Gas Material Balance

Gas Material Balance. Outline:. Volumetric depletion reservoir. Water drive mechanism. Burns et al method. Gas material balance exercise. Volumetric depletion reservoir.

tass
Download Presentation

Gas Material Balance

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Gas Material Balance

  2. Outline: • Volumetric depletion reservoir. • Water drive mechanism. • Burns et al method. • Gas material balance exercise.

  3. Volumetric depletion reservoir • The term volumetric depletion reservoir applies to the performance of a gas reservoir in which water influx due to pressure decline is insignificant. • Volume of the hydrocarbon remains constant and can be calculated by the following equation. • As the pressure decline from the initial reservoir pressure for a given volume of production Gp material balance equations can be written. Fundamentals of Reservoir Engineering, L.P. Dake , Shell Learning and Development

  4. Volumetric depletion reservoir Fundamentals of Reservoir Engineering, L.P. Dake , Shell Learning and Development

  5. Volumetric depletion reservoir • The assumption that hydrocarbon pore volume is constant is problematic. • Connate water saturation expansion. • Grain pressure increases due to fluid pressure reduction. Fundamentals of Reservoir Engineering, L.P. Dake , Shell Learning and Development

  6. Volumetric depletion reservoir Fundamentals of Reservoir Engineering, L.P. Dake , Shell Learning and Development

  7. Volumetric depletion reservoir Fundamentals of Reservoir Engineering, L.P. Dake , Shell Learning and Development

  8. Water drive reservoir • If the reduction in reservoir pressure leads to water influx into the reservoir material balance equation is modified. Fundamentals of Reservoir Engineering, L.P. Dake , Shell Learning and Development

  9. Water drive reservoir • is the fraction of the hydrocarbon which is flooded by the water. • The effect of water influx is to maintain the pressure. • Material balance equation for water drive mechanism in gas reservoir is a non linear equation. • A mathematical model needs to be defined to interpret history matching and prediction. • Aquifer fitting. • If the aquifer is the same size of reservoir then a simple mathematical model can be applied. Fundamentals of Reservoir Engineering, L.P. Dake , Shell Learning and Development

  10. Water drive reservoir • If the production history of the reservoir is available Burns et al proposed the following method. • Step1: Depletion material balance ( apparent gas in place). • Step 2: corrected value of the gas in place can be calculated by the following formula: Fundamentals of Reservoir Engineering, L.P. Dake , Shell Learning and Development

  11. Water drive reservoir Fundamentals of Reservoir Engineering, L.P. Dake , Shell Learning and Development

  12. Exercise: Fundamentals of Reservoir Engineering, L.P. Dake , Shell Learning and Development

  13. Exercise: Fundamentals of Reservoir Engineering, L.P. Dake , Shell Learning and Development

  14. Solution: • GIIP: Fundamentals of Reservoir Engineering, L.P. Dake , Shell Learning and Development

  15. Solution: • Pressure at GWC: • Temperature at GWC: • Z factor: 0.888 • Gas formation factor at GWC: • Gas pressure gradient: Fundamentals of Reservoir Engineering, L.P. Dake , Shell Learning and Development

  16. Solution: • Gas pressure at centroid: • Temperature at centroid: • GIIP: Fundamentals of Reservoir Engineering, L.P. Dake , Shell Learning and Development

  17. Solution: Fundamentals of Reservoir Engineering, L.P. Dake , Shell Learning and Development

  18. Solution: • Step1: calculate cumulative gas production until the pressure reduced to 1200 psi. When P=1200 psi, Z=0.832. • Step2: cumulative gas production in the build up period: Fundamentals of Reservoir Engineering, L.P. Dake , Shell Learning and Development

  19. Solution: • Step3: Cumulative gas production in plateau period: • Step4:Time in which reservoir can produce at the rate of 100 MMscf/d: Fundamentals of Reservoir Engineering, L.P. Dake , Shell Learning and Development

  20. Solution: Fundamentals of Reservoir Engineering, L.P. Dake , Shell Learning and Development

  21. Solution: Fundamentals of Reservoir Engineering, L.P. Dake , Shell Learning and Development