1 / 2

Shipper A

Shipper C New 50 MDth/d Firm Load. Shipper A. Shipper B. MDO = 100 MDth/d CMQ = 80 MDth/d. MDO = 200 MDth/d CMQ = 50 MDth/d. Lateral capacity = 300 MDth/d. Given: Shipper A and Shipper B CMQ and MDO’s as stated above (no other shippers on lateral)

tocho
Download Presentation

Shipper A

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Shipper C New 50 MDth/d Firm Load Shipper A Shipper B MDO = 100 MDth/d CMQ = 80 MDth/d MDO = 200 MDth/d CMQ = 50 MDth/d Lateral capacity = 300 MDth/d • Given: • Shipper A and Shipper B CMQ and MDO’s as stated above (no other shippers on lateral) • New Shipper C requesting firm 50 MDth/d load at a new delivery adjacent to Shipper A and Shipper B delivery points • Total of Shipper A and Shipper B MDO’s equal to lateral capacity • Determine: • Shipper A and Shipper B MDO reductions to accommodate new Shipper C firm transportation request of 50 MDth/d • Methodology: • Determine total MDO in excess of total CMQ. • Excess MDO Shipper A = (100-80) MDth/d = 20 MDth/d; Excess MDO Shipper B = (200-50) MDth/d = 150 MDth/d • Total Excess MDO Shipper A + Shipper B = (20+150) = 170 MDth/d • Determine total MDO available after 50 MDth/d firm transportation request. • MDO Available after request = Total Excess MDO – Firm Transportation Request = (170-50) MDth/d = 120 MDth/d • Determine allocation of remaining MDO to Shipper A and Shipper B based on pro-rata CMQ • Shipper A allocation of MDO in excess of CMQ = (CMQ Shipper A/Total CMQ)*Available MDO = (80/(80+50))*120 = 74 MDth/d • Shipper B allocation of MDO in excess of CMQ = (CMQ Shipper B/Total CMQ)*Available MDO = (50/(80+50))*120 = 46 MDth/d • Determine new MDO’s for Shipper A and Shipper B (subject to the limitation that new MDO cannot exceed original MDO) • New Shipper A MDO = CMQ+Shipper A allocation of MDO = (80+74) MDth/d = 154 MDth/d. New MDO cannot be greater than existing MDO, implying new MDO Shipper A = 100 MDth/d (unchanged). • Therefore all MDO reductions will come from Shipper B. NewShipper B MDO = (200-50) MDth/d = 150 MDth/d

  2. Shipper C New 50 MDth/d Firm Load Shipper A Shipper B MDO = 100 MDth/d CMQ = 80 MDth/d MDO = 200 MDth/d CMQ = 150 MDth/d Lateral capacity = 300 MDth/d • Given: • Shipper A and Shipper B CMQ and MDO’s as stated above (no other shippers on lateral) • New Shipper C requesting firm 50 MDth/d load at a new delivery adjacent to Shipper A and Shipper B delivery points • Total of Shipper A and Shipper B MDO’s equal to lateral capacity • Determine: • Shipper A and Shipper B MDO reductions to accommodate new Shipper C firm transportation request of 50 MDth/d • Methodology: • Determine total MDO in excess of total CMQ. • Excess MDO Shipper A = (100-80) MDth/d = 20 MDth/d; Excess MDO Shipper B = (200-150) MDth/d = 50 MDth/d • Total Excess MDO Shipper A + Shipper B = (20+50) = 70 MDth/d • Determine total MDO available after 50 MDth/d firm transportation request. • MDO Available after request = Total Excess MDO – Firm Transportation Request = (70-50) MDth/d = 20 MDth/d • Determine allocation of remaining MDO to Shipper A and Shipper B based on pro-rata CMQ • Shipper A allocation of MDO in excess of CMQ = (CMQ Shipper A/Total CMQ)*Available MDO = (80/(80+150))*20 = 7 MDth/d • Shipper B allocation of MDO in excess of CMQ = (CMQ Shipper B/Total CMQ)*Available MDO = (150/(80+150))*20 = 13 MDth/d • Determine new MDO’s for Shipper A and Shipper B • New Shipper A MDO = CMQ+Shipper A allocation of MDO = (80+7) MDth/d = 87 MDth/d. • NewShipper B MDO = CMQ+Shipper B allocation of MDO = (150+13) MDth/d = 163 MDth/d

More Related