Tsuingha Univ., 12-Jan-2009

  27. Summary • ILD has been optimized • ILD MC and DST production is in progress, for performance studies of LOI • 3rd Workshop will be held at Seoul in Feb 16-18, • LOI is due March 31. Presented at TILC09 ( 17-21, April ) • Detector TDR phase will follow. • Many physics channels are yet to be analyzed. Your participations are welcomed. Seminar at Tsuingha Univ., 12-Jan-2009

  28. Backup Slides

More Related