1 / 10

B eams for E uropean N eutrino E xperiments ( BENE ) subtitle:

B eams for E uropean N eutrino E xperiments ( BENE ) subtitle: A Network aiming at a consensual road map for accelerator based neutrino programs in Europe. International Scoping Study of a future Neutrino Factory and Superbeam facility ( ISS ). FP7 Design Study

sunila
Download Presentation

B eams for E uropean N eutrino E xperiments ( BENE ) subtitle:

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Beamsfor European Neutrino Experiments (BENE)subtitle: A Network aiming at a consensual road map for accelerator based neutrinoprogramsin Europe International Scoping Study of a future Neutrino Factory and Superbeam facility (ISS) FP7 Design Study of next European Accelerator Neutrino Facility “Euroν”DS in world wide collaboration WorldDS A complex multi-parameter problem V. Palladino Report on BENE Activities

  2. Major Strategic decisions V. Palladino Report on BENE Activities

  3. Since CAREO5 2nd meeting of the ISS in KEK in Jan Orsay Strategy Group Symposium Feb 1 BENE Midterm Report 3rd meeting of the ISS in RAL (24-27 Apr) BENE FP7/IDS Day 28 April LOI !!!! Last meeting of the ISS at NuFact06 late Aug V. Palladino Report on BENE Activities

  4. Exploring all possible FP7 plans • Design study Euroν Feasibility studi(es) “RTD” TPW • Specific ν I3 with several JRAs • JRA(s) in CARE2 V. Palladino Report on BENE Activities

  5. BENE : the longer term plan 2005 06 07 08 09 10 11 19 Construction window Int. Scoping Study(*) feasibility Design Study Physics Feasibility & TPW CDR … at the time of end of LHC payment first LHC results ILC decision be ready to catch any construction window HIPPI, HARP MERIT MICE PRISM, EMMA NB Betabeam CDR End 2009 ! V. Palladino Report on BENE Activities

  6. Milestones & Deliverables BENE III periodJan 06 - Jun07 Jan Feb Mar Apr May Jun Jul Aug Sep Nov Dec Jan Feb Mar Apr May Jun BENESG 1/ month V. Palladino Report on BENE Activities

  7. Acomplete Euro-Neutrino Design Study physics, accelerators, detectors, baselines ISS= International Scoping Study … American and Asian collaborations as full partners June 2005 to late 2006: mostly neutrino factory & superbeams define priorities and ways of Design Study consolidate regional & international collaboration us in EU, gain support of Council and ECFA IDS = International Design Study (neutrino factory & superbeams & betabeam) start late 2006 or early 2007 achieve higher funding, start design effort us in EU, prepare FP7 Proposal (March 2007, it seems) structure EU collaboration, get CERN involved as much as possible FP7 DS = EC (support for EU effort in the) Design Study … CNGS & beyond aiming at first EC funds Jan 1, 2008 inter-twined with IDS keeping American and Asian collaborations as full partners …. T2K , Nova Goal: Conceptual Design Report of a European Precision Neutrino Facility by end 2010 is next natural step for accelerator νISS & IDS/FP7 DS CDHS CHARM I/II CHORUS NOMAD OPERA ICARUS BENE V. Palladino Report on BENE Activities

  8. guessing the Content of the Design Study conceptual feasibility study of the following components: a high power proton driver of at least 4-5 GeV the engineering of the handling, containment and safety aspects of a hi power target & collection station a performing and cost effective muon phase rotation and cooling channel non-scaling FFAGs for acceleration of muons (and possibly protons) an optimised storage ring for muons higher intensity and higher gamma beta beams technical preparatory (R&D) projects, aiming at demonstrating: the existence of at least one adequate choice of target an extended lifetime of the horn prototypes at high rate and radiation muon ionization cooling, by completion of the MICE experimental program operation of a non-scaling FFAG RF cavities and kicker magnets for fast manipulation of muon beams + specific detector R&D and design efforts on : photo detector development for very large far detectors developments of the liquid argon technique including the presence of magnetic field study and tests of a magnetic calorimeter susceptible to be built with a mass of up to 100 kton. detectors dedicated for tau detection such as the emulsion cloud chamber last but not least the necessary near detector concepts and beam instrumentation V. Palladino Report on BENE Activities pre-submitting it now to ECFA/ESGARD scrutiny

  9. V. Palladino Report on BENE Activities

  10. V. Palladino Report on BENE Activities

More Related