An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Preliminary summary of the LHC scrubbing run in LBOC, 11/12/2012 G. Arduini, H. Bartosik, G. Iadarola, G. Rumolo Thanks to the machine Coordinators, Cryogenics, Damper, EN/STI, Injection, Operation, Vacuum teams, ABP, RF and BI colleagues contributing to measurements

  2. Aims of the 2012 scrubbing run • Further reduce the SEY over the whole machine • Use a 25ns beam at 450 GeV, monitoring electron cloud observables and beam quality evolution • Eventually ramp to 4TeV up to a few hundreds of bunches (for beam-beam, e-cloud, and UFO studies and for 25ns pilot run and additional scrubbing!) • Collect additional information on the evolution on the SEY as a function of the accumulated electron dose (especially in the low SEY region) and compare machine data with existing models • Essential to validate models and establish strategies for the post-LS1 era • In parallel, learn about other possible differences in 25ns vs. 50ns operation (concerning heating, stability, UFOs)

  3. Scrubbing Overview Fills 3389  3407 IB1 IB2 TDI outgassing, Cryo-regulation MSR8+cycle Cryo-regulation MSR8+cycle Investigations on blow-up Investigations on blow-up+POPS ALICE UFO Cryo-regulation MSR8+cycle Inj. setting-up Damper setting-up Fast intensity ramp-up and overall excellent machine availability Beam under control (damper, chromaticity, octupoles) in spite of the record intensities (up to 2.7x1014 p, 2748 bunches per beam)

  4. Heat load evolution • The heat load on the beam screens was used on line for estimating the efficiency of the scrubbing process Heat load in sector 56 Thanks to L. Tavian

  5. Main limitations • Smooth run, no fundamental showstopper was foundGood scrubbing dose was maintained all along the scrubbing period. • The overall efficiency was determined by: • Vacuum pressure in the MKI region (during the initial stages): • The interlock levels were gradually increased (tanks: 2∙10-9mbar 4∙10-9mbar, interconnects: 1∙10-8mbar 4∙10-8mbar) • Cryogenics(with higher intensities): • Limited cooling power at stand alones in P6 and 8 required about 10’ between successive injections • Try to dump the beams in conditions of lower heat load (to avoid strong fluctuations on 120A current lead temperature  precycle needed)

  6. Other limitations • Vacuum pressures along the ring were continuously monitored by the vacuum team • Apart from MKIs and shortly ATLAS during the first night, no significant slow down coming from pressure rises Thanks to TE-VSC and EN-STI

  7. Other limitations • Vacuum pressures along the ring were continuously monitored by the vacuum team • Apart from MKIs and shortly ATLAS during the first night, no significant slow down coming from pressure rises • TDIs had to be opened after each injection in order to keep heating and outgassing under control. A. Lechner Pressure runaway that triggered a manual dump

  8. Other limitations • Vacuum pressures along the ring were continuously monitored by the vacuum team • Apart from MKIs and shortly ATLAS during the first night, no significant slow down coming from pressure rises • TDIs had to be opened after each injection in order to keep heating and outgassing under control. A. Lechner

  9. Other limitations • Vacuum pressures along the ring were continuously monitored by the vacuum team • Apart from MKIs and shortly ATLAS during the first night, no significant slow down coming from pressure rises • TDIs had to be opened after each injection in order to keep heating and outgassing under control. • On 10/12 – last night of scrubbing – one jaw of the TDI in point 8 got stuck in open position (twice)  The EN/STI piquet could remotely reset the motor • LVDT reading of TDI.4L2 LU might trigger a warning/error, on the *LOWER* limit due to drift while cooling down. Access ongoing, exchange of one of LVDTs Thanks to TE-VSC and EN-STI

  10. Other limitations • Vacuum pressures along the ring were continuously monitored by the vacuum team • Apart from MKIs and shortly ATLAS during the first night, no significant slow down coming from pressure rises • TDIs had to be opened after each injection in order to keep heating and outgassing under control. • On 10/12 – last night of scrubbing – one jaw of the TDI in point 8 got stuck in open position (twice)  The EN/STI piquet could remotely reset the motor • LVDT reading of TDI.4L2 LU might trigger a warning/error, on the *LOWER* limit due to drift while cooling down. Access ongoing, exchange of one of LVDTs • No anomalous heating was observed on other sensitive elements(e.g. collimators) (larger bunch lengths and smaller bunch intensities) Thanks to TE-VSC and EN-STI

  11. Beam quality evolution • Initially: • Transverse instability leading to beam dump • Injecting a single train of 72 bunches with chroma set to 2 • Injecting trains of 216 and 288 bunches, even with chroma set to 15! Thanks to R. De Maria, W. Höfle, D. Valuch During injection set up

  12. Beam quality evolution • Initially: • Transverse instability leading to beam dump • Injecting a single train of 72 bunches with chroma set to 2 • Injecting trains of 216 and 288 bunches, even with chroma set to 15! • Poor lifetime, however exhibiting signs of improvement even within the same fill Q’ ~ 15 Q’ ~ 7 Beam 1 Fill 3389 Train spacing 3.7 ms  1 ms Trains with 72  288 bunches Q’ ~ 15 Q’ ~ 7 Beam 2

  13. Beam quality evolution Bunch by bunch lifetime strongly improved within the first scrubbing fill (Fill 3389). Filling scheme with minimum possible batch spacing and maximum number of bunches was employed for the following fills. Between Friday Dec. 7th and Sunday Dec. 9th there were 10 scrubbing fills with more than 2000b. per beam.

  14. Beam quality evolution Beam lifetime (CCC monitoring) Thursday 6 Dec Sunday 9 Dec

  15. Beam quality evolution Beam lifetime – Fill 3390 Beam 1 Beam 2

  16. Beam quality evolution Beam lifetime – Fill 3390 Beam 1 Beam 2

  17. Beam quality evolution Beam lifetime – Fill 3398 Beam 1 Beam 2

  18. Beam quality evolution Beam lifetime – Fill 3398 Beam 1 Beam 2

  19. Beam quality evolution Beam lifetime – Fill 3405 Beam 1 Beam 2

  20. Beam quality evolution Beam lifetime – Fill 3405 Beam 1 Beam 2

  21. Beam quality evolution Summary of lifetimes Scrubbing Scrubbing Studies

  22. Miscellaneous • Important transverse emittance blow up • Affecting only some bunches of the first injected train • Seen with BSRT, confirmed with WS, both planes • Effect suppressed by increasing the octupole strength from -0.5 to -2.0 Octupole setting -0.5 Octupole setting -2.0

  23. Preliminary considerations • 3.5 days of scrubbing with 25ns beams at 450GeV were carried out with high heat load (i.e. electron) rate • e-cloud effects on the beam were visibly mitigated but not suppressedyet (seemingly confirmed by both heat load and beam lifetime measurements) • Important information on the SEY evolution vs. electron dose collected for validation/improvement of our models and for enabling us to extrapolate to post-LS1 operation • More data analysis (including transverse emittances from BSRT and stable phase shift) and interpretation ongoing + more information/additional scrubbing expected from MDs with ramps to 4 TeV

  24. Thanks for your attention!