An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. SC-214/WG-78 SG-3SG3 Progress and Plans Plenary 6: 8 – 12 December 2008Toulouse, France

  2. SG-3 Scope (ATN & FANS1/A+) DO-280B/ED-110B ATN Baseline 1 Continental Services DO-258A/ED-100A FANS 1/A+ Continental and Oceanic Services DO/ED-YYY ATN Advanced Continental & Oceanic Services Air INTEROP Req. ED-110B ED-100A DO/ED-YYY ATN INTEROP Ground INTEROP Req. ED-154 DO-305 ED-110B ED-100A DO/ED-YYY FANS INTEROP DO/ED-YYY DO - 280 / ED - 110 FANS 1 / A + ATN Advanced ATN Baseline 1 Oceanic Services Continental & Continental Services Oceanic Services

  3. SG-3 Status Documents and Authors ATN Interop (v0.12) - Frederic Picard D-OTIS – Marty Glatz FANS Interop (v0.6) – Chris Collings PM FIS (v1.0) – Greg Saccone P/OICS (v0.7) – Bruce Eckstein Meetings Attended joint meeting with SG-1 and SG-2 in Melbourne 10/20-10/24 Held telecon 11/10-11/14 Plenary #6 preparation telecon 12/1

  4. SG-3 Plans During Plenary #6 Current Week 12/9 ATN Interop Review Incorporate comments Joint session with DCL and D-TAXI editors P/OICS review 12/10 FANS Interop Review Incorporate comments Review chapter 5 12/12 Begin incorporating updates from plenary #6

  5. SG-3 Plans following Plenary #6 Path to Mature Draft Interop Documents Issue ATN and FANS Interop End December aligned with OSD output Plenary #6 Formal Comment Period January/February 09 Issue Version 1.0 of each document Plenary #7 March 09 Validation Period : March – September 09 PM-FIS Validation of PM-FIS specification required (Jan to Mar 09) Liaison with ICAO for inclusion of PM-FIS in Doc 9880 P/OICS Complete at parameter level