Strategic Integrated Resource Plan for NW NATURAL

DESCRIPTION

Understand NW NATURAL's comprehensive 30-year energy strategy, informed by linear programming models and peak-day requirements, to ensure reliable service for firm customers. Analysis includes pipeline capacity, storage development, and cost-effective demand-side solutions.

1 / 27

Download Presentation

Strategic Integrated Resource Plan for NW NATURAL

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. 2000 DRAFT INTEGRATED RESOURCE PLAN NW NATURAL November 13, 2000

  2. About NW NATURAL

  3. A Brief History of Our Company

  4. Our Approach to Integrated Resource Planning

  5. Required Plan Elements

  6. Opportunities for Participation and Comment

  7. 2000 Budget Volumes - By Customer Class

  8. Meeting Peak Day and Seasonal Gas Requirements Our #1 Commitment: • To provide reliable service to our firm customers under anticipated severe cold weather conditions We Plan for Firm Customer Needs in Advance: • Secure delivery capacity* - Ensure gas can be delivered • Purchase commodity gas - Ensure gas is available * We do not plan capacity additions to meet the needs of our interruptible customers during severe weather

  9. 30-Year Peak Requirements Forecast Comparisons Plan Date

  10. Peak Weather Degree Day Distribution

  11. Incremental Supply-Side Resource Stack • Pipeline Capacity: • “Open seasons” for capacity on the Williams Gas Pipeline occur over time with approximate 5-year intervals between open seasons. • Pipeline capacity choices require both enabling pipeline capacity (Canadian pipelines) and local infrastructure investments. • Underground storage development: • Reservoirs, injection/withdrawal wells, observation wells, injection of cushion gas and working gas inventory. • Gathering systems, gas treatment (water removal), compressors, control systems, and feeder pipelines to move gas to demand centers. • Propane / LNG (Liquefied Natural Gas) systems: • Smaller storage vessels located closer to demand centers. • LNG stored at minus 260 Fahrenheit; approximate 50,000 therms limit • Propane tank farms can be larger. Such facilities can serve a bridging role to delay the need for reinforcement of the distribution system.

  12. Illustration: Oregon Rate Components

  13. What does a Linear Programming Model Do? • Minimizes Net Present Value of gas supply cost subject to the constraint that all firm gas demands are met. • No curtailment or gas outages are allowed due to inadequate gas supply • Views conservation and supply-side resources as interchangeable over a 30-year time horizon • It finds the least cost solution by systematically comparing every possible solution • The LP model does not consider rate design, retail pricing strategies, and switching loads to interruptible service

  14. BASE-CASE LEAST COST LP SOLUTION: Peak Day Requirements

  15. Base-Case Least Cost LP Solution:Annual, Design Winter (1978-79 / 1985-86)

  16. Glossary of Linear Programming Model Resource Options

  17. Glossary of Linear Programming Model Resource Options (continued)

  18. Demand-Side Management & Conservation

  19. Load Duration Curves - Firm

  20. Principal Linear Programming Model Findings • The South Mist Pipeline Extension (SMPE) is least cost and needed as soon as possible • South Mist Pipeline Extension Supports System Flexibility • Cost-effective DSM is a small resource • Storage gas inventory requirements are now becoming a binding constraint • Interruptible curtailment may become more common

  21. What if the South Mist Pipeline Extension is Not Built?

  22. System Benefits of South Mist Pipeline Extension -- Displacement of Pipeline Deliveries • Direct service to growth in Southwest Portland • Flexibility for increased Williams Pipeline deliveries North of Molalla to Washington • Augment gas flowing South on Williams Pipeline from Molalla -- to Eugene • Augment gas flowing to the east toward Estacada

  23. Alternatives to Pipeline & Storage Development are Inadequate

  24. Conclusions • Underground storage best meets peak-day requirements and annual working gas requirements • South Mist Pipeline Extension is needed and is clearly the least-cost resource to serve Oregon and Washington Customers • Current Interstate Pipeline capacity may be adequate but opportunities for strategic acquisitions will be evaluated • NWN does not plan to launch any new major DSM initiatives but will continue to support energy efficiency • There are no effective alternatives to additional supply capability

  25. Conclusions (continued)