1 / 5

ITRS - YE ITWG Meeting in Maastricht April 6-7, 2006

ITRS - YE ITWG Meeting in Maastricht April 6-7, 2006. Lothar Pfitzner, ++49 9131 761 110, lothar.pfitzner@iisb.fraunhofer.de Andreas Nutsch, ++49 9131 761 115, andreas.nutsch@iisb.fraunhofer.de. Maastricht 2006 YE ITWG Meeting Participants. 12 Participants (Europe, Japan, USA)

trish
Download Presentation

ITRS - YE ITWG Meeting in Maastricht April 6-7, 2006

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. ITRS - YE ITWG Meeting in Maastricht April 6-7, 2006 Lothar Pfitzner, ++49 9131 761 110, lothar.pfitzner@iisb.fraunhofer.de Andreas Nutsch, ++49 9131 761 115, andreas.nutsch@iisb.fraunhofer.de

  2. Maastricht 2006 YE ITWG Meeting Participants • 12 Participants (Europe, Japan, USA) • Lothar Pfitzner (Fraunhofer IISB) • Ines Thurner (Infineon) • Dilip Patel (ISMI) • Sumio Kuwabara (NEC) • Andreas Nutsch (Fraunhofer IISB) • Andreas Neuber (MW Zander) • Dieter Rathei (D R Yield) • Dirk de Vries (Philips) • Chris Muller (Purafil) • Francois Finck (ST) • Allyson Hartzell (Exponent) • Dave Roberts (Air Products)

  3. YE TWG • Topics • DDC: update the tables • DDC: remark that metrology tools need to be available for technology development 18 to 24 months before each technology generation ius actually introduced • YMDB: Defect budget survey will be done in Japan, the data will be supplied to ITRS, if other regions participate • YMDB: The defect size distribution will be kept on scaling with 1/x³. Remark: it might be possible for smaller defect size the defect numbers might increase significantly stronger, because effects e.g. nucleation are expected

  4. Cross TWG • Cross TWG • Lithography • ESH • FEP • Interconnect • Factory Integration • Test • Topics • Lithography: For immersion lithography: Is there a need for a new method for defect inspection? Is a specific defect specification required? – Answer: no additional specs. Follow up: exchange on information on sensitivity etc. (requirements on defect detection) • FEP: Yield model in ITRS: requires input from Fabs  requires further discussion • FEP: Defect budgets: still no new survey available • TEST: Common coordinate system neccessary

  5. Cross TWG • Cross TWGs of WECC • Litho: Further improve definition of interfaces and parameters • Factory integration (FI): Further clarification of interfaces • Front end processing (FEP): Follow-up on AMC and CVD/ALD precursor specifications • Assembly and Packaging: Second contact with regard to new requirements • ESH: Yield modelling for impact analysis will be difficult due to potential reliability issues, further coordination on CVD/ALD precursor material screening and yield impact analysis of recycling

More Related