An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Commercial Operations Sub-Committee Update to RMS November 10, 2005

  2. COPS Update • COPS voted to approve a draft PRR that “sets a lower limit to the number IDR meters within a Meter Reading Entity (MRE) that would be considered when determining whether the IDR threshold requirement is met or not for true-up settlement.”There are situations where 1 missed read was close to delaying True-Up Settlement • Continuing the analysis of PRR 568 “Reducing Initial Settlement from 17 to 10 days.” At this time, the second review period has not completed both the Day 8 and Day 15 aggregation check points. Conference call set for Nov 9 for final data review. Progress on recommendation to implement PRR568 appears positive. Vote to be requested at the December TAC meeting.

  3. COPS / PWG Review of Commercial Settlement during Hurricane Rita • ERCOT staff presented UFE analysis for Sept 19 – 26 • UFE vacillated from -24 to +2% due to estimated usage from previous month’s avg daily use • ERCOT Load is approximately 50% IDR and 50% non-IDR • ERCOT processes calculate initial settlement usage from previous usage periods • Profiled ESIIDs use previous months avg daily kWh until a meter read for the period is available • IDR metered ESIIDs use similar day proxy data for initial settlement • Final and True-up Settlements are expected to have estimated use replaced with “actual” meter reads

  4. TDSP Activity - Hurricane Rita • TDSPs estimated reads due to adverse conditions: • Reported estimates for non-IDR meter reads only • Utilized standard VEE Uniform Business Practice rules for estimating • No unusual adjustments were applied to the estimates • AEP estimated 8500 reads across 2 cycles • CNP estimated 250,071 reads across 8 cycles • TNMP estimated 15,000 reads across 3 cycles • TXU ED estimated 100 reads – no cycles missed

  5. Identified Concerns • All solutions will create financial winners and losers • Some MPs self adjusted schedules assuming load loss during the hurricane • Adjusting Profiles after the fact may undermine MPs that adjusted schedules in the day ahead processes • Concerns that a historical correction is inappropriate given the large bi-lateral ERCOT market

  6. Recommendations: • COPS voted to not adjust backcasted profiles due to events around Hurricane Rita • COPS agreed an additional settlement was not necessary between Final and True-Up • COPS recommends PWG identify ways to accommodate extreme events on the Settlement Process

  7. TAC/TNT TaskForce Update BJ Flowers November 3, 2005

  8. TAC/TNT TaskForce Update • Two special meetings were held to identify issues/gaps with TNT Transition Plan (TP) • Basic philosophy of TP has been kept intact • Added definition of Business Requirements, Conceptual System Design, RFI, RFP, Daylight Saving Time, and Emergency Electric Curtailment Plan • Added clarity to voting process • Effort to ensure all effected parties have ample opportunity to participate • Effort to ensure Market has protection mechanisms in the event computer systems or market design has limitations • Added clarity to high level process flow which Ron Hinsley presented

  9. TAC/TNT TaskForce Update Motion to accept the Nodal Transition Plan document as amended and to immediately create a Nodal Transition Plan Task Force (NTPTF) was approved.