1 / 11

Integrated Baseline Review (IBR) Project Name

Integrated Baseline Review (IBR) Project Name. Project Manager’s Name Date. WBS/Work Description/Requirements. Basis Of Estimate (BOE). Time-phased Resources ($). Product Delivery. Ver Test. PDR. CDR. Time-Phased BCWS ($). EAC. Schedule. Work/Planning Package Summary.

sancho
Download Presentation

Integrated Baseline Review (IBR) Project Name

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Integrated Baseline Review (IBR)Project Name Project Manager’s Name Date

  2. WBS/Work Description/Requirements

  3. Basis Of Estimate (BOE)

  4. Time-phased Resources ($)

  5. Product Delivery Ver Test PDR CDR Time-Phased BCWS ($) EAC

  6. Schedule

  7. Work/Planning Package Summary

  8. Subcontractor/Other Govt. Activities

  9. Risk Matrix 100% 4,5 1,2 80% 9 3 6 Likelihood 60% 7,8 40% 10 4 20% 1 2 3 5 Consequences Top Risk List & Risk Matrix (Example)Program/Project Name from date last review to date current review

  10. R Y G G R Y Executive Summary Cost (Funding) Cost (EAC) Schedule Technical Performance Risk Management Issues: Contractor Transition Installation Process FR Upgrade

  11. Quantified Risk

More Related