IHEP FAIR in kind Contributions. Peter Spiller 15.1.2008. The overall general machine layout has been completed and is fixed The detailled technical design (production readiness) of the components has not been completed (specifications: partly functional and partly detailled)

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about 'Peter Spiller 15.1.2008' - taryn


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
slide1

IHEP FAIR in kind Contributions

Peter Spiller

15.1.2008

slide2

The overall general machine layout has been completed and is fixed

  • The detailled technical design (production readiness)

of the components has not been completed

  • (specifications: partly functional and partly detailled)
  • In a cold machine all components have to be planned as a whole
  • (in contrary to a warm machine) > The cryomagnetic system
  • (85 % of the circumference)
  • Next step is to finalize the technical design in detail by a consortium, joint

venture or similar of those who expressed their interest

slide3

The present work package structure of the cryomagnetic system (dipoles,

quadruples, etc.) may be one option but may not be the most appropriate to the

technical capabilities and wishes of all partners

  • An alternative work sharing structure of the cryomagnetic system

should be considered among the potential partners, those who have expressed an

interest in the components

slide4

There are many components identical and used in several machines

(number of components to be produced):

e.g.

Rf acceleration cavities : SIS100, SIS300, NESR

Cold BPMs: SIS100, SIS300

S.C. Magnets: SIS300, HEBT

Beam diagnostics:

e.g. Residual Gas Profile Monitor: SIS100.SIS300. CR, RESR, NESR

slide5

Global machine drawings at GSI (Mutual interactions of machines,

Interface to civil construction, Integration of components etc.)

  • Integration of each component design continously needs to be checked during the

design process and especially before production start

  • The active partners in consortia in the pre-production

(component design finalization) phase

may be different to the production phase

slide6

In order to assure maintenance, service and reliability (fast repair in case of fail funtcions) a number of parts for technical components must be purchased centrally for the inkind responsibles e.g. interfaces to a common control system, cryogenic valves, UHV pumps, interfaces to media supply

Table has to be generated and approved