slide1 l.
Download
Skip this Video
Loading SlideShow in 5 Seconds..
Joint Concept Steering Group 24-25 August 2005 PowerPoint Presentation
Download Presentation
Joint Concept Steering Group 24-25 August 2005

Loading in 2 Seconds...

play fullscreen
1 / 16

Joint Concept Steering Group 24-25 August 2005 - PowerPoint PPT Presentation


  • 166 Views
  • Uploaded on

Joint Concept Steering Group 24-25 August 2005. UNCLASSIFIED. Joint Operations Concepts . Colonel Ed Yarnell Joint Staff J7 24 & 25 Aug 2005. UNCLASSIFIED. Outline. Review Previous JCSG actions Provide Status on Joint Operations Concepts (JOpsC) Family Discuss Improvement Efforts

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about 'Joint Concept Steering Group 24-25 August 2005' - trinh


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
joint operations concepts

UNCLASSIFIED

Joint Operations Concepts

Colonel Ed Yarnell

Joint Staff J7

24 & 25 Aug 2005

UNCLASSIFIED

outline
Outline
  • Review Previous JCSG actions
  • Provide Status on Joint Operations Concepts (JOpsC) Family
  • Discuss Improvement Efforts
  • Discuss Way Ahead
slide4

May 05 JCSG AAR

·C2 JIC as a prototype for the new standardized CBA process when defined. C2 JIC completing final approval process. CBA TOR and joint experimentation application to JICs require further standardization

·JS J7 and JFCOM J9 will provide a better definition of Joint Experimentation as it relates to future concept development. C-Plan/3010

·3 yr review cycle for concepts in CJCSI 3010.02B to support future Strategic Guidance. 3010

·JS J7 and J8 will resolve the requirements for Concepts entry into JCIDS and use of DPS scenarios in JICs. 3010

·JCSG Stakeholders will review CJCSI 3010.02B Appendix C forwarded sepcor and provide feedback to the writing team. Completed and incorporated in 3010 draft.

slide5

May 05 JCSG AAR

·The Joint Concept community will write non-directed Joint CONOPS and submit them for a Decision Point. The Decision Point, if they are deemed to have merit for further analysis and potentially CBA, there will be direction for the writer to go back and add the additional analysis, context, and fidelity required. Agenda item for current JCSG

·JS J7 and J8 will synchronize CJCSIs 3170 and 3010. 3010 and current FCB process improvement effort.

·JS J7 will provide a format to capture the costs and resources required for concept development in CJCSI 3010.02B. Did not incorporate format but will be captured in lessons learned from authors. See 3010 responsibilities.

·JS J7 will host / sponsor future quarterly JCSG meetings. Next meeting is 15 & 16 Nov

·JS J7 will provide website link information in CJCSI 3010 to Executive Summaries of all of the family of Joint Concepts. Posted

topic
Topic
  • Review Previous JCSG actions
  • Provide Status on Joint Operations Concepts (JOpsC) Family
  • Discuss Improvement Efforts
  • Discuss Way Ahead
jopsc family
JOpsC Family

Capstone Concept for Joint Operations (CCJO)

Operational Context

JOCs

Joint Functional Concepts

Joint Functional Concepts

Joint Functional Concepts

JFCs

1. Homeland Security

2. Strategic Deterrence

3. Major Combat Operations

4. Stability Operations

Support

1. Battlespace Awareness 7. Force Management

2. Command and Control 8. Training

3. Force Application

4. Focused Logistics

5. Force Protection

6. Net-Centric Ops

JICs

5. Seabasing 9. Persistent ISR

6. Joint Command and Control

7. Joint Logistics

8. Net Centric Operating Environment

1. Global Strike

2. Joint Forcible Entry Operations

3. Joint Undersea Superiority

4. Integrated Air & Missile Defense

ccjo v 2 0 aug 2005
CCJO – v. 2.0 Aug 2005

Problem

Central Idea

Joint

Interagency

Joint

Multinational

Knowledge Empowered

Networked

Interoperable

Expeditionary

Adaptable / Tailorable

Enduring/Persistent

Precise

Fast

Resilient

Agile

Lethal

Informed by Strategy

JFC

Unified

Action

FSD

  • Systems view
  • Fundamental actions
  • How to operate
capabilities based assessment cba status on jics
Capabilities Based Assessment (CBA) Status on JICs

4Q04

Jul-Sep

1Q05

Oct-Dec

2Q05

Jan-Mar

3Q05

Apr-Jun

4Q05

Jul-Sep

1Q06

Oct-Dec

2Q06

Jan-Mar

3Q06

Apr-Jun

4Q06

Jul-Sep

1Q07

Oct-Dec

2Q07

Jan-Mar

JFEO

FNA

JROCM

JCB

25 Feb

FNA

FSA

JUSS

JCB

16 Feb

IAMD

JIC

FAA

FNA

FSA

TANK

10 Dec

FNA

Global

Strike

FAA

FNA

FSA

JIC

TANK

10 Jan

Final 05

FAA = Functional Area Analysis

FNA = Functional Needs Analysis

FSA = Functional Solutions Analysis

Today

JIC

Seabasing

FAA/FNA/FSA

Initial 06

JIC

Joint Logistics

FAA/FNA/FSA

JIC

FAA/FNA/FSA

Joint C2

JIC

FAA/FNA/FSA

NCOE

JIC

FAA/FNA/FSA

Persistent ISR

topic10
Topic
  • Review Previous JCSG actions
  • Provide Status on Joint Operations Concepts (JOpsC) Family
  • Discuss Improvement Efforts
  • Discuss Way Ahead
concepts to capabilities
Concepts to Capabilities
  • Near-Term focus (FYDP)
  • Address extant problems
  • Urgency to obtain capabilities
  • Adjust current/next POM
  • Influence & inform
  • development of future
  • concepts and new capabilities
  • Longer-Term focus (beyond FYDP)
  • Forecasts how to operate in a
  • future environment
  • Less urgent - more time to examine
  • future capability requirements
  • Influence future POMs
  • Influence & inform
  • current CONOPS and capability
  • development

Near-Term

CONOPS

JOpsC

Family

fcb links to concept development experimentation cde
FCB links to Concept Development Experimentation (CDE)

Venues/Activities

Joint Command - Future

Co-Sponsored Events

Limited Objective Experiments

Senior Leader Seminars

COCOM Exercises

FCBs

Force Application

Focused Logistics

Protection

Battlespace Awareness

Command & Control

Network Centric Ops

Training

Force Management

CCJO

&

JOCs

ROADMAPS

JE CPlan

PROTOTYPES

JFCs

FUTURE

Capability

Requirements

ACTDs

JCA

HOW?

Joint Concept Steering Group (JCSG)

&

Joint CDE

Executive Council

  • Experimentation is needed to:
  • Develop prototype solutions for current needs
  • Develop solutions for future needs
  • Help assess Concepts
  • During Experimentation, FCBs:
  • Participate in defining proposed solutions
  • Participate in process and outcomes
  • Experimentation output:
  • Actionable Recommendations
  • DOTMLPF Change Requests
  • Prototypes
  • Recommendations for Concept revisions
joint concept community collaboration
Joint Concept Community Collaboration

Joint Concept

Steering Group

O6 level

Meet

Quarterly

Joint Concept

Executive Council

GO/FO level

Meet as

Needed

JCSG

DISCUSSION

ITEM

JROC/JCS

slide14

Persistent ISR JIC

MILITARY PROBLEM

SCOPE

US ISR force structure must be able to provide an affordable, flexible and focusable ISR capability that is able to support the full range of military operations. The ability to gather, fuse, and understand multi-INT, multi-domain information to derive long term knowledge of adversary capability, status and intent; to provide persistent, deep look, multi-aspect surveillance enabling prosecution of time critical targets across all mediums; and to track and identify surface moving targets is critical to Warfighter success.

TBD

SCOPING ISSUE WILL BE DISCUSSED

DURING AUG 05 JCSG

SAMPLE

JUSTIFICATION

PROPOSED TIMELINE

  • COCOMs Future IPL Priority
  • USD (I) Integrated ISR Roadmap
  • OSD (PA&E) ISR Crosscutting Study
  • JOpsC Capabilities
    • -IAMD, GS, JC2, NCOE JICs
  • JROCM 068-05 (Apr 05) directs ISR CBA
  • IED Defeat CONOPS & UAV Tiger Team
  • OA-05 Study (Time Sensitive Targeting)
  • JS J8 supports funding CBA

JIC OPR: STRATCOM

CBA OPR: BA FCB

CONOPs: STRATCOM Complete Sep 05

JIC: Begin Oct 05 Complete Feb 06

JCS IPR: Oct / Nov 05

Wargame: Conducted during CBA

CBA: FAA Feb – Apr 06

FNA May – Jul 06

FSA Aug – Oct 06

topic15
Topic
  • Review Previous JCSG actions
  • Provide Status on Joint Operations Concepts (JOpsC) Family
  • Discuss Improvement Efforts
  • Discuss Way Ahead
way ahead
Way Ahead
  • Revise JOCs & Complete Current Concepts
    • CCJO approved by CJCS: Aug 05
    • JOC revisions: Jun 05–Jun 06
    • Complete four JICs (Joint Logistics, C2, NCOE, P-ISR): Sep–Dec 05
    • Complete Training JFC: Dec 05
  • Development of Additional JOpsC family
    • CJCSI 3010: Sep 05
    • JCSG Charter
    • JOpsC nomination criteria & development approval process
    • Execute nomination process @ Nov JCSG