An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Proposed Warrant Article Regarding Improvement Dredging in the ACEC

  2. Improvement dredging prohibited in ACEC Concerns about access heightened by 2007 inlet formation ‘08 RMP Update: examine need, impacts & regulatory issues Background report: results of 2 years of study & basis for recommendation

  3. Evidence of Need: -Hydrographic survey: channels passable but some areas worsened by lower low tides -Inlet configuration study: southerly migration & continued dynamic change in the area around the inlet -Allowed us to Identify area of greatest potential change within ACEC

  4. Area of potential improvement dredging follows traditional channels Limited to area that is most likely to be directly affected by inlet dynamics

  5. Resource Impacts Shellfish Resources: assessment during environmental permitting

  6. Resource Impacts Eelgrass Resources - assessment during environmental permitting

  7. Regulatory Issues • 3 areas of state regulation: • Chapter 91 prohibition • Wetlands Protection Act review • Water quality certification • Best options: • Variance from state regulations • Change in state regulations • Either requires RMP amendment

  8. RMP Amendment • Identify conditions under which permit could be sought: • Municipality/public purpose • Within designated zone • Maintain/restore historic navigation access • Minimum dredging necessary to maintain access • Amendment clears pathway (not a proposal) • All environmental reviews still needed

  9. Process • Outreach meetings • Seeking TM approval in all four towns • Seeking Selectmen endorsement of the TM warrant article