1 / 16

ACS Chronology

ACS after SM4: New Life for an Old Workhorse David Golimowski Space Telescope Science Institute 22 July 2010. March 2002: ACS installed in HST during Servicing Mission 3B (STS-109) June 2006: Failure of Side 1 LVPS. Switch to redundant Side 2 electronics. All camera operations restored.

Download Presentation

ACS Chronology

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. ACS after SM4:New Life for an Old WorkhorseDavid GolimowskiSpace Telescope Science Institute22 July 2010 2010 STScI Calibration Workshop

  2. March 2002: ACS installed in HST during Servicing Mission 3B (STS-109) • June 2006: Failure of Side 1 LVPS. Switch to redundant Side 2 electronics. All camera operations restored. • January 2007: Failure of Side 2 LVPS or APB. Loss of WFC and HRC operations; SBC still operational. • May 2009: ACS-R hardware installed during Servicing Mission 4 (STS-125). WFC and SBC pass Aliveness and Functional Tests; HRC not recovered. ACS Chronology STS-125 astronauts Drew Feustel and John Grunsfeld during EVA-3 2010 STScI Calibration Workshop

  3. Four major components of ACS-R: • CCD Electronics Box Replacement (CEB-R) • Low Voltage Power Supply Replacement (LVPS-R) • Power Intercept Element (PIE) • Power Output Element (POE) The ACS Repair (ACS-R) 2010 STScI Calibration Workshop

  4. Main CEB-R features: • Teledyne SIDECAR* ASIC** permits optimization of WFC performance via adjustment of CCD clocks, biases, and pixel transmission timing • Built in oscilloscope mode (O-mode) that allows sensing of analog signal from each output amplifier The CEB-R * System for Image Digitization, Enhancement, Control, and Retrieval ** Application Specific Integrated Circuit 2010 STScI Calibration Workshop

  5. Ground testing: • Verified performance of CEB-R with flight-spare WFC, but not actual flight WFC  SITe CCD performance highly variable • Revealed non-ideal transient settling behavior in external preamp  Preamp not replaced by ACS-R, so behavior with CEB-R not verifiable • Revealed noise dependence on timing of data transmission from CEB-R to MEB WFC Optimization Campaign (1) On-orbit testing: • To satisfy requirement that WFC perform at least as well as before, CEB-R must accommodate above uncertainties via flexible, programmable settings • Need iterative campaign to optimize CCD read noise, gains, linearity, full well depth, CTE, cross-talk 2010 STScI Calibration Workshop

  6. Strategy: • Perform up to 8 iterations of comprehensive CCD performance tests and exploratory adjustments of bias voltages, clock rails, and data transmission timing via uplinked commands to ASIC • Start with pre-failure default CCD voltages and timing patterns as baseline, then vary appropriate values to investigate specific conditions • Converge to optimal settings; truncate Optimization Campaign if possible • Select default CDS mode (dual-slope integrator or clamp-and-sample) • Modify flight software and assembly code to conform to optimal settings WFC Optimization Campaign (2) 2010 STScI Calibration Workshop

  7. OC began 28 May 2009 with pre-SM4 default (old CEB) voltage & timing settings • Initial performance matched or exceeded projections and expectations. Dark current, CTE, and hot pixels consistent with prolonged radiation exposure. • Dual-slope integrator (DSI) selected as default CDS mode • Gradient of 5-10 DN caused by slow drift of bias reference voltage after readout of each row of pixels. Gradient is stable and removable. • Low level (±1 DN) bias stripes caused by 1/f noise generated by ASIC during bias voltage offset. • OC ended 3 Jun 2009 due to anomaly in WFC2 for non-default VOD. Pre-SM4 default settings adopted for all post-SM4 operations. OC Results 2010 STScI Calibration Workshop

  8. WFC Performance Summary       * Projected and problematic values from Gilliland et al. 2008 (TIR ACS 2008-04) . **Signal-dependent shift due to incomplete settling of reference voltage in DSI high-pass filter. Effect can be corrected by software algorithm. 2010 STScI Calibration Workshop

  9. WFC Dark Current History 12 hr anneal 6 hr anneal 6 hr anneal -77 C -77 C -81 C  2010 STScI Calibration Workshop

  10. WFC CTE History • EPER test shows worse than expected CTE degradation (0.99989 vs. 0.99992), but… • Evolution of deferred-charge trails from hot pixels show degradation consistent with expectation • Pre-SM4 correction formulae for WFC and HRC aperture photometry valid for post-SM4 data (Chiaberge ISR 2009-01) • Empirical pixel-based CTE corrections now a reality ! (Next talk by Jay Anderson) 2010 STScI Calibration Workshop

  11. WFC Bias and Dark Frames bias “gradient” (5-10 DN) bias stripes (± 1 DN) Superbias - 1 full anneal cycle (DSI; 34 frames) Superdark - 1/2 anneal cycle (DSI; 24 frames) 2010 STScI Calibration Workshop

  12. Caused by 1/f noise (1 mHz to 1 Hz) in bias reference voltage after CDS (Talks by Bernie Rauscher and Markus Loose) • Appears in both DSI and C&S frames • Stripes vary by  ~ 0.75 e–; negligible relative to read noise • Noise is correlated; may affect photometry of the faintest sources • Software developed to mitigate effect (Poster A2 by Norman Grogin) Bias Stripe Effect 2010 STScI Calibration Workshop

  13. Bias Stripe Removal (before) (after) 2010 STScI Calibration Workshop

  14. Gain = 2 e–/DN NGC 4701 (pre-SM4) NGC 6217 (post-SM4) Cross Talk (See poster A3 and ISR ACS 2010-02 by Anatoly Suchkov, et al.) 2010 STScI Calibration Workshop

  15. ACS record after SM4: 1 win (WFC), 1 loss (HRC), 1 tie (SBC) • ACS-R Optimization Campaign showed that WFC read noise, linearity, full-well depth, and cross-talk match or exceed pre-SM4 levels • CTE, hot pixels, dark current have degraded to levels consistent with prolonged exposure to HST’s radiation environment • Bias gradient of 5-10 DN caused by a slow drift of the DSI reference voltage during and after the readout of each row of pixels; stable and removable • Low level (1 DN) bias stripes caused by 1/f noise in bias reference voltage set after CDS stage of signal processing chain; not reproducible from frame to frame • Algorithms for mitigating bias stripes and pixel-to-pixel CTE correction will be available to users very soon; STScI is investigating implementation into calacs. Summary 2010 STScI Calibration Workshop

  16. PI: Ed Cheng (Conceptual Analytics) ACS-R Design and Optimization Teams STScI: George Chapman, Marco Chiaberge, Tyler Desjardins, Tracy Ellis, David Golimowski, Norman Grogin, Pey-Lian Lim, Ray Lucas, Aparna Maybhate, Max Mutchler, Merle Reinhart, Marco Sirianni (ESA/ESTEC), Linda Smith, Anatoly Suchkov, Alan Welty, Tom Wheeler GSFC: Steve Arslanian, Kevin Boyce, Darryl Dye, Olivia Lupie, Kathleen Mil, Barbara Scott, Beverly Serrano, Augustyn Waczynski, Erin Wilson Teledyne: Markus Loose (Markury Scientific), Raphael Ricardo 2010 STScI Calibration Workshop

More Related