stan
Uploaded by
95 SLIDES
1318 VIEWS
1000LIKES

Species Interaction

DESCRIPTION

Species Interaction. Species Interact in Five Major Ways. Interspecific Competition Predation Parasitism Mutualism Commensalism. Interspecific Competition. Occurs when members of two or more species interact to gain access to the same limited resources such as food, light, or space.

1 / 95

Download Presentation

Species Interaction

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Species Interaction

  2. Species Interact in Five Major Ways • Interspecific Competition • Predation • Parasitism • Mutualism • Commensalism

  3. Interspecific Competition • Occurs when members of two or more species interact to gain access to the same limited resources such as food, light, or space

  4. Predation • Occurs when a member of one species (the predator) feeds directly on all or part of a member of another species (the prey)

  5. Parasitism • Occurs when one organism (the parasite) feeds on the body of, or the energy used by another organism (the host), usually by living on or in the host

  6. Mutualism • Is an interaction that benefits both species by providing each with food, shelter, or some other resource.

  7. Commensalism • Is an interaction that benefits one species but has little, if any, effect on the other.

  8. These interaction: • have significant effects on the resource use and population sizes of the species in an ecosystem. • also influence the abilities of the interacting species to survive and reproduce, thus serve as agents of natural selection

  9. Competition • The most common interaction • The niches of two species overlap when they are competing for the same resources.

  10. Competitive exclusion principle • Two species can’t occupy exactly the same ecological niche for very long.

  11. If one species can take over the largest share of one or more key resources, the other competing species must: • Migrate to another area (if possible) • Shift its feeding habits or behavior through natural selection • Suffer a sharp population decline • Become extinct in that area

  12. PREDATION

  13. Predators • Herbivores • Carnivores • Omnivores

  14. Methods to capture preys • Herbivores: just walk, swim, fly • Carnivores: • pursuit, • ambush, • camouflage, • chemical warfare

  15. Prey Adaptations • Avoid detection • camouflage, mimics, • diurnal/nocturnal

  16. Prey Adaptations • Avoid detection • camouflage, mimics, • diurnal/nocturnal • Avoid capture • flee • resist • escape

  17. Prey Adaptations • Avoid detection • camouflage, mimics, • diurnal/nocturnal • Avoid capture • Protective shells • Thick bark • Spines and thorns • Chemical warfare

  18. At the individual level, members of the predator species benefit and members of the pray species are harmed. • At the population level, predation plays a role in evolution by natural selection.

  19. Coevolution • Evolution in which two or more species interact and exert selective pressures on each other that can lead each species to undergo adaptations. • Ex. Predator-prey, parasite-host

  20. Symbiosis: Mutualists, Commensalists and Parasites

  21. Parasitism • Occurs when one species (the parasite) feeds on the body of, or the energy used by, another organism (the host), usually by living on or in the host. • The parasite benefits and the host is harmed but not immediately killed

  22. Parasitism • Parasite usually is smaller than host • Live on • Live in • Little contact

  23. Mutualism DEFINITION: An interaction between two individuals of different species that benefits both partners in this interaction

  24. Pollination • Animals visit flowers to collect nectar and incidentally carry pollen from one flower to another • Animals get food and the plant get a pollination service

  25. Yucca and Yucca Moth • Yucca’s only pollinator is the yucca moth. Hence entirely dependent on it for dispersal. • Yucca moth caterpillar’s only food is yucca seeds. • Yucca moth lives in yucca and receives shelter from plant.

  26. Lichen (Fungi-Algae) • Symbiotic relationship of algae and fungae…results in very different growth formas with and without symbiont. • What are the benefits to the fungus?

  27. Commensalists • Benefit from the host at almost no cost to the host • Birds nesting in trees • Eyelash mite and humans • Sharks and remora

  28. To avoid or reduce Competition • Some species develop adaptations that allow them to reduce or avoid competition with other species for resources. In other words, some species evolve to reduce niche overlap.

  29. Resource Partitioning • Process of dividing up resources in an ecosystem so that species with similar needs (overlapping ecological niches) use the same scarce resources at different times, in different ways, or in different places.

  30. Population Growth • No population can continue to grow indefinitely because of limitations on resources and because of competition among species for those resources.

  31. Populations Have Certain Characteristics • Populations differ in • Distribution • Numbers • Age structure • Density

  32. Populationdynamics • Is a study of how these characteristics of populations change in response to changes in environment conditions.

  33. Changes in population characteristics due to: • Temperature • Presence of disease organisms or harmful chemicals • Resource availability • Arrival or disappearance of competing species

  34. Most Populations Live Together in Clumps or Patches • Population distribution • Clumping (Ex. Wolf packs, desert vegetation around springs,…) • Uniform dispersion ( Ex.Creosote bushes in a dessert) • Random dispersion (Ex. Dandelions)

  35. Why clumping? • Species tend to cluster where resources are available • Groups have a better chance of finding clumped resources • Protects some animals from predators • Packs allow some to get prey • Temporary groups for mating and caring for young

  36. The living world is mostly clumpy and patchy

  37. Populations Can Grow, Shrink, or Remain Stable • Population size governed by • Births • Deaths • Immigration • Emigration • Population change = (births + immigration) – (deaths + emigration)

  38. Age structure • Pre-reproductive age • Reproductive age • Post-reproductive age • The size of a population with a fairly even distribution among these three age groups tends to remain stable.

  39. No Population Can Grow Indefinitely: J-Curves and S-Curves • Biotic potential: capacity for population growth under ideal conditions. • Low • High • Intrinsic rate of increase (r): is the rate at which the population of a species would grow if it had unlimited resources. • Individuals in populations with high r • Reproduce early in life • Have short generation times • Can reproduce many times • Have many offspring each time they reproduce

  40. No Population Can Grow Indefinitely: J-Curves and S-Curves • Size of populations limited by • Light • Water • Space • Nutrients • Exposure to too many competitors, predators or infectious diseases

  41. Environmental resistance: Is the combination of all factors that act to limit the growth of a population. • Carrying capacity (K): The maximum population of a given species that a particular habitat can sustain indefinitely without being degraded. • The growth rate of a population decreases as its size nears the carrying capacity of its environment.

  42. Exponentialorgeometricgrowth • Exponential growth: starts slowly but then accelerates as the population increases, because the base size of the population is increasing (J-shaped growth curve)

More Related