Company / Industry / Firm Logo ( if there is). Design of a Bus Attendant Calling System. 200614040 – Ümit Cihan YILMAZ. Supervisor (s): Prof. Dr. Yahya Kemal BAYKAL Assoc . Prof. Dr. Klaus Wern er SCHMIDT Asst . Prof. Dr. Çağlar ARPALI. Introduction Project Plan
E N D
Company/Industry/Firm Logo (ifthere is) Design of a Bus Attendant Calling System 200614040 – Ümit Cihan YILMAZ • Supervisor(s): Prof. Dr. Yahya Kemal BAYKALAssoc. Prof. Dr. Klaus Werner SCHMIDT Asst. Prof. Dr. Çağlar ARPALI
Introduction • Project Plan • Works havebeencarriedoutso far • Conclusion • ShortInformationaboutcompany • FutureWork Outline ECE 491 IntermPresentation 09:12:2012 (Date)
Project aim :If a passenger needs some service , basicallycallingbusattendant. • Informationabouttheproject : • CAN (CommunicationArea Network) in a bus. • Howtodesign CAN (CommunicationArea Network) System in a bus ? • Theoutputs of theproject : • Ifbutton is pressed (Bit5=0) , ledoff (Bit4=1). • Otherwise ; led on (Bit4=0) Introduction ECE 491 IntermPresentation 09:12:2012 (Date)
Howtodesign CAN (CommunicationArea Networks) in a bus , as a basically in hardware ? • AttendantCard • PassengerCard • RibbonCable • LCD Screen • PowerSupply (+5V) • AVR-JTAG USB Connector • Button (+5V) ECE 491 IntermPresentation 09:12:2012 (Date)
Controlledthe CAN System. • Writing C codesconnectwith CAN System. Project Plan ECE 491 IntermPresentation 09:12:2012 (Date)
Set up – CAN System’shardwares. • Whichresearched software programmingsareto be compatiblewiththe AVR-JTAG USB connector. • Designnewbutton. • Writing C codeforbutton. • I achieved Sanayi Bakanlığı TEKNO Girişim and TUBITAK 2209 number of projectawards. Works carriedoutso far in studies ECE 491 IntermPresentation 09:12:2012 (Date)
Writing C codeforbutton. ECE 49X Interm/Final Presentation DD:MM:YYYY(Date)
Theoutputs of theprojectso far • Laboratory Setup with two cards: Passenger Card and Attendant Card. • CAN (CommunicationArea Networks) communication: PassengerCard requests/cancels service – AttendantCard acknowledges/displays requested service. • Only shows one request. • Components: 2 CAN (CommunicationArea Networks) development boards, LCD display, service button. Conclusion ECE 491 IntermPresentation 09:12:2012 (Date)
Thethingslearnedduringtheprojectstudies : • AVR Studio 4 usage (programming). • WIN AVR usage (compilation). • C-programming. • LCD display controle. ECE 49X Interm/Final Presentation DD:MM:YYYY(Date)
MAN Türkiye A.Ş establish in 1966. • Majoractivity of company : • Bus of Industry : • ComfortableTravellingdesignforpassenger. • Truck of Industry : • TransportingTruck • LongVehicleTruck Informationaboutthefirm/company/industry ECE 491 IntermPresentation 09:12:2012 (Date)
DC converter from 24V (bus supply) to 5V (card supply). • Passenger Card and Attendant Cardsoftware for more cards. • Display of multiplerequests. • Data logging on AttendantCard (when is most frequently used). FutureWork ECE 491 IntermPresentation 09:12:2012 (Date)
Thankyouforlisteningtome . . ECE 49X Interm/Final Presentation DD:MM:YYYY(Date)