Position of the 3rd Harmonic System
Position of the 3rd Harmonic System. T. Limberg. Injector (with first Bunch Compression Stage). Injector Hall. XTIN: Length = 48m, accommodates Gun, ACC1, 3,9GHz, Laser Heater, Diagnostics, Dump Line. XSE: Length = 22.55m, accommodates Shielding, Dogleg. Start Linac Tunnel. Dogleg.
260 views • 14 slides