70 likes | 188 Views
This agenda focuses on revisiting the pedagogical frameworks of GRE and Campex to strengthen the rigor of delivery. Key discussions will include user testing outcomes, target versus performance measurements for various milestones, and updates on material boxes. The aim is to integrate feedback for continuous improvement, particularly in critical and smart reading as well as mathematics instruction. It is imperative that all team members are prepared to contribute, and Shivku will lead the discussion in the upcoming PLT meeting. Action items and timeline updates are crucial to ensure effective implementation.
E N D
Agenda • Pedagogy Rigor • Target v/s Performance (minutes measurement) • Changes • User Testing & Operation Khoj • Material box update
Pedagogy rigour SLIDE SEGMENT - ITITLE - PEDAGOGY RIGOURRESPONSIBILTY - SHIVKU (AND DEEPAK)BY - 16th MarchI think we need to revisit the pedagogy of GRE and Campex and see what else can be added to strengthen rigour of the delivery. Though all of us will come in prepared, Shivku, i would expect you to drive the discussion in the PLT meeting. Pls send in a few slides to Deepak on this. Deepak, integrate this into your Agenda File.
Target v/s Performance (Minutes measurement) • March 20th : Target Performance • RC 5 MILEs 4 MILEs by 22nd • Vocab 6 MILEs 7 MILEs by 25th • AWA 2 MILEs 2 MILEs by 20th • Quant 7 MILEs 6 MILEs by 22nd • Counseling Wrap-up Open • Note: Dates given in the update column are ‘Ready for CRC’ dates. • Post production band width is completely clogged by AIEEE.
Changes • RC restructured • GRE: 2 Critical reading, 2 Smart reading, 1 Crack RC • PIN: 2 Critical reading, 2 Speed reading, 1 Crack RC • 1 extra RC MILE in GRE.- Instead of 4 RC MILEs planned • AWA MILE maker – Pranav • GRE – Quant - Arithmetic has been divided into 2 MILEs - 1 & 2 • PIN C2 – Vedic Math divided into Speed calculation 1 & 2 • Counseling Box changes.
User Testing • V A MILE wrapped up. • Math Mile yet to be ‘post-produced’.Bandwidth clogged by • AIEEE. Should be on field by 23rd March. • Feedback form designed • Piloting to be wrapped up by 30th March • Operation Khoj • No specific input as yet w.r.t to NIIT having done some thing similar • Can we change the scope capturing inputs/opinions from people working on similar domains on what could go wrong and probable solutions?
Material Box Update • PEX template frozen • GRE template frozen. • CBTs, CAT, CD etc. - Shivku