An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Image or Graphic Susan Gray, Power Plant Research Program Presentation to PPRAC September 27, 2010

  2. UniStar - Constellation joint venture with EdF • Applications • State permit – Certificate of Public Convenience and Necessity (Maryland PSC) • Case 9127 – CPCN issued June 2009 • Case 9218 – CPCN issued August 2010 • Federal permit – Combined Construction and Operating License (NRC/USACE); PPRP – State lead for NRC review; Maryland participating as an “Interested State.”

  3. Barge Slip New UniStar Unit (CC3) New Intake Existing Intake Structure CC3 Hybrid Cooling Tower Existing 2 Units CC3 Switch Yard If constructed, CCU3 would be one of the largest nuclear plants in the world. Benefits would include ~350 new jobs and ~$20M annual property tax payments. Artist’s rendering

  4. Case 9127 - Impacts • Critical Area • Forest • Streams & Wetlands • Habitats • Oyster • Bald Eagle • Threatened/Endangered Species • Tiger Beetle • Showy Goldenrod • Archaeological/Historical/Cultural • Water • Air • Traffic ~ 100 recommended CPCN conditions

  5. Other Case 9127 CPCN Conditions: • Site Redress Plan • Significant reduction or elimination of ground water use from CCNPP 1 & 2 from CCU3 Desalination Plant (excess capacity) • Analyze alternatives for the unanticipated event of the unavailability of the desalination plant • CPCN reopened if Nuclear Regulatory Commission (NRC) conditions conflict with CPCN conditions • Draft EIS issued 04/2010: Consistent with CPCN Case 9217; did not address changes stemming from Case 9218. PPRP submitted comments to NRC 07/2010 (no major issues).

  6. Case 9127 CCU3 Air Permit Apply Best Available Control Technology: Cooling Towers (minimize salt drift by drift eliminators & limits on total dissolved solids) Emergency and Station Blackout Diesel Generators (minimize emissions by use of low-sulfur diesel fuel & limits on operation) Artist’s rendering

  7. Case 9218 Changes to the Air Permit: • minor changes to the layout or stack design of the air emissions • add two types of new air emission sources – two emergency fire water pumps and two sponge media blasting units

  8. USACE & MDE Ongoing Evaluations: Streams & Wetlands ~12 acres wetlands, 30 acres of wetland buffers and 8,000 linear feet of stream beds impacts will be mitigated by in-kind creation, restoration or enhancement elsewhere on the property.

  9. CPCN/CAC Approvals – done • USACE/MDE Review on Tidal & Nontidal Wetlands – in sync with NRC schedule • NRC process • Design Certification • Final EIS (02/2011) • Final SER (07/2012) • COL w/ITAAC NRC jurisdiction: Nuclear Waste Disposal Radiological Emergency Planning Decommissioning Risk Assessment Design Safety Analysis Site Specific Safety and Security Analyses

  10. Questions?