This presentation outlines the self-assembling agent system project, detailing its goals, requirements, and architecture. The project aims to develop independent agents capable of establishing connections and forming organizations within a simulated environment. Key components include a database for agent and organization information, a parser for gathering data, and a constructor to initiate Java Virtual Machines (JVMs) for each agent. The presentation also covers cost estimation, a software quality assurance plan, risk assessment, and an initial prototype demonstration.

1 / 16

Download Presentation

Self-assembling Agent System

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Self-assembling Agent System Presentation 1 Donald Lee

  2. Overview • Project Overview • Project Requirements • Project Plan • Cost Estimation • SQA Plan • Architecture Plan • Initial Prototype Demonstration • Risks and Unknowns • Question and Comments

  3. Project Overview • Goals • Develop a system that simulations agents to start up, establish connections between other agents in the system and create organizations between those agents. • Incorporate IPDS protocols and message parameters into the simulation. • Create a web interface for easy access and flexibility to the user to monitor and evaluate each object in the simulation.

  4. Project Overview cont. • Motivation • The need to create agents on separate JVMs (independent agents) as opposed to having everything in one application running on separate. • Evaluate and monitor agents communication and forming of organizations. • Use of database rather than XML files.

  5. Project Requirements • Database • Starting Database has been given by stakeholder. • Agent and Parser/Constructor component requires database contain agent information. • Database also contains information about organizations and list of connections. • Modifications will be made based on requirements in the next phases.

  6. Project Requirements (cont.) • Parser/Constructor • Parser • Queries the database to gather list of agents who will participate in organization. • Takes the list and identifies the type of agents that will be used in the simulation and the id of each agent. • Constructor • Takes info from parser and constructs new JVM for each agent. • Passes in the line argument, the type of agent and ID of agent.

  7. Project Requirements (cont.) • Agent • Sends a live configuration update request (database querying) to get additional information. • Construct web interface to allow users to see overview of an agent. • Start up a organization (acting as a master role). • Establish connection between other agents. • Receive/send requests to form new organizations. • Simulator • Gets list of agents from constructor. • Constructs web interface to allow users to see an overview of the entire simulation • Listens on message queues to show the messages being passed between agents and organizations.

  8. Project Plan

  9. Cost Estimation • COCOMO • Effort Applied (E) = • Development Time (D) = • Project Estimations using COCOMO • Effort Applied (E) = = 11.068 • Development Time (D) = = 6.23 Months

  10. COCOMO Cost Drivers

  11. SQA Plan • Project Management • Documentation • Standards and Practice • Reviews • Testing Requirements • Source Control, Deliverables • Risk Management

  12. Architecture Plan • Revised Vision Document • Revised Project Plan • Formal Specification for organization creation/merging and message passing. • Architecture Design • Test Plan • Technical Inspections • Executable Architecture Prototype

  13. Initial Prototype Demonstration • Parser/Constructor component queries database for list of agents. • Constructor creates new java application (JVM) for each agent. • Agent in the new java app will queries database for additional agent information. • Each JVM displays agent info via gui interface.

  14. Risks and Unknowns • Maintaining reliability in message passing between agents and organizations. • Reliability of creating a large quantity of agents on separate JVMs and initializing web interfaces for each. • Assimilating IPDS protocols/components into simulation.

  15. Question and Comments?