Mode Opératoire Culée C0. Phase 1: Exécution du béton de propreté. Mode Opératoire Culée C0. Phase 2: Réalisation de la semelle. Mode Opératoire Culée C0. Phase 3: Réalisation du mur de front C0. Mode Opératoire Culée C0. Phase 4: Chevêtre C0. Mode Opératoire Culée C0.

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about '' - trey


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
Mode op ratoire cul e c0
Mode Opératoire Culée C0

  • Phase 1: Exécution du béton de propreté


Mode op ratoire cul e c01
Mode Opératoire Culée C0

  • Phase 2: Réalisation de la semelle


Mode op ratoire cul e c02
Mode Opératoire Culée C0

  • Phase 3: Réalisation du mur de front C0


Mode op ratoire cul e c03
Mode Opératoire Culée C0

  • Phase 4: Chevêtre C0


Mode op ratoire cul e c04
Mode Opératoire Culée C0

  • Phase 5: Garde-grève + Plancher de couverture


Mode op ratoire cul e c05
Mode Opératoire Culée C0

Inutile si mur en retour coulé après garde grève

  • Phase 6: Mur en retour C0

Coffrage intérieur épousant la forme du mur en retour

Gabarit inséré dans le coffrage


Mode op ratoire cul e c06
Mode Opératoire Culée C0

  • Ouvrage terminé