60 likes | 218 Views
The latest update on the FAIR construction site in Darmstadt highlights the progress in key areas such as nuclear structure and astrophysics research. This facility is designed for advanced experiments involving rare-isotope beams, hadron physics, and ultra-high electromagnetic fields. The construction comprises multiple modules, including SIS18 and SIS100, and aims to enhance our understanding of fundamental symmetries and high-energy particle interactions. Despite the complexities of the project, piling works are ahead of schedule, with an anticipated completion before Q3 2014.
E N D
ConstructionSite – current Google Maps View Construction Site today Short Status of FAIR for NuPECC /KP 4
FAIR @ Darmstadt Construction in Modules Nuclear Structure & Astrophysics (Rare-isotope beams) Hadron Physics (Stored andcooled 14 GeV/c anti-protons) SIS18 p-Linac SIS100/300 UNILAC QCD-Phase Diagram (HI beams 2 to 45 GeV/u) HESR Rare-Isotope Production Target Fundamental Symmetries & Ultra-High EM Fields (Antiprotons & highly stripped ions) Module 0: SIS100 andconnection toexistingaccelerators Anti-Proton Production Target Module 1: Experimental areas Dense Bulk Plasmas (Ion-beam bunchcompression & petawatt-laser) CR &RESR Cryring Module 2: Super-FRS NESR Materials Science & Radiation Biology (Ion & antiproton beams) 100 m Accelerator Physics Module 3: High-energyp(p-linac, p, CR,HESR) Short Status of FAIR for NuPECC /KP
FAIR Experiments in all 4 scientificcoreactivities CBM APPA Super-FRS PANDA NuSTAR Short Status of FAIR for NuPECC /KP
Planning Activities Short Status of FAIR for NuPECC /KP
Civil Engineering New Beamline: ∑ 3.2 km thereof Syncrotron: 1.1 km Existing:SIS 18 600.000 cbm > 1 Miotonsofconcrete 35.000 tonsofsteel Short Status of FAIR for NuPECC /KP
status of piling works • piling todate: • wellaheadofschedule • goal: finishedbeforeQ III/2014 Klaus Peters - Exotics at PANDA Short Status of FAIR for NuPECC /KP