An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. CURRENT STATUS OF STEPModule 5Estimated Viewing Time: 30 Minutes STEP MANAGEMENT OVERVIEW

  2. Sponsored By The NationalInstitute of Standards & Technology Developed Under Contract by: Product Data Integration Technologies, Inc. 100 W. Broadway, Suite 540 Long Beach, CA 90802

  3. Topics for This Module STEP Current Development Status • This section describes the availability of STEP resources and Application Protocols for use by industry. STEP Current Implementation Status • This section describes the state of industry implementation of STEP and the availability of supporting development and implementation tools.

  4. STEP Current Development Status

  5. When is STEP available? • Basic STEP capability has been available since December 1994. • 12 Parts registered as ISO 10303 international standards in December 1994. This is the “Initial Release”. • This includes 2 AP’s (Part 201) address the exchange of 2D drawing data and (Part 203) 3D design data under configuration control and included in the 12 parts. • Continuing STEP development schedule is aggressive (as of 1/1/96) • 10 AP’s are in different stages of ballot cycle to be standardized. • 7 additional APs have industrial validation and 3 of them are technically complete. • 11 new APs have been approved as active development projects.

  6. STEP Development Industry-Specific Views (1 of 2) • Discrete Manufacturing • Product Design Configuration Management • Core Data for Automobile Industry • CAD System Shape Geometry for Mechanical Product Design • Engineering Drawing Information • Manufacturing Technologies: Composites, NC Process Planning, Casting, Forging • Electrical and Electronics • PCA, PCB and Component Design • Electronic Test Diagnostic and Remanufacture • Electrotechnical Plant Design and Installation

  7. STEP Development Industry-Specific Views (2 of 2) • Architecture and Construction • Building Element Shape Design • Ship Building • Building Construction Core Model • Building Services: Heating, Ventilation and AC • Building Structural Frame: Steelwork • Process Plants • Plant Spatial Configuration • Plant Functional Design • Process Engineering

  8. AP Current Development Status(as of 1 Jan 1996) IS 201 202 203 204 205 207 208 209 210 211 212 213 214 215 216 217 218 220 221 222 223 224 225 226 227 228 229 230 231 DIS Standardize CD Specification AIM ARM Requirements AAM

  9. STEP CURRENT IMPLEMENTATION STATUS

  10. STEP Usage and Implementation • Many companies are experimenting with various implementations, several are at the pilot or production usage stage. • Some commercial CAD vendor translators are available, with many more are under development: UNIGRAPHICS, CATIA, ProEngineer. • Many commercial software toolkits are available for development, STEP browsing, and implementation. • Training and consulting services are commercially available for STEP development and implementation.

  11. Current Implementation Status Example Application Protocol Prototype, Demo, and Pilot Development Projects in the U.S. AEROSTEP: AP203 (Boeing, GE) AWS: AP203 (IBM, Lockheed, NG) GM/EDS Prototype: AP207 (GM/EDS) PAS-C: AP209 (Lockheed, Vought, Boeing) PAP-E: AP211 (Intermetrics, TRW, WH) PDXI: AP 231 (Chevron, DuPont, and others) PlantSTEP: AP 227 (The top 10 Plant Design Vendors) PREAMP: AP210,AP 220 (Hughes, MMA, Rockwell, Boeing) RASP: AP210 (Ford, UTC, Hughes, MMA, TI) PEP: AP201 and 203 (DoD Joint Center - FCIM/IPDE) RAMP: AP224 (Grumman)

  12. STEP Centers Examples of established centers to accelerate the development and implementation of STEP: PDES, Inc. - US, UK aerospace/automobile PROSTEP - Germany automobile Japan STEP Center - Japan C-STEP - China PISTEP - UK process PlantSTEP - US and Japan process ind. PDXI - US and Europe process ind. Nat’l PDES Testbed - US GOSET - France STEP Data Ex. Ctr. - Australia

  13. STEP Production Software Tools -- (1 of 2) ORGANIZATIONSOFTWARE TOOLS Cadlab ICE Toolset Canonical ExWare CIMIO EXPRESS-M schema mapping CSTB SPDI Station DCM DCMem DEC DECexpress EPM EDM Erlangen fedex Fraunhofer-IGD Xpresso as of 1/1//96

  14. STEP Production Software Tools -- (2 of 2) ORGANIZATION SOFTWARE TOOLS GE EDEX - EDitor for EXpress GIDA EXEP Tool Kit GOPAS ExpressLab IDA Pstep-CaseLib ITI(OH) PDE/Lib NIST NIST STEP Toolset PDIT FirstSTEP Toolkit Siemens EXPREME STEP Tools ST- Toolkit Theorem AP203 browser, editor, viewer Versant EXPRESS/STEP as of 1/1//96

  15. Leading CAD/CAM HW & SW Mfgrs Ranked by 1992 Market Share Unknown IBM Hewlett Packard Legend Implementing STEP Mentor Graphics No current commitments Autodesk Intergraph Cadence Designer Sys, Computervision Source: Electronic Business, April 93, p 75

  16. CAD/CAM Sector's Top 10 in 1994 Software Revenue Totaled $4.1B Cadence Design Sys. Intergraph IBM Computervision Parametric Autodesk EDS Unigraphics SDRC Legend Mentor Graphics Implementing STEP No current commitments Synopsys Unknown Hausman, Eric, "CAD/CAM Sector's Top 10, " Computer Reseller News, Dec 5, 1994

  17. CAD/CAM/CAE Software Market Projected Revenue of Top 7 - 1995 Unknown Legend Implementing STEP No current commitments Struct. Dynamics Synopsys Inc. Autodesk Computervision ParametricTech IBM/Dassault Systems Intergraph Percentages based on $4.6B total market projection. Source: Computer Reseller News , April 10, 95, n625, p 47(1)

  18. Plant Design CAD Software Vendors • Top Five Vendors (and the next three as well) are all implementing STEP. $20 $15 $10 Million $ Revenue $5 $0 Dassault Dassault (CATIA) (CATIA) Intergraph Intergraph Source: DARATECH 1995 estimates CADCentre CADCentre EA Systems EA Systems Computervision

  19. CURRENT STATUS OF STEPEnd of Module 5