Scrap Convergence Plan Wuhan lens line #1 Update Feb 5 th

Scrap Convergence Plan Wuhan lens line #1 Update Feb 5 th. Frédéric MORET. Feb 5, 2007. Scrap Convergence Plan – Wuhan lens line #1 Background. Wuhan lens line #1 results were: > 50% scrap rate < 40% normal capacity since it started in April 2006.

sherry
Download Presentation

Scrap Convergence Plan Wuhan lens line #1 Update Feb 5 th

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Scrap Convergence Plan Wuhan lens line #1 Update Feb 5th Frédéric MORET Feb 5, 2007

  2. Scrap Convergence Plan – Wuhan lens line #1Background • Wuhan lens line #1 results were: • > 50% scrap rate • < 40% normal capacity since it started in April 2006

  3. Scrap Convergence Plan – Wuhan lens line #1 Background • VLS fast recovery plan • 20% scrap rate target by end of Jan 07 for Wuhan lens line #1 • Branch coating specialist staying in Wuhan forcing results • No recorded scrap improvement after 2 months • Decision to launch scrap convergence plan on Jan 3 in order to achieve VLS fast recovery plan target

  4. Scrap Convergence Plan – Wuhan lens line #1 Scope • To reduce Wuhan lens line #1 average scrap rate: • From >50 to 20% from February 1st, 2007 • From 20 to 10% from April 1st, 2007 • Include trainings & networking to keep consistent results over time

  5. Scrap Convergence Plan – Wuhan lens line #1 Latest scrap & production weekly results Arrival of Branch team. Reduction of cycle times W2 & 3: Trials & tunings resulting in scrap Close to target before Feb 1st

  6. Scrap Convergence Plan – Wuhan lens line #1 Agenda of presentation • Step II: Achievements & status • Team, organization & trainings • Capacity • Equipment • Molding • Coating • Inspection • Step III: Action plan & expected results

  7. Scrap Convergence Plan – Wuhan lens line #1 Team Decision for new organization Arrival of Branch team in Wuhan 2 people in charge of new T21 jigs Integration of 2 jig makers Production of W5 totally managed by Wuhan team without any support of Branch team

  8. Scrap Convergence Plan – Wuhan lens line #1 Organization Change in organization since Jan 26, 2007 to restore « process » APU structure « Product » APU organization since Sept 1, 2006 People having background to manage lens line Champion for lens line scrap reduction Future Champion for lens scrap reduction to be coached by present one Champion for HL assembly

  9. Scrap Convergence Plan – Wuhan lens line #1 Trainings • Trainings done • In meeting room • 5 courses • Reaction modes for: • Molding defects • Grain defect (varnishing) • Fallen lens & varnish dot defects (varnishing) • Inspection • IRIS • Lens inspection • 30-35 people attending each time • OJT • 5 trainings • Supplier for jig manufacturing • Production team for jig tuning • Production team for molding • Maintenance team • Quality inspection

  10. Scrap Convergence Plan – Wuhan lens line #1 Documentation • Database • All results & documents related to this plan, including updated action plans • All data related to lens line & its maintenance • Booklet • Reaction modes • Working instructions • Main messages of trainings

  11. Scrap Convergence Plan – Wuhan lens line #1 Organization • Further improvements of the team • Coaching of line supervisor by APU manager • Varnishing method engineer position to fill

  12. Scrap Convergence Plan – Wuhan lens line #1 Capacity • Capacity issue because of low « real » TRS • Snowball effect • Not enough capacity • No time to improve • More inefficiency • 1st priority has been to recover capacity and to use it for improving: • Reduce injection cycle time (-24%) • Reduce changeover time by installing a fork on press platen (-30%) • Learn team how to avoid stoppages • Do not accept new product trials which are not mandatory

  13. Scrap Convergence Plan – Wuhan lens line #1 Equipment • No major issue on equipment & maintenance • Haitian press & Wittmann robot • No major issue • Maintenance action plan done: Hot runner heater changed, robot gear changed • Saico line • No major issue • Maintenance globally well done • Maintenance action plan done: 13 improvements, detailed maintenance documents

  14. Scrap Convergence Plan – Wuhan lens line #1 Achievements & Status • Molding • Molds • X11J: No major issue • R23: Small crack issue, solved by team (change in tool) • T21: Silver streak (5%) because of poor design & making of tool, cannot be solved by process, needs a tool improvement (on-going action plan). Design of new tool (expected by end of March) checked. • Operation • Black dot scrap reduced by avoiding stoppages and respect of re-start instruction

  15. Scrap Convergence Plan – Wuhan lens line #1 Achievements & Status • Coating • Jigs • For all: poor making and bad tuning • In-feed conveyor: All jigs tuned as well as possible, new jig design tested on Feb 1st • Varnishing conveyor: • X11J & R23: Tuning of jig improved • T21: New design of jig tested, complete new set done, installed on Feb 1st • Process • No major issue, some flow-coater tunings have been improved • Operation • Bad jig design and tuning results in many door opening (to set lens on jig) and so many grain and varnish dot defects. Improved by team, still possible to improve.

  16. Scrap Convergence Plan – Wuhan lens line #1 Jig sub-project • Design & manufacturing of new T21 jigs as a project • Selection of supplier (8 visited), 1 selected • Good design & manufacturing means, but no autonomy in design & manufacturing • Training of supplier for design, prototyping & manufacturing • Making & test of prototype 1: OK • Making & test of prototype 2 (simplified design): OK • Making of complete set • Installation & tuning of complete set on Feb 1 • Detailed manufacturing instruction provided

  17. Scrap Convergence Plan – Wuhan lens line #1 Achievements & Status • Quality inspection & logistics • IRIS • Badly known and implemented resulting in overquality. Training provided, tools updated. • Production quality • Defects badly known by operators. No inspection standard per product. Setting of operator training by quality each 2 weeks. Update of all inspection standards. • Re-organization of line quality, in order upstream quality engineer is now in charge of auditing quality of all actions on the line. • QRAP restarted. • Rules for standard reaction defined (line QRQC). Action plan defined with quality, time schedule to be defined with APU manager and supervisor. • Line management: Display boards re-organized to provide just necessary up-to-date information • Logistics • Use of cardboxes, plastic bags and foam sheets for packaging WIP lenses resulting in many wastes (operator time, footprint, scrap, packaging materials). Was limitating cycle time reduction.Replaced by standard lens plastic totes. • Scrap follow-up sheet (Kosu sheet) • Sheet updated for defect definition (more precise), removal of injection trial shots. Change to be made to remove a mistake in fallen part calculation. • STOP Scrap • Standard display of trend charts and action plans for X11J and T21. Definition of scrap convergence plan actions according to STOP Scrap system.

  18. Scrap Convergence Plan – Wuhan lens line #1 Step II • Main issues remaining on Jan 22 • Varnish dot defect on T21 (18% of total scrap) • Only solution is new jig (tested, production of complete set followed-up by Marc Bourgeois) • Grain defect on X11J (16% of total scrap) • Closed door operation (to be followed-up by supervisor) • Silver streaks on T21 (9% of total scrap) • Injection process parameters to be developed by Maxime Hugol • Fallen parts on all products (7% of total scrap) • Robot & jig tuning (to be followed-up by supervisor) • Stoppages, maintenance & changeover delays (5% of total scraps, 40% of productive time) • Short mold changeover device to be used, maintenance & operation management (to be followed-up more closely by maintenance manager & supervisor)

  19. Scrap Convergence Plan – Wuhan lens line #1 Step II • Roadmap defined on Jan 22 • W4: Closed door operation for X11J, jig tuning for fallen parts, closer management to reduce stoppage & changeover times • W5: New jig for T21, new injection process parameters for T21, jig tuning for fallen parts, closer management to reduce stoppage & changeover times • W6 & W7: Tunings to decrease rate of other scraps

  20. Scrap Convergence Plan – Wuhan lens line #1 Step III • To reduce Wuhan lens line #1 average scrap rate: • From 20 to 10% from April 1st, 2007 • Definition of action plans in progress • 2nd period of Branch team defined (3 weeks in March)